Site_Visit_Questions_07252018.docx
DOCX document 13 KB Posted
- Attached to
- B5444 Roof Replacement Federal contract opportunity
- Solicitation number
- FA4484-18-R-0013
About this file
Site Visit Questions and Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA448418R00130002.docx | DOCX document | |
| 5444_Floor_Plan.pdf | ||
| Site_Visit_Meeting_Minutes.pdf | ||
| Attendance_Sheet.pdf | ||
| FA448418R00130001_Amendment.pdf | ||
| J-4_JB-MDL_B5444_SOW_Embedded_Attachments.pdf | ||
| FA448418R0013.docx | DOCX document | |
| J-2_JB-MDL_B5444_WD_NJ180027_BC_20180706.pdf | ||
| J-3_JB-MDL_B5444_SFS_Appendix_20180706.PDF | ||
| J-1_JB_MDL_B5444_PPQ_20180706.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4484-18-R-0013
Building 5444 Roofing Requirement Questions and Answers 25 July 2018
1. Is the roof made of corrugated metal panel?
- The existing roof has metal roofing panels (stated as corrugated metal panels in SOW). The profile of the roof panels shall match existing or as close as possible.
2. Is that what the roof will be replaced with?
-The existing roof has metal roofing panels (stated as corrugated metal panels in SOW). The profile of the roof panels shall match existing or as close as possible.
3. Does the requirement need same material and gauge throughout?
-Yes, material and gauge will be the same throughout.
4. Does anything need to be done with the walls?
- No, this project is only for the roof replacement only.
5. Are their roof panel specs?
-UFGS 07 41 13 covers metal roof panels, however SOW calls out to match existing roof panels. Matching the panels includes gauge, profile, etc. Please note that it is acceptable if the profile is close but not 100% match.
6. Are there drawings or plans?
-I was unable to locate drawings of the roof. Only a floor plan is available. See B5444 Floor Plan posted on FBO.
7. What are the SRI requirements?
-Follow ASHRAE 189.1
8. Is a drawing of the proposed roof available for estimating?
-No drawings were created because this is a direct replacement.
9. Was the site visit conducted on 19 July 2018 at 830AM mandatory in order to bid the project?
-No it was not mandatory.
10. Will the building be occupied during construction?
-It will likely be occupied.
11. Is the contractor allowed to station work related items in the building parking lot? I.E: contractor parking, material staging and dumpster.
-There is sufficient area at site for staging area, parking, and dumpster. Refer to SOW line 3.13/3.14
12. Is there access to the bathroom in the building for contractors?
-There is a bathroom in the building that contractors should have access to.
13. Could you please let me know if there are any special forms prepared for bidders? If yes, how could we obtain them?
-Contracting – Please refer to the solicitation for any forms