SOW.doc
DOC document 23 KB Posted
- Attached to
- Crown Reach Truck or equal - rental with options
- Solicitation number
- FA4484-13-T-0031
About this file
SOW or Equal
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work FY13 Reach Trucks for Bldg. 3136 Last Revised 8/9/2013
1. General The 87 LRS Materiel Management Flight (87 LRS/LGRM) mission is to provide logistics warehouse storage and supply support for the United States Air Force and JB MDL mission partners. The Central Issue Facility (CIF) under LGRM is responsible for the mobilization and demobilization of forces. This Statement of Work (SOW) addresses the need to procure 2 reach truck rentals for Bldg. 3136. The Rentals will be for 12 months.
2. Scope of Work The reach trucks will be delivered to the CIF at Bldg. 3136 (Dix). The vender will be responsible for the shipping, delivery. The Vender will also be responsible for any necessary set up required such as installing charging outlets and installing accessories. The vender will also provide training on the new equipment for personnel.
3. Objectives
| • | Provide safe, reliable and accessibility of stored mobilization equipment. |
| • | Allow for equipment to be accessed via preexisting narrow aisles and prevent the need for warehouse modification. |
4. Personnel The selected vender will provide delivery. They will also provide installation of support equipment and all accessories. The selected vender will be responsible for providing the labor required upon delivery. The selected vender will provide all necessary material handling equipment such as forklifts or lift platforms to complete the installation. The selected vender will be responsible for the proper disposal of all packaging/crating materials and/or other waste generated in the installation process. The vender will provide training on the new equipment. LRS personnel will have access to the reach trucks upon set up and completion of training. All work must be performed Monday through Friday between the hours of7:30 am and 3:00pm. No work will be performed on weekends, federal holidays, JB MDL family days or before/after the hours specified on weekdays unless prior approval of the contracting officer's representative is obtained.
5. Equipment Requirements Bldg. 3136 Base Bid: (2) New Reach Trucks for (12) months Specifications:
-Capacity: 4500 Lbs. (must be 4500 Lbs. at 340") -Reach Height: 340" -Forks:
-Dimensions: length 42.0" Width 4.0" Thick 1.75" -Type: Standard Taper -Spread: 27" -Tilting Fork Carriage -Side shifter capability: 4" in each direction -Load Backrest 32" wide x 48" High -Steering: Forward -Drive Tires: Poly Power Supply:
-Battery Powered -Charger included Safety Features:
- Emergency Power Disconnect
- Operator Entry/Exit Safety Bar
- Mast Guard Screen
- Travel Alarm Reverse Repairs:
-The vendor will be responsible for all repairs. (Maintenance and costs)
Options: Vender to provide optional equipment for consideration.
6. Deliverables Delivery shall occur within 8 weeks of award. · Any installation required for the reach trucks will be done so within one week of delivery (i.e. Electrical charging stations).
t
File details come from the government source that posted it. Updated .