FA4484-17-R-0011_Rev01_20180420.pdf

PDF 611 KB Posted

Attached to
Airfield Concrete Federal contract opportunity
Solicitation number
FA4484-17-R-0011
Issued by
Department of the Air Force Air Mobility Command

About this file

JB-MDL Airfield Concrete Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to Airfield Concrete, newest first.
File Type Posted
Site_Visit_Map_and_Sign_in_sheet.pdf PDF
FA4484-17-R-0011_Amendment_01.pdf PDF
J-4_JB-MDL_WD_NJ1_20180209.pdf.pdf PDF
Site_Visit_Q_and_A.pdf PDF
J-1_JB-MDL_SOWRev8Feb17a.pdf PDF
J-4_JB-MDL_WD_OC_20180209.pdf PDF
J-5_JB-MDL_SFS_Appendix.PDF PDF
J-7_JB-MDL_AntiterrorismStatement.pdf PDF
J-2_JB-MDL_Past_Performance_Cover_Letter_and_Questionnaire.pdf PDF
J-6_JB-MDL_MedicalStatement.pdf PDF
J-3_JB-MDL_Environmental_Compliance_Statment.pdf PDF
J-4_JB-MDL_WD_BC_20180316.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair Airf iled Concrete at Joint Base McGuire Dix Lakehurst (JB MDL), New Jersey (NJ) A) The project consists of Construction and Replacement of Concrete Panels and Airf ield Asphalt.

B) The contract w ill consist of a one-year base period plus four one-year option periods and a 6 month extension of services. This requirement is a single aw ard set aside for Total Small Business.

C) The NAICS code is 237310 and the size standard is $36,500,000.00 D) Enter proposal price in Section B for each line item, and prices/costs must be typed or in black ink.

E) Contractor should reference Section L, Instructions, Conditions, and Notices to Offerors for preperation of proposals. The solicitation w ill be evaluated using price/past performance information as stated in section M.

F) In accordance w ith FAR 36.203, the estmated magnitude of this construction project is more than $10,000,000.00.

JENNIFER E. GREEN 609-754-2812

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

20-Apr-2018

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

X

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________30 May 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

87 CONS/PK

2402 VANDENBERG AVE

JB MCGUIRE-DIX-LAKEHURST NJ 08641

FA4484

PAGE OF PAGES

1 OF

CODE FA4484

(Title, identifying no., date):

12B. CALENDAR DAYS

11:00 AM (hour) Sealed envelopes containing offers

87 CONS/LGC

2402 VANDENBERG AVE

JB MCGUIRE-DIX-LAKEHURST NJ 08641

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

609-754-4948FAX:TEL: TEL: FAX: 609-754-4948

FA448417R0011 91

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

FA448417R0011

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES ESTIMATED

QUANTITY

UNIT UNIT PRICE ESTIMATED AMOUNT

0001 10,000 Cubic Yard

Replace Slabs

FFP

Replace Slabs up to 25'x20'x18" FOB: Destination

ESTIMATED

NET AMT

UNIT UNIT PRICE ESTIMATED AMOUNT

0002 6,000 Square Foot

Replace Spalls in Slab

UNIT UNIT PRICE ESTIMATED AMOUNT

0003 30,000 Linear

Joint Prep and Seal

Joint Prep and Seal existing Slabs

UNIT UNIT PRICE ESTIMATED AMOUNT

0004 20,000 Square

Striping Type I Beads

UNIT UNIT PRICE ESTIMATED AMOUNT

0005 20,000 Square

Striping Type III Beads

UNIT UNIT PRICE ESTIMATED AMOUNT

0006 2,000 Square

Demo concrete/asphalt and restore

UNIT UNIT PRICE ESTIMATED AMOUNT

0007 20,000 Linear

Crack Repairs and Sealing (with routing)

UNIT UNIT PRICE ESTIMATED AMOUNT

0008 10,000 Linear

Crack Repairs and Sealing (without...)

Crack Repairs and Sealing (without routing)

UNIT UNIT PRICE ESTIMATED AMOUNT

0009 80 Each Reinstall Tie Down Anchors / Ground Rods

FFP

Reinstall Tie Down Anchors or Ground Rods

UNIT UNIT PRICE ESTIMATED AMOUNT

0010 40,000 Square

Methacrylate Treatment

UNIT UNIT PRICE ESTIMATED AMOUNT

0011 20 Each Replace/Install Manhole Rings

FFP

Replace/Install Manhole Rings

UNIT UNIT PRICE ESTIMATED AMOUNT

0012 12,000 Square

Provide and Install Asphalt surface 2"

Provide and Install Asphalt surface 2" thick

UNIT UNIT PRICE ESTIMATED AMOUNT

0013 8,000 Square

Provide and Install Asphalt surface 3"

Provide and Install Asphalt surface 3" thick

UNIT UNIT PRICE ESTIMATED AMOUNT

0014 2,000 Square

Fill Pothole/Leveling Course

Fill Pothole/Leveling Course

UNIT UNIT PRICE ESTIMATED AMOUNT

0015 2,000 Square

Replace Base Course Material 4"

UNIT UNIT PRICE ESTIMATED AMOUNT

0016 20,000 Linear

HMA Crack Sealing

UNIT UNIT PRICE ESTIMATED AMOUNT

0017 48,000 Square

Mil and Dispose Asphalt Material ...

Mil and Dispose Asphalt Material partial depth

UNIT UNIT PRICE ESTIMATED AMOUNT

0018 10 Days Surveying 2 Man Crew

FFP

Surveying 2 Man Crew

UNIT UNIT PRICE ESTIMATED AMOUNT

0019 1,160 Lot Professional Engineer Services

FFP

Professional Engineer Services

UNIT UNIT PRICE ESTIMATED AMOUNT

1001 10,000 Cubic

OPTION Replace Slabs

UNIT UNIT PRICE ESTIMATED AMOUNT

1002 6,000 Square

OPTION Replace Spalls in Slab

UNIT UNIT PRICE ESTIMATED AMOUNT

1003 30,000 Linear

OPTION Joint Prep and Seal

UNIT UNIT PRICE ESTIMATED AMOUNT

1004 20,000 Square

OPTION Striping Type I Beads

UNIT UNIT PRICE ESTIMATED AMOUNT

1005 20,000 Square

OPTION Striping Type III Beads

UNIT UNIT PRICE ESTIMATED AMOUNT

1006 2,000 Square

OPTION Demo concrete/asphalt and restore

UNIT UNIT PRICE ESTIMATED AMOUNT

1007 20,000 Linear

OPTION Crack Repairs and Sealing (with routing)

UNIT UNIT PRICE ESTIMATED AMOUNT

1008 10,000 Linear

OPTION Crack Repairs and Sealing (without...)

UNIT UNIT PRICE ESTIMATED AMOUNT

1009 80 Each OPTION Reinstall Tie Down Anchors / Ground Rods

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

1010 40,000 Square

OPTION Methacrylate Treatment

UNIT UNIT PRICE ESTIMATED AMOUNT

1011 20 Each OPTION Replace/Install Manhole Rings

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

1012 12,000 Square

OPTION Provide and Install Asphalt surface 2"

UNIT UNIT PRICE ESTIMATED AMOUNT

1013 8,000 Square

OPTION Provide and Install Asphalt surface 3"

UNIT UNIT PRICE ESTIMATED AMOUNT

1014 2,000 Square

OPTION Fill Pothole/Leveling Course 2"

Fill Pothole/Leveling Course 2"

UNIT UNIT PRICE ESTIMATED AMOUNT

1015 2,000 Square

OPTION Replace Base Course Material 4"

UNIT UNIT PRICE ESTIMATED AMOUNT

1016 20,000 Linear

OPTION HMA Crack Sealing

UNIT UNIT PRICE ESTIMATED AMOUNT

1017 48,000 Square

OPTION Mil and Dispose Asphalt Material ...

UNIT UNIT PRICE ESTIMATED AMOUNT

1018 10 Days OPTION Surveying 2 Man Crew

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

1019 1,160 Lot OPTION Professional Engineer Services

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

2001 10,000 Cubic

UNIT UNIT PRICE ESTIMATED AMOUNT

2002 6,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

2003 30,000 Linear

UNIT UNIT PRICE ESTIMATED AMOUNT

2004 20,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

2005 20,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

2006 2,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

2007 20,000 Linear

UNIT UNIT PRICE ESTIMATED AMOUNT

2008 10,000 Linear

UNIT UNIT PRICE ESTIMATED AMOUNT

2009 80 Each OPTION Reinstall Tie Down Anchors / Ground Rods

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

2010 40,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

2011 20 Each OPTION Replace/Install Manhole Rings

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

2012 12,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

2013 8,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

2014 2,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

2015 2,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

2016 20,000 Linear

UNIT UNIT PRICE ESTIMATED AMOUNT

2017 48,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

2018 10 Days OPTION Surveying 2 Man Crew

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

2019 1,160 Lot OPTION Professional Engineer Services

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

3001 10,000 Cubic

UNIT UNIT PRICE ESTIMATED AMOUNT

3002 6,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

3003 30,000 Linear

UNIT UNIT PRICE ESTIMATED AMOUNT

3004 20,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

3005 20,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

3006 2,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

3007 20,000 Linear

UNIT UNIT PRICE ESTIMATED AMOUNT

3008 10,000 Linear

UNIT UNIT PRICE ESTIMATED AMOUNT

3009 80 Each OPTION Reinstall Tie Down Anchors / Ground Rods

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

3010 40,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

3011 20 Each OPTION Replace/Install Manhole Rings

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

3012 12,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

3013 8,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

3014 2,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

3015 2,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

3016 20,000 Linear

UNIT UNIT PRICE ESTIMATED AMOUNT

3017 48,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

3018 10 Days OPTION Surveying 2 Man Crew

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

3019 1,160 Lot OPTION Professional Engineer Services

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

4001 10,000 Cubic

UNIT UNIT PRICE ESTIMATED AMOUNT

4002 6,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

4003 30,000 Linear

UNIT UNIT PRICE ESTIMATED AMOUNT

4004 20,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

4005 20,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

4006 2,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

4007 20,000 Linear

UNIT UNIT PRICE ESTIMATED AMOUNT

4008 10,000 Linear

UNIT UNIT PRICE ESTIMATED AMOUNT

4009 80 Each OPTION Reinstall Tie Down Anchors / Ground Rods

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

4010 40,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

4011 20 Each OPTION Replace/Install Manhole Rings

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

4012 12,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

4013 8,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

4014 2,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

4015 2,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

4016 20,000 Linear

UNIT UNIT PRICE ESTIMATED AMOUNT

4017 48,000 Square

UNIT UNIT PRICE ESTIMATED AMOUNT

4018 10 Days OPTION Surveying 2 Man Crew

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

4019 1,160 Lot OPTION Professional Engineer Services

FFP

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government 0009 Destination Government Destination Government 0010 Destination Government Destination Government 0011 Destination Government Destination Government 0012 Destination Government Destination Government 0013 Destination Government Destination Government 0014 Destination Government Destination Government 0015 Destination Government Destination Government 0016 Destination Government Destination Government 0017 Destination Government Destination Government 0018 Destination Government Destination Government 0019 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 1004 Destination Government Destination Government 1005 Destination Government Destination Government 1006 Destination Government Destination Government 1007 Destination Government Destination Government 1008 Destination Government Destination Government 1009 Destination Government Destination Government 1010 Destination Government Destination Government 1011 Destination Government Destination Government 1012 Destination Government Destination Government 1013 Destination Government Destination Government 1014 Destination Government Destination Government 1015 Destination Government Destination Government 1016 Destination Government Destination Government 1017 Destination Government Destination Government 1018 Destination Government Destination Government 1019 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government 2004 Destination Government Destination Government 2005 Destination Government Destination Government 2006 Destination Government Destination Government

2007 Destination Government Destination Government 2008 Destination Government Destination Government 2009 Destination Government Destination Government 2010 Destination Government Destination Government 2011 Destination Government Destination Government 2012 Destination Government Destination Government 2013 Destination Government Destination Government 2014 Destination Government Destination Government 2015 Destination Government Destination Government 2016 Destination Government Destination Government 2017 Destination Government Destination Government 2018 Destination Government Destination Government 2019 Destination Government Destination Government 3001 Destination Government Destination Government 3002 Destination Government Destination Government 3003 Destination Government Destination Government 3004 Destination Government Destination Government 3005 Destination Government Destination Government 3006 Destination Government Destination Government 3007 Destination Government Destination Government 3008 Destination Government Destination Government 3009 Destination Government Destination Government 3010 Destination Government Destination Government 3011 Destination Government Destination Government 3012 Destination Government Destination Government 3013 Destination Government Destination Government 3014 Destination Government Destination Government 3015 Destination Government Destination Government 3016 Destination Government Destination Government 3017 Destination Government Destination Government 3018 Destination Government Destination Government 3019 Destination Government Destination Government 4001 Destination Government Destination Government 4002 Destination Government Destination Government 4003 Destination Government Destination Government 4004 Destination Government Destination Government 4005 Destination Government Destination Government 4006 Destination Government Destination Government 4007 Destination Government Destination Government 4008 Destination Government Destination Government 4009 Destination Government Destination Government 4010 Destination Government Destination Government 4011 Destination Government Destination Government 4012 Destination Government Destination Government 4013 Destination Government Destination Government 4014 Destination Government Destination Government 4015 Destination Government Destination Government 4016 Destination Government Destination Government 4017 Destination Government Destination Government 4018 Destination Government Destination Government 4019 Destination Government Destination Government

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 01-NOV-2018 TO

31-OCT-2019

N/A 87 CES/CEC-F3A3Q9

CYNTHIA LEEK

2401 VANDENBERG AVE

MCGUIRE AFB NJ 08641-5502

609-562-3899

F3A3Q9

0002 POP 01-NOV-2018 TO

31-OCT-2019

N/A (SAME AS PREVIOUS LOCATION)

0003 POP 01-NOV-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0004 POP 01-NOV-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0005 POP 01-NOV-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0006 POP 01-NOV-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0007 POP 01-NOV-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0008 POP 01-NOV-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0009 POP 01-NOV-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0010 POP 01-NOV-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0011 POP 01-NOV-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0012 POP 01-NOV-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0013 POP 01-NOV-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0014 POP 01-NOV-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0015 POP 01-NOV-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0016 POP 01-NOV-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0017 POP 01-NOV-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0018 POP 01-NOV-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0019 POP 01-NOV-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1001 POP 01-NOV-2019 TO

31-OCT-2020

N/A (SAME AS PREVIOUS LOCATION)

1002 POP 01-NOV-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1003 POP 01-NOV-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1004 POP 01-NOV-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1005 POP 01-NOV-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1006 POP 01-NOV-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1007 POP 01-NOV-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1008 POP 01-NOV-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1009 POP 01-NOV-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1010 POP 01-NOV-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1011 POP 01-NOV-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1012 POP 01-NOV-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1013 POP 01-NOV-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1014 POP 01-NOV-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1015 POP 01-NOV-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1016 POP 01-NOV-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1017 POP 01-NOV-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1018 POP 01-NOV-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1019 POP 01-NOV-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2001 POP 01-NOV-2020 TO

31-OCT-2021

N/A (SAME AS PREVIOUS LOCATION)

2002 POP 01-NOV-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2003 POP 01-NOV-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2004 POP 01-NOV-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2005 POP 01-NOV-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2006 POP 01-NOV-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2007 POP 01-NOV-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2008 POP 01-NOV-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2009 POP 01-NOV-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2010 POP 01-NOV-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2011 POP 01-NOV-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2012 POP 01-NOV-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2013 POP 01-NOV-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2014 POP 01-NOV-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2015 POP 01-NOV-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2016 POP 01-NOV-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2017 POP 01-NOV-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2018 POP 01-NOV-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2019 POP 01-NOV-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

3001 POP 01-NOV-2021 TO

31-OCT-2022

N/A (SAME AS PREVIOUS LOCATION)

3002 POP 01-NOV-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

3003 POP 01-NOV-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

3004 POP 01-NOV-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

3005 POP 01-NOV-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

3006 POP 01-NOV-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

3007 POP 01-NOV-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

3008 POP 01-NOV-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

3009 POP 01-NOV-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

3010 POP 01-NOV-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

3011 POP 01-NOV-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

3012 POP 01-NOV-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

3013 POP 01-NOV-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

3014 POP 01-NOV-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

3015 POP 01-NOV-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

3016 POP 01-NOV-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

3017 POP 01-NOV-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

3018 POP 01-NOV-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

3019 POP 01-NOV-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

4001 POP 01-NOV-2022 TO

31-OCT-2023

N/A (SAME AS PREVIOUS LOCATION)

4002 POP 01-NOV-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

4003 POP 01-NOV-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

4004 POP 01-NOV-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

4005 POP 01-NOV-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

4006 POP 01-NOV-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

4007 POP 01-NOV-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

4008 POP 01-NOV-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

4009 POP 01-NOV-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

4010 POP 01-NOV-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

4011 POP 01-NOV-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

4012 POP 01-NOV-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

4013 POP 01-NOV-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

4014 POP 01-NOV-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

4015 POP 01-NOV-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

4016 POP 01-NOV-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

4017 POP 01-NOV-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

4018 POP 01-NOV-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

4019 POP 01-NOV-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

Section G - Contract Administration Data

CLAUSES INCORPORATED BY FULL TEXT

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(a) Definitions. As used in this clause--

Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

COMBO

(Contracting Officer: Insert applicable document type(s). Note: If a “Combo” document type is identified but not supportable by the Contractor's business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

F3A3Q5 or F3A3Q9

(Contracting Officer: Insert inspection and acceptance locations or “Not applicable”.)

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC F87700 or N64142 Issue By DoDAAC FA4484 Admin DoDAAC FA4484 Inspect By DoDAAC ____ Ship To Code F3A3Q5 or F3A3Q9 Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) ____ Service Acceptor (DoDAAC) F3A3Q5 or F3A3Q9 Accept at Other DoDAAC F3A3Q5 or F3A3Q9 LPO DoDAAC F3A3A9 DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____

(*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

(Contracting Officer: Insert applicable email addresses or “Not applicable.”)

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

Not Applicable

(Contracting Officer: Insert applicable information or “Not applicable.”)

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

(End of clause)

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-7 Anti-Kickback Procedures MAY 2014 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity

MAY 2014

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

OCT 2010

52.203-13 Contractor Code of Business Ethics and Conduct OCT 2015 52.203-17 Contractor Employee Whistleblower Rights and Requirement

To Inform Employees of Whistleblower Rights

APR 2014

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper

MAY 2011

52.204-7 System for Award Management OCT 2016 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

OCT 2016

52.204-13 System for Award Management Maintenance OCT 2016 52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for Debarment

OCT 2015

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters

JUL 2013

52.210-1 Market Research APR 2011 52.211-13 Time Extensions SEP 2000 52.215-2 Audit and Records--Negotiation OCT 2010 52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.219-8 Utilization of Small Business Concerns NOV 2016 52.219-14 Limitations On Subcontracting JAN 2017 52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013 52.222-1 Notice To The Government Of Labor Disputes FEB 1997 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards- Overtime

Compensation

MAY 2014

52.222-6 Construction Wage Rate Requirements MAY 2014 52.222-8 Payrolls and Basic Records MAY 2014 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-23 Notice of Requirement for Affirmative Action to Ensure

Equal Employment Opportunity for Construction

FEB 1999

52.222-26 Equal Opportunity SEP 2016

52.222-27 Affirmative Action Compliance Requirements for Construction

APR 2015

52.222-35 Equal Opportunity for Veterans OCT 2015 52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014 52.222-37 Employment Reports on Veterans FEB 2016 52.222-40 Notification of Employee Rights Under the National Labor

Relations Act

DEC 2010

52.222-50 Combating Trafficking in Persons MAR 2015 52.222-54 Employment Eligibility Verification OCT 2015 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts

SEP 2013

52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

MAY 2008

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving

AUG 2011

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.227-1 Authorization and Consent DEC 2007 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014 52.228-14 Irrevocable Letter of Credit NOV 2014 52.228-15 Performance and Payment Bonds--Construction OCT 2010 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-17 Interest MAY 2014 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

JUL 2013

52.232-37 Multiple Payment Arrangements MAY 1999 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.236-17 Layout of Work APR 1984 52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-26 Preconstruction Conference FEB 1995 52.242-13 Bankruptcy JUL 1995

52.242-14 Suspension of Work APR 1984 52.243-4 Changes JUN 2007 52.246-12 Inspection of Construction AUG 1996 52.246-21 Warranty of Construction MAR 1994 52.248-3 Value Engineering-Construction OCT 2015 52.249-2 Termination For Convenience Of The Government (Fixed-

Price)

APR 2012

52.249-2 Alt I Termination for Convenience of the Government (Fixed- Price) (Apr 2012) - Alternate I

SEP 1996

52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-

Contract-Related Felonies

DEC 2008

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7003 Agency Office of the Inspector General DEC 2012 252.203-7004 Display of Hotline Posters OCT 2016 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7006 Billing Instructions OCT 2005 252.204-7007 Alternate A, Annual Representations and Certifications JAN 2015 252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting

OCT 2016

252.223-7004 Drug Free Work Force SEP 1988 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or

Hazardous Materials

SEP 2014

252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.236-7001 Contract Drawings, and Specifications AUG 2000 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.246-7000 Material Inspection And Receiving Report MAR 2008 252.247-7023 Transportation of Supplies by Sea APR 2014

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than as specified in each task order. The time stated for completion shall include final cleanup of the premises.

*The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 1 November 2018. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $397.00 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

52.216-18 ORDERING. (OCT 1995)

(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from 1 November 2018 through 30 April 2024.

(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.

(c) If mailed, a delivery order or task order is considered "issued" when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.

52.216-19 ORDER LIMITATIONS. (OCT 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $1,000.00 (insert dollar figure or quantity), the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor:

(1) Any order for a single item in excess of $500,000.00 (insert dollar figure or quantity);

(2) Any order for a combination of items in excess of $1,000,000.00 (insert dollar figure or quantity); or

(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.

(d) Notwithstanding paragraphs (b) and (c) above, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within ten days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

52.216-21 REQUIREMENTS (OCT 1995)

(a) This is a requirements contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies or services specified in the Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Government's requirements do not result in orders in the quantities described as "estimated'' or "maximum" in the Schedule, that fact shall not constitute the basis for an equitable price adjustment.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. Subject to any limitations in the Order Limitations clause or elsewhere in this contract, the Contractor shall furnish to the Government all supplies or services specified in the Schedule and called for by orders issued in accordance with the Ordering clause. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(c) Except as this contract otherwise provides, the Government shall order from the Contractor all the supplies or services specified in the Schedule that are required to be purchased by the Government activity or activities specified in the Schedule.

(d) The Government is not required to purchase from the Contractor requirements in excess of any limit on total orders under this contract.

(e) If the Government urgently requires delivery of any quantity of an item before the earliest date that delivery may be specified under this contract, and if the Contractor will not accept an order providing for the accelerated delivery, the Government may acquire the urgently required goods or services from another source.

(f) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after the expiration of the Period of Performance of the final Task Order.

52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days of contract expiration (insert the period of time within which the Contracting Officer may exercise the option).

52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days prior to contract expiration (insert the period of time within which the Contracting Officer may exercise the option);

provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days prior to contract expiration days (60 days unless a different number of days is inserted) before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years and 6 months .

52.225-11 BUY AMERICAN--CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (OCT

2016)

(a) Definitions. As used in this clause--

Caribbean Basin country construction material means a construction material that--

(1) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is--

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4)such as agricultural products and petroleum products.

Component means an article, material, or supply incorporated directly into a construction material.

Construction material means an article, material, or supply brought to the construction site by the Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.

Materials purchased directly by the Government are supplies, not construction material.

Cost of components means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Designated country means any of the following countries:

(1) A World Trade Organization Government Procurement Agreement (WTO GPA) country (Armenia, Aruba, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Moldova, Montenegro, Netherlands, New Zealand, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan, Ukraine, or United Kingdom);

(2) A Free Trade Agreement (FTA) country (Australia, Bahrain, Canada, Chile, Colombia, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Korea (Republic of), Mexico, Morocco, Nicaragua, Oman, Panama, Peru, or Singapore);

(3) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, South Sudan, Tanzania, Timor-Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia); or

(4) A Caribbean Basin country (Antigua and Barbuda, Aruba, Bahamas, Barbados, Belize, Bonaire, British Virgin Islands, Curacao, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saba, St. Kitts and Nevis, St. Lucia, St.

Vincent and the Grenadines, Sint Eustatius, Sint Maarten, or Trinidad and Tobago).

Designated country construction material means a construction material that is a WTO GPA country construction material, an FTA country construction material, a least developed country construction material, or a Caribbean Basin country construction material.

Domestic construction material means--

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if--

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

Foreign construction material means a construction material other than a domestic construction material.

Least developed country construction material means a construction material that--

(1) Is wholly the growth, product, or manufacture of a least developed country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.

“Free Trade Agreement country construction material” means a construction material that—

(1) Is wholly the growth, product, or manufacture of a Free Trade Agreement (FTA) country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a FTA country into a new and different construction material distinct from the materials from which it was transformed.

“Least developed country construction material” means a construction material that—

(1) Is wholly the growth, product, or manufacture of a least developed country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.

United States means the 50 States, the District of Columbia, and outlying areas.

WTO GPA country construction material means a construction material that--

(1) Is wholly the growth, product, or manufacture of a WTO GPA country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a WTO GPA country into a new and different construction material distinct from the materials from which it was transformed.

(b) Construction materials.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). In addition, the Contracting Officer has determined that the WTO GPA and Free Trade Agreements (FTAs) apply to this acquisition. Therefore, the Buy American restrictions are waived for designated country construction materials.

(2) The Contractor shall use only domestic or designated country construction material in performing this contract, except as provided in paragraphs (b)(3) and (b)(4) of this clause.

(3) The requirement in paragraph (b)(2) of this clause does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

[Contracting Officer to list applicable excepted materials or indicate ``none'']

(4) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(3) of this clause if the Government determines that--

(i) The cost of domestic construction…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.