FA4484-17-R-0011_Rev01_20180420.pdf
PDF 611 KB Posted
- Attached to
- Airfield Concrete Federal contract opportunity
- Solicitation number
- FA4484-17-R-0011
About this file
JB-MDL Airfield Concrete Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site_Visit_Map_and_Sign_in_sheet.pdf | ||
| FA4484-17-R-0011_Amendment_01.pdf | ||
| J-4_JB-MDL_WD_NJ1_20180209.pdf.pdf | ||
| Site_Visit_Q_and_A.pdf | ||
| J-1_JB-MDL_SOWRev8Feb17a.pdf | ||
| J-4_JB-MDL_WD_OC_20180209.pdf | ||
| J-5_JB-MDL_SFS_Appendix.PDF | ||
| J-7_JB-MDL_AntiterrorismStatement.pdf | ||
| J-2_JB-MDL_Past_Performance_Cover_Letter_and_Questionnaire.pdf | ||
| J-6_JB-MDL_MedicalStatement.pdf | ||
| J-3_JB-MDL_Environmental_Compliance_Statment.pdf | ||
| J-4_JB-MDL_WD_BC_20180316.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Repair Airf iled Concrete at Joint Base McGuire Dix Lakehurst (JB MDL), New Jersey (NJ) A) The project consists of Construction and Replacement of Concrete Panels and Airf ield Asphalt.
B) The contract w ill consist of a one-year base period plus four one-year option periods and a 6 month extension of services. This requirement is a single aw ard set aside for Total Small Business.
C) The NAICS code is 237310 and the size standard is $36,500,000.00 D) Enter proposal price in Section B for each line item, and prices/costs must be typed or in black ink.
E) Contractor should reference Section L, Instructions, Conditions, and Notices to Offerors for preperation of proposals. The solicitation w ill be evaluated using price/past performance information as stated in section M.
F) In accordance w ith FAR 36.203, the estmated magnitude of this construction project is more than $10,000,000.00.
JENNIFER E. GREEN 609-754-2812
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
20-Apr-2018
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________30 May 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
87 CONS/PK
2402 VANDENBERG AVE
JB MCGUIRE-DIX-LAKEHURST NJ 08641
FA4484
PAGE OF PAGES
1 OF
CODE FA4484
(Title, identifying no., date):
12B. CALENDAR DAYS
11:00 AM (hour) Sealed envelopes containing offers
87 CONS/LGC
2402 VANDENBERG AVE
JB MCGUIRE-DIX-LAKEHURST NJ 08641
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
609-754-4948FAX:TEL: TEL: FAX: 609-754-4948
FA448417R0011 91
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
FA448417R0011
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0001 10,000 Cubic Yard
Replace Slabs
FFP
Replace Slabs up to 25'x20'x18" FOB: Destination
ESTIMATED
NET AMT
UNIT UNIT PRICE ESTIMATED AMOUNT
0002 6,000 Square Foot
Replace Spalls in Slab
UNIT UNIT PRICE ESTIMATED AMOUNT
0003 30,000 Linear
Joint Prep and Seal
Joint Prep and Seal existing Slabs
UNIT UNIT PRICE ESTIMATED AMOUNT
0004 20,000 Square
Striping Type I Beads
UNIT UNIT PRICE ESTIMATED AMOUNT
0005 20,000 Square
Striping Type III Beads
UNIT UNIT PRICE ESTIMATED AMOUNT
0006 2,000 Square
Demo concrete/asphalt and restore
UNIT UNIT PRICE ESTIMATED AMOUNT
0007 20,000 Linear
Crack Repairs and Sealing (with routing)
UNIT UNIT PRICE ESTIMATED AMOUNT
0008 10,000 Linear
Crack Repairs and Sealing (without...)
Crack Repairs and Sealing (without routing)
UNIT UNIT PRICE ESTIMATED AMOUNT
0009 80 Each Reinstall Tie Down Anchors / Ground Rods
FFP
Reinstall Tie Down Anchors or Ground Rods
UNIT UNIT PRICE ESTIMATED AMOUNT
0010 40,000 Square
Methacrylate Treatment
UNIT UNIT PRICE ESTIMATED AMOUNT
0011 20 Each Replace/Install Manhole Rings
FFP
Replace/Install Manhole Rings
UNIT UNIT PRICE ESTIMATED AMOUNT
0012 12,000 Square
Provide and Install Asphalt surface 2"
Provide and Install Asphalt surface 2" thick
UNIT UNIT PRICE ESTIMATED AMOUNT
0013 8,000 Square
Provide and Install Asphalt surface 3"
Provide and Install Asphalt surface 3" thick
UNIT UNIT PRICE ESTIMATED AMOUNT
0014 2,000 Square
Fill Pothole/Leveling Course
Fill Pothole/Leveling Course
UNIT UNIT PRICE ESTIMATED AMOUNT
0015 2,000 Square
Replace Base Course Material 4"
UNIT UNIT PRICE ESTIMATED AMOUNT
0016 20,000 Linear
HMA Crack Sealing
UNIT UNIT PRICE ESTIMATED AMOUNT
0017 48,000 Square
Mil and Dispose Asphalt Material ...
Mil and Dispose Asphalt Material partial depth
UNIT UNIT PRICE ESTIMATED AMOUNT
0018 10 Days Surveying 2 Man Crew
FFP
Surveying 2 Man Crew
UNIT UNIT PRICE ESTIMATED AMOUNT
0019 1,160 Lot Professional Engineer Services
FFP
Professional Engineer Services
UNIT UNIT PRICE ESTIMATED AMOUNT
1001 10,000 Cubic
OPTION Replace Slabs
UNIT UNIT PRICE ESTIMATED AMOUNT
1002 6,000 Square
OPTION Replace Spalls in Slab
UNIT UNIT PRICE ESTIMATED AMOUNT
1003 30,000 Linear
OPTION Joint Prep and Seal
UNIT UNIT PRICE ESTIMATED AMOUNT
1004 20,000 Square
OPTION Striping Type I Beads
UNIT UNIT PRICE ESTIMATED AMOUNT
1005 20,000 Square
OPTION Striping Type III Beads
UNIT UNIT PRICE ESTIMATED AMOUNT
1006 2,000 Square
OPTION Demo concrete/asphalt and restore
UNIT UNIT PRICE ESTIMATED AMOUNT
1007 20,000 Linear
OPTION Crack Repairs and Sealing (with routing)
UNIT UNIT PRICE ESTIMATED AMOUNT
1008 10,000 Linear
OPTION Crack Repairs and Sealing (without...)
UNIT UNIT PRICE ESTIMATED AMOUNT
1009 80 Each OPTION Reinstall Tie Down Anchors / Ground Rods
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1010 40,000 Square
OPTION Methacrylate Treatment
UNIT UNIT PRICE ESTIMATED AMOUNT
1011 20 Each OPTION Replace/Install Manhole Rings
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1012 12,000 Square
OPTION Provide and Install Asphalt surface 2"
UNIT UNIT PRICE ESTIMATED AMOUNT
1013 8,000 Square
OPTION Provide and Install Asphalt surface 3"
UNIT UNIT PRICE ESTIMATED AMOUNT
1014 2,000 Square
OPTION Fill Pothole/Leveling Course 2"
Fill Pothole/Leveling Course 2"
UNIT UNIT PRICE ESTIMATED AMOUNT
1015 2,000 Square
OPTION Replace Base Course Material 4"
UNIT UNIT PRICE ESTIMATED AMOUNT
1016 20,000 Linear
OPTION HMA Crack Sealing
UNIT UNIT PRICE ESTIMATED AMOUNT
1017 48,000 Square
OPTION Mil and Dispose Asphalt Material ...
UNIT UNIT PRICE ESTIMATED AMOUNT
1018 10 Days OPTION Surveying 2 Man Crew
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1019 1,160 Lot OPTION Professional Engineer Services
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2001 10,000 Cubic
UNIT UNIT PRICE ESTIMATED AMOUNT
2002 6,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
2003 30,000 Linear
UNIT UNIT PRICE ESTIMATED AMOUNT
2004 20,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
2005 20,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
2006 2,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
2007 20,000 Linear
UNIT UNIT PRICE ESTIMATED AMOUNT
2008 10,000 Linear
UNIT UNIT PRICE ESTIMATED AMOUNT
2009 80 Each OPTION Reinstall Tie Down Anchors / Ground Rods
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2010 40,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
2011 20 Each OPTION Replace/Install Manhole Rings
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2012 12,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
2013 8,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
2014 2,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
2015 2,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
2016 20,000 Linear
UNIT UNIT PRICE ESTIMATED AMOUNT
2017 48,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
2018 10 Days OPTION Surveying 2 Man Crew
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2019 1,160 Lot OPTION Professional Engineer Services
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3001 10,000 Cubic
UNIT UNIT PRICE ESTIMATED AMOUNT
3002 6,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
3003 30,000 Linear
UNIT UNIT PRICE ESTIMATED AMOUNT
3004 20,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
3005 20,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
3006 2,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
3007 20,000 Linear
UNIT UNIT PRICE ESTIMATED AMOUNT
3008 10,000 Linear
UNIT UNIT PRICE ESTIMATED AMOUNT
3009 80 Each OPTION Reinstall Tie Down Anchors / Ground Rods
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3010 40,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
3011 20 Each OPTION Replace/Install Manhole Rings
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3012 12,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
3013 8,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
3014 2,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
3015 2,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
3016 20,000 Linear
UNIT UNIT PRICE ESTIMATED AMOUNT
3017 48,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
3018 10 Days OPTION Surveying 2 Man Crew
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3019 1,160 Lot OPTION Professional Engineer Services
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
4001 10,000 Cubic
UNIT UNIT PRICE ESTIMATED AMOUNT
4002 6,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
4003 30,000 Linear
UNIT UNIT PRICE ESTIMATED AMOUNT
4004 20,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
4005 20,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
4006 2,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
4007 20,000 Linear
UNIT UNIT PRICE ESTIMATED AMOUNT
4008 10,000 Linear
UNIT UNIT PRICE ESTIMATED AMOUNT
4009 80 Each OPTION Reinstall Tie Down Anchors / Ground Rods
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
4010 40,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
4011 20 Each OPTION Replace/Install Manhole Rings
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
4012 12,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
4013 8,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
4014 2,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
4015 2,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
4016 20,000 Linear
UNIT UNIT PRICE ESTIMATED AMOUNT
4017 48,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
4018 10 Days OPTION Surveying 2 Man Crew
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
4019 1,160 Lot OPTION Professional Engineer Services
FFP
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government 0009 Destination Government Destination Government 0010 Destination Government Destination Government 0011 Destination Government Destination Government 0012 Destination Government Destination Government 0013 Destination Government Destination Government 0014 Destination Government Destination Government 0015 Destination Government Destination Government 0016 Destination Government Destination Government 0017 Destination Government Destination Government 0018 Destination Government Destination Government 0019 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 1004 Destination Government Destination Government 1005 Destination Government Destination Government 1006 Destination Government Destination Government 1007 Destination Government Destination Government 1008 Destination Government Destination Government 1009 Destination Government Destination Government 1010 Destination Government Destination Government 1011 Destination Government Destination Government 1012 Destination Government Destination Government 1013 Destination Government Destination Government 1014 Destination Government Destination Government 1015 Destination Government Destination Government 1016 Destination Government Destination Government 1017 Destination Government Destination Government 1018 Destination Government Destination Government 1019 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government 2004 Destination Government Destination Government 2005 Destination Government Destination Government 2006 Destination Government Destination Government
2007 Destination Government Destination Government 2008 Destination Government Destination Government 2009 Destination Government Destination Government 2010 Destination Government Destination Government 2011 Destination Government Destination Government 2012 Destination Government Destination Government 2013 Destination Government Destination Government 2014 Destination Government Destination Government 2015 Destination Government Destination Government 2016 Destination Government Destination Government 2017 Destination Government Destination Government 2018 Destination Government Destination Government 2019 Destination Government Destination Government 3001 Destination Government Destination Government 3002 Destination Government Destination Government 3003 Destination Government Destination Government 3004 Destination Government Destination Government 3005 Destination Government Destination Government 3006 Destination Government Destination Government 3007 Destination Government Destination Government 3008 Destination Government Destination Government 3009 Destination Government Destination Government 3010 Destination Government Destination Government 3011 Destination Government Destination Government 3012 Destination Government Destination Government 3013 Destination Government Destination Government 3014 Destination Government Destination Government 3015 Destination Government Destination Government 3016 Destination Government Destination Government 3017 Destination Government Destination Government 3018 Destination Government Destination Government 3019 Destination Government Destination Government 4001 Destination Government Destination Government 4002 Destination Government Destination Government 4003 Destination Government Destination Government 4004 Destination Government Destination Government 4005 Destination Government Destination Government 4006 Destination Government Destination Government 4007 Destination Government Destination Government 4008 Destination Government Destination Government 4009 Destination Government Destination Government 4010 Destination Government Destination Government 4011 Destination Government Destination Government 4012 Destination Government Destination Government 4013 Destination Government Destination Government 4014 Destination Government Destination Government 4015 Destination Government Destination Government 4016 Destination Government Destination Government 4017 Destination Government Destination Government 4018 Destination Government Destination Government 4019 Destination Government Destination Government
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 01-NOV-2018 TO
31-OCT-2019
N/A 87 CES/CEC-F3A3Q9
CYNTHIA LEEK
2401 VANDENBERG AVE
MCGUIRE AFB NJ 08641-5502
609-562-3899
F3A3Q9
0002 POP 01-NOV-2018 TO
31-OCT-2019
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 01-NOV-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0004 POP 01-NOV-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0005 POP 01-NOV-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0006 POP 01-NOV-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0007 POP 01-NOV-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0008 POP 01-NOV-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0009 POP 01-NOV-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0010 POP 01-NOV-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0011 POP 01-NOV-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0012 POP 01-NOV-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0013 POP 01-NOV-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0014 POP 01-NOV-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0015 POP 01-NOV-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0016 POP 01-NOV-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0017 POP 01-NOV-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0018 POP 01-NOV-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0019 POP 01-NOV-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1001 POP 01-NOV-2019 TO
31-OCT-2020
N/A (SAME AS PREVIOUS LOCATION)
1002 POP 01-NOV-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1003 POP 01-NOV-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1004 POP 01-NOV-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1005 POP 01-NOV-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1006 POP 01-NOV-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1007 POP 01-NOV-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1008 POP 01-NOV-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1009 POP 01-NOV-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1010 POP 01-NOV-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1011 POP 01-NOV-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1012 POP 01-NOV-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1013 POP 01-NOV-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1014 POP 01-NOV-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1015 POP 01-NOV-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1016 POP 01-NOV-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1017 POP 01-NOV-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1018 POP 01-NOV-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1019 POP 01-NOV-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 01-NOV-2020 TO
31-OCT-2021
N/A (SAME AS PREVIOUS LOCATION)
2002 POP 01-NOV-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2003 POP 01-NOV-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2004 POP 01-NOV-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2005 POP 01-NOV-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2006 POP 01-NOV-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2007 POP 01-NOV-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2008 POP 01-NOV-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2009 POP 01-NOV-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2010 POP 01-NOV-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2011 POP 01-NOV-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2012 POP 01-NOV-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2013 POP 01-NOV-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2014 POP 01-NOV-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2015 POP 01-NOV-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2016 POP 01-NOV-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2017 POP 01-NOV-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2018 POP 01-NOV-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2019 POP 01-NOV-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
3001 POP 01-NOV-2021 TO
31-OCT-2022
N/A (SAME AS PREVIOUS LOCATION)
3002 POP 01-NOV-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3003 POP 01-NOV-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3004 POP 01-NOV-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3005 POP 01-NOV-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3006 POP 01-NOV-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3007 POP 01-NOV-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3008 POP 01-NOV-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3009 POP 01-NOV-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3010 POP 01-NOV-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3011 POP 01-NOV-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3012 POP 01-NOV-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3013 POP 01-NOV-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3014 POP 01-NOV-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3015 POP 01-NOV-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3016 POP 01-NOV-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3017 POP 01-NOV-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3018 POP 01-NOV-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3019 POP 01-NOV-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
4001 POP 01-NOV-2022 TO
31-OCT-2023
N/A (SAME AS PREVIOUS LOCATION)
4002 POP 01-NOV-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4003 POP 01-NOV-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4004 POP 01-NOV-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4005 POP 01-NOV-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4006 POP 01-NOV-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4007 POP 01-NOV-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4008 POP 01-NOV-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4009 POP 01-NOV-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4010 POP 01-NOV-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4011 POP 01-NOV-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4012 POP 01-NOV-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4013 POP 01-NOV-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4014 POP 01-NOV-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4015 POP 01-NOV-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4016 POP 01-NOV-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4017 POP 01-NOV-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4018 POP 01-NOV-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4019 POP 01-NOV-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
Section G - Contract Administration Data
CLAUSES INCORPORATED BY FULL TEXT
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause--
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
COMBO
(Contracting Officer: Insert applicable document type(s). Note: If a “Combo” document type is identified but not supportable by the Contractor's business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
F3A3Q5 or F3A3Q9
(Contracting Officer: Insert inspection and acceptance locations or “Not applicable”.)
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC F87700 or N64142 Issue By DoDAAC FA4484 Admin DoDAAC FA4484 Inspect By DoDAAC ____ Ship To Code F3A3Q5 or F3A3Q9 Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) ____ Service Acceptor (DoDAAC) F3A3Q5 or F3A3Q9 Accept at Other DoDAAC F3A3Q5 or F3A3Q9 LPO DoDAAC F3A3A9 DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____
(*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
(Contracting Officer: Insert applicable email addresses or “Not applicable.”)
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
Not Applicable
(Contracting Officer: Insert applicable information or “Not applicable.”)
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
(End of clause)
Section I - Contract Clauses
CLAUSES INCORPORATED BY REFERENCE
52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-7 Anti-Kickback Procedures MAY 2014 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
OCT 2010
52.203-13 Contractor Code of Business Ethics and Conduct OCT 2015 52.203-17 Contractor Employee Whistleblower Rights and Requirement
To Inform Employees of Whistleblower Rights
APR 2014
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper
MAY 2011
52.204-7 System for Award Management OCT 2016 52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
OCT 2016
52.204-13 System for Award Management Maintenance OCT 2016 52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for Debarment
OCT 2015
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters
JUL 2013
52.210-1 Market Research APR 2011 52.211-13 Time Extensions SEP 2000 52.215-2 Audit and Records--Negotiation OCT 2010 52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.219-8 Utilization of Small Business Concerns NOV 2016 52.219-14 Limitations On Subcontracting JAN 2017 52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013 52.222-1 Notice To The Government Of Labor Disputes FEB 1997 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards- Overtime
Compensation
MAY 2014
52.222-6 Construction Wage Rate Requirements MAY 2014 52.222-8 Payrolls and Basic Records MAY 2014 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and
Related Regulations
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-23 Notice of Requirement for Affirmative Action to Ensure
Equal Employment Opportunity for Construction
FEB 1999
52.222-26 Equal Opportunity SEP 2016
52.222-27 Affirmative Action Compliance Requirements for Construction
APR 2015
52.222-35 Equal Opportunity for Veterans OCT 2015 52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014 52.222-37 Employment Reports on Veterans FEB 2016 52.222-40 Notification of Employee Rights Under the National Labor
Relations Act
DEC 2010
52.222-50 Combating Trafficking in Persons MAR 2015 52.222-54 Employment Eligibility Verification OCT 2015 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
SEP 2013
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
MAY 2008
52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving
AUG 2011
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.227-1 Authorization and Consent DEC 2007 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014 52.228-14 Irrevocable Letter of Credit NOV 2014 52.228-15 Performance and Payment Bonds--Construction OCT 2010 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-17 Interest MAY 2014 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
JUL 2013
52.232-37 Multiple Payment Arrangements MAY 1999 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.236-17 Layout of Work APR 1984 52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-26 Preconstruction Conference FEB 1995 52.242-13 Bankruptcy JUL 1995
52.242-14 Suspension of Work APR 1984 52.243-4 Changes JUN 2007 52.246-12 Inspection of Construction AUG 1996 52.246-21 Warranty of Construction MAR 1994 52.248-3 Value Engineering-Construction OCT 2015 52.249-2 Termination For Convenience Of The Government (Fixed-
Price)
APR 2012
52.249-2 Alt I Termination for Convenience of the Government (Fixed- Price) (Apr 2012) - Alternate I
SEP 1996
52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-
Contract-Related Felonies
DEC 2008
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7003 Agency Office of the Inspector General DEC 2012 252.203-7004 Display of Hotline Posters OCT 2016 252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7006 Billing Instructions OCT 2005 252.204-7007 Alternate A, Annual Representations and Certifications JAN 2015 252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting
OCT 2016
252.223-7004 Drug Free Work Force SEP 1988 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or
Hazardous Materials
SEP 2014
252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.236-7001 Contract Drawings, and Specifications AUG 2000 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.246-7000 Material Inspection And Receiving Report MAR 2008 252.247-7023 Transportation of Supplies by Sea APR 2014
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than as specified in each task order. The time stated for completion shall include final cleanup of the premises.
*The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.
The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 1 November 2018. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $397.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
52.216-18 ORDERING. (OCT 1995)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from 1 November 2018 through 30 April 2024.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) If mailed, a delivery order or task order is considered "issued" when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.
52.216-19 ORDER LIMITATIONS. (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $1,000.00 (insert dollar figure or quantity), the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor:
(1) Any order for a single item in excess of $500,000.00 (insert dollar figure or quantity);
(2) Any order for a combination of items in excess of $1,000,000.00 (insert dollar figure or quantity); or
(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.
(d) Notwithstanding paragraphs (b) and (c) above, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within ten days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
52.216-21 REQUIREMENTS (OCT 1995)
(a) This is a requirements contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies or services specified in the Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Government's requirements do not result in orders in the quantities described as "estimated'' or "maximum" in the Schedule, that fact shall not constitute the basis for an equitable price adjustment.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. Subject to any limitations in the Order Limitations clause or elsewhere in this contract, the Contractor shall furnish to the Government all supplies or services specified in the Schedule and called for by orders issued in accordance with the Ordering clause. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(c) Except as this contract otherwise provides, the Government shall order from the Contractor all the supplies or services specified in the Schedule that are required to be purchased by the Government activity or activities specified in the Schedule.
(d) The Government is not required to purchase from the Contractor requirements in excess of any limit on total orders under this contract.
(e) If the Government urgently requires delivery of any quantity of an item before the earliest date that delivery may be specified under this contract, and if the Contractor will not accept an order providing for the accelerated delivery, the Government may acquire the urgently required goods or services from another source.
(f) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after the expiration of the Period of Performance of the final Task Order.
52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days of contract expiration (insert the period of time within which the Contracting Officer may exercise the option).
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days prior to contract expiration (insert the period of time within which the Contracting Officer may exercise the option);
provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days prior to contract expiration days (60 days unless a different number of days is inserted) before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years and 6 months .
52.225-11 BUY AMERICAN--CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (OCT
2016)
(a) Definitions. As used in this clause--
Caribbean Basin country construction material means a construction material that--
(1) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is--
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4)such as agricultural products and petroleum products.
Component means an article, material, or supply incorporated directly into a construction material.
Construction material means an article, material, or supply brought to the construction site by the Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.
Materials purchased directly by the Government are supplies, not construction material.
Cost of components means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Designated country means any of the following countries:
(1) A World Trade Organization Government Procurement Agreement (WTO GPA) country (Armenia, Aruba, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Moldova, Montenegro, Netherlands, New Zealand, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan, Ukraine, or United Kingdom);
(2) A Free Trade Agreement (FTA) country (Australia, Bahrain, Canada, Chile, Colombia, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Korea (Republic of), Mexico, Morocco, Nicaragua, Oman, Panama, Peru, or Singapore);
(3) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, South Sudan, Tanzania, Timor-Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia); or
(4) A Caribbean Basin country (Antigua and Barbuda, Aruba, Bahamas, Barbados, Belize, Bonaire, British Virgin Islands, Curacao, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saba, St. Kitts and Nevis, St. Lucia, St.
Vincent and the Grenadines, Sint Eustatius, Sint Maarten, or Trinidad and Tobago).
Designated country construction material means a construction material that is a WTO GPA country construction material, an FTA country construction material, a least developed country construction material, or a Caribbean Basin country construction material.
Domestic construction material means--
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if--
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
Foreign construction material means a construction material other than a domestic construction material.
Least developed country construction material means a construction material that--
(1) Is wholly the growth, product, or manufacture of a least developed country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.
“Free Trade Agreement country construction material” means a construction material that—
(1) Is wholly the growth, product, or manufacture of a Free Trade Agreement (FTA) country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a FTA country into a new and different construction material distinct from the materials from which it was transformed.
“Least developed country construction material” means a construction material that—
(1) Is wholly the growth, product, or manufacture of a least developed country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.
United States means the 50 States, the District of Columbia, and outlying areas.
WTO GPA country construction material means a construction material that--
(1) Is wholly the growth, product, or manufacture of a WTO GPA country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a WTO GPA country into a new and different construction material distinct from the materials from which it was transformed.
(b) Construction materials.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). In addition, the Contracting Officer has determined that the WTO GPA and Free Trade Agreements (FTAs) apply to this acquisition. Therefore, the Buy American restrictions are waived for designated country construction materials.
(2) The Contractor shall use only domestic or designated country construction material in performing this contract, except as provided in paragraphs (b)(3) and (b)(4) of this clause.
(3) The requirement in paragraph (b)(2) of this clause does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
[Contracting Officer to list applicable excepted materials or indicate ``none'']
(4) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(3) of this clause if the Government determines that--
(i) The cost of domestic construction…
This is the start of the file's text. The full file is on GovTribe.