solicitation amendment 2.doc
DOC document 56 KB Posted
- Attached to
- Wallcoverings for B562 at Lakehurst NAS
- Solicitation number
- FA4484-12-R-0031
View the file
Other files
| File | Type | Posted |
|---|---|---|
| solicitation amendment 1.doc | DOC document | |
| Contractor Security Appendix with Sagem - 26 Jun 2008.doc | DOC document | |
| J-3 Past Performance Questionnaire.docx | DOCX document | |
| Wage Determination.docx | DOCX document | |
| FA4484-12-R-0031.doc | DOC document | |
| B563 Wall Covering Drawings.pdf | ||
| J-2 Past Performance Cover Letter.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been added by full text:
REVISED STATEMENT OF WORK
STATEMENT OF WORK
FOR
INSTALL PROTECTIVE WALL COVERING BUILDING 562
AT
JOINT BASE MDL, LAKEHURST, NEW JERSEY
1. DESCRIPTION OF SERVICES. The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items necessary to repair wall section and install Laminate sheet and substrate wall covering to selected areas for wall protection in hallways outside of the freight elevator.
2. TECHNICAL_REQUIREMENTS: The Contractor shall provide all the necessary labor, equipment, materials, transportation, and supervision to meet all of the following requirements:
WALL PREPARATION AND REPAIR
Remove and install drywall section, prepare, fasten, prime and paint new work to match existing wall.
1st floor wall directly across from the elevator, remove and replace 5/8”sheetrock wall section (remove portion that shows a mismatched painted mesh fabric covering) floor to ceiling starting at the outside corner, sectional width approximate to 13’ 6 ¼” , approximate total area is 140 square feet. Surface preparation prime and paint new drywall surface, paint shall be latex enamel with an eggshell finish.
WALL PROTECTION SHEETING
· Prepare and cover wall to produce a highly durable, abuse resistant and attractive finish.
· Wall panel coverage shall be approximately 4’ up from floor (wainscot design) UL approved laminate rigid sheeting (Construction Specialties, Inc. Acrovyn 4000 Wall Covering or equivalent). The approximate total square feet to all areas 500 square feet.
· Wall covering properties shall be PVC free and with shock absorbing action. Primer and adhesive materials shall be water base and non-hazardous.
· Wall coverings shall be furnished as a complete packaged system, with all primers and adhesive. Adhesives used shall be as suggested by laminate manufacturers’ installation instructions.
· A chair rail shall be installed at the top of the panel, all corners shall be covered, (2) corner guards, 1st and 2nd level are (2”X 2”X 4’) stainless steel.
· A cove base shall be installed at the wall base, bumper rails of composite material installed on wall opposite elevator opening directly above floor level cove base. One rail each floor 1st, 2nd, & 3rd floor, suggested measure (2”X 6”X 10’) rails.
· Panel shall be adhered directly to wall with manufacturer recommended adhesives. Surface finish and color to be determined prior to award upon submittal approvals of color chart and sample.
· Prepare and install flat chair rail molding (wainscot trim) bordering the top of the panel to wall, base molding, cornering, all trim work and caulking, approximately 120 linear feet total combined areas.
· Chair rail, laminate, corner guards shall not be blended, use only the designated type and style supplied by selected manufacturer.
· Paint shall be color matched to the existing finished wall.
1. Install to 1st floor wall directly across from the elevator North wall, covering for wall length of (approximately 25’ length x 4’ high) and around corner extending to 4’4” with material to include, cornering.
2. 1st floor wall covering continued from the inside corner East wall, cover wall section (approximately 19’4” length x 4’ high), end.
3. 1st floor wall directly across elevator opposite hallway West wall, install covering on wall section (approximately 13’3” length x 4’ high).
4. 2nd floor wall directly across from the elevator North wall, install covering on wall section (approximately 10.0’ length x 4’ high).
5. 3rd floor wall directly across from the elevator North wall, install covering on wall section (approximately 27.0’ length x 4’ high).
6. 3rd floor wall across from the elevator West wall hallway, install covering on wall section (approximately 11’7” length x 4’ high).
7. Note: OCCUPANCY OF PREMISES: Building will be occupied during performance of work under this Contract. Before work is started, the Contractor shall arrange with the Construction Manager a sequence of procedure, sequence of work areas, means of access, space for storage of material and equipment, and use of approaches, corridors, and stairways.
2.1. Submittals:
3. SAFETY REQUIREMENTS: This contract shall be governed by the requirements set forth in the Department of the Army, Corps. of Engineers Manual entitled "Safety and Health Requirement Manual." EM 385-1-1. The contractor shall use a qualified person to prepare the written site specific Accident Prevention Plan (APP). Prepare the APP in accordance with the format and requirements of USACE EM385-1-1 Appendix A, “Minimum Basic Outline for Preparation of Accident Prevention Plan”. The APP shall be job-specific and shall address any unusual or unique aspects of the project or activity for which it is written. Submit the APP to the Contracting Officer, JBMDL 15 calendar days after contract award and, work cannot proceed without an accepted APP. Include in the APP shall be an Activity Hazard Analysis, identifying job specific hazards and how the contractor intends to deal with these hazards. A copy may be examined on application to the Contracting Officer, JBMDL Lakehurst, Lakehurst, N.J. 08733.
a. Toxic and Hazardous Substances: The Contractor shall submit a Material Safety Data Sheet (MSDS) to the Contracting Officer, JBMDL Lakehurst for each toxic or hazardous substance to be utilized on board the Naval Air Engineering Station (NAES) Joint Base. Toxic and hazardous substances are defined in CFR 29 Part 1910 Subpart Z. MSDS'S must be submitted to the Contracting Officer, JBMDL and approved prior to commencing work. All approved toxic and hazardous substances must be labeled in accordance with CFR 29 Part 1910.1200.
Any adjacent areas dissembled, damaged, or removed by the contractor during installation shall be properly repaired by the contractor at no expense to the Government. Any and all debris / trash generated by this project shall be removed and properly disposed of off base by the contractor. The contractor or his representative (QAP) shall be on site during duty hours or the hours of work being accomplished. The contractor shall coordinate the time that work will be accomplished with the points of contact listed below. The contractor shall be responsible for daily clean up at the work site and complete restoration of the area after completion of the work. All work shall be accomplished in accordance with all Federal, state, and local laws and regulations, applicable building codes and standards, NEC, NFPA, BOCA, & CABO, and OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) codes.
4. SITE VISIT:
A site visit of the facility will be scheduled and Contractor attendance is highly recommended.
5. SPECIAL REQUIREMENTS:
The work site shall remain clean and clutter free since this area is an active employment site. All dumpsters or other containers for trash and debris shall be located in areas designated by the building manager and shall be subject to removal and / or relocation at the building manager’s request. These requirements shall not impact the performance period.
6. POINTS OF CONTACT:
Tech POC: Brad Yanchek, 732 323-1018, brad.yanchek@us.af.mil All related documents and correspondences to:
87 CES/CEOSS POC: Andrew Fazio, 7323-323-2860, andrew.fazio@us.af.mil The Contractor Manager or an alternate shall be available within sixty (60) minutes notice during normal duty hours, 7:30am to 4:15pm, to meet with Government personnel to discuss any problems encountered at the work site. Contractor will supply Government Quality Assurance Personnel (QAP) with phone number for contacting purposes.
7. BASE ENTRY:
The contractor shall obtain the necessary passes and /or identification for entry into Joint Base McGuire, Dix, Lakehurst for all employees prior to commencement of work. The Government reserves the right to refuse to issue an entrance pass to any employee for any reason deemed valid by the Government. The contractor shall be required to provide the Security Forces with vehicle registration(s), proof(s) of insurance, driver license(s), and a picture ID(s) to obtain a pass for entry onto the base. The Pass and Registration building is located on Rt. 547, Lakehurst, NJ.
8. SECURITY FORCE AND FIRE PROTECTION:
The Base Security Police telephone number is 732-323-4000 and the Base Fire Department telephone number is 911 for reporting a fire.
9. PERFORMANCE PERIOD:
All work shall be completed within a thirty (30) calendar day period, excluding holidays.
10. INSPECTION / ACCEPTANCE OF PROJECT COMPLETION:
A final inspection will be scheduled upon completion of all work. Contact the Quality Assurance Evaluator two (2) days prior to completion for a site visit.
Work Order #: 30087