FA4484-12-R-0031.doc

DOC document 250 KB Posted

Attached to
Wallcoverings for B562 at Lakehurst NAS
Solicitation number
FA4484-12-R-0031
Issued by

About this file

Solicitation for Wallcovering at Bldg 562 on Lakehurst NAS

View the file

Other files

File Type Posted
solicitation amendment 2.doc DOC document
solicitation amendment 1.doc DOC document
Contractor Security Appendix with Sagem - 26 Jun 2008.doc DOC document
J-3 Past Performance Questionnaire.docx DOCX document
Wage Determination.docx DOCX document
B563 Wall Covering Drawings.pdf PDF
J-2 Past Performance Cover Letter.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section A - Solicitation/Contract Form

SOLICITATION/CONTRACT FORM

Questions on this requirement must be provided in writing to the 87th Contracting Squadron by 2:00 PM EST, 14 SEPT 2012. Faxed to the attention of: Linnea Jones @ (609) 754-3735 or e-mail to: meri.jones@us.af.mil and dana.deyampert@us.af.mil Any questions received after this date may not be entertained by the government, or in the event the Government does entertain any such questions after this date, such action will not constitute an extension of proposal due date.

Reference L. Instructions, Conditions and Notices to Offerors for preparation of proposals. This solicitation will be evaluated using price and past performance information. You are required to send the questionnaire to each reference you provide. Offerors should only fill out Sections A and B of the questionnaire. Completed evaluation must be sent directly by the evaluator/respondent to the Contracting Office, Attn: Linnea Jones, email: meri.jones@us.af.mil or fax at 609 754-3735, no later than 01:00 PM 21 SEP 2012. Failure to provide this information may render an offeror non-conforming. Proposals submitted which do not provide past performance information in the format required in Section L may be eliminated from consideration for award.

Please note that all contractors responding to this solicitation must obtain a DUNS number and register on the System for Award Management (SAM) website (https://www.sam.gov/portal/public/SAM/) in order to transact business with the Department of Defense (DoD). Failure to obtain a DUNS number and register in SAM will make an offeror ineligible for award.

The estimated magnitude for this project is : less than $25,000

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lump Sum

B562 Wall Coverings

FFP

B562 Wall Coverings: repair wall section and install Laminate sheet and substrate wall covering to selected areas for wall protection in hallways outside of the freight elevator

FOB: Destination

PURCHASE REQUEST NUMBER: N6833512MP0006701

SIGNAL CODE: A

NET AMT

Section C - Descriptions and Specifications

STATEMENT OF WORK

STATEMENT OF WORK

FOR

INSTALL PROTECTIVE WALL COVERING BUILDING 562

AT

JOINT BASE MDL, LAKEHURST, NEW JERSEY

1. DESCRIPTION OF SERVICES. The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items necessary to repair wall section and install Laminate sheet and substrate wall covering to selected areas for wall protection in hallways outside of the freight elevator.

2. TECHNICAL_REQUIREMENTS: The Contractor shall provide all the necessary labor, equipment, materials, transportation, and supervision to meet all of the following requirements:

WALL PREPARATION AND REPAIR

Remove and install drywall section, prepare, fasten, prime and paint new work to match existing wall.

1st floor wall directly across from the elevator, remove and replace 5/8”sheetrock wall section (remove portion that shows a mismatched painted mesh fabric covering) floor to ceiling starting at the outside corner, sectional width approximate to 13’ 6 ¼” , approximate total area is 140 square feet. Surface preparation prime and paint new drywall surface, paint shall be latex enamel with an eggshell finish.

WALL PROTECTION SHEETING

· Prepare and cover wall to produce a highly durable, abuse resistant and attractive finish.

· Wall panel coverage shall be approximately 4’ up from floor (wainscot design) UL approved laminate rigid sheeting (Construction Specialties, Inc. Acrovyn 4000 Wall Covering or equivalent). The approximate total square feet to all areas 500 square feet.

· Wall covering properties shall be PVC free and with shock absorbing action. Primer and adhesive materials shall be water base and non-hazardous.

· Wall coverings shall be furnished as a complete packaged system, with corner guards and bumper rails included and containing all primers and adhesive. Adhesives used shall be as suggested by laminate manufacturers’ installation instructions.

· A chair rail shall be installed at the top of the panel, all corners shall be covered. A cove base shall be installed at the wall base.

· Panel shall be adhered directly to wall with manufacturer recommended adhesives. Surface finish and color to be determined prior to award upon submittal approvals of color chart and sample.

· Prepare and install flat chair rail molding (wainscot trim) bordering the top of the panel to wall, base molding, cornering, all trim work and caulking, approximately 120 linear feet total combined areas.

· Chair rail, laminate, corner guards shall not be blended, use only the designated type and style supplied by selected manufacturer.

· Paint shall be color matched to the existing finished wall.

1. Install to 1st floor wall directly across from the elevator North wall, covering for wall length of (approximately 25’ length x 4’ high) and around corner extending to 4’4” with material to include, cornering.

2. 1st floor wall covering continued from the inside corner East wall, cover wall section (approximately 19’4” length x 4’ high), end.

3. 1st floor wall directly across elevator opposite hallway West wall, install covering on wall section (approximately 13’3” length x 4’ high).

4. 2nd floor wall directly across from the elevator North wall, install covering on wall section (approximately 10.0’ length x 4’ high).

5. 3rd floor wall directly across from the elevator North wall, install covering on wall section (approximately 27.0’ length x 4’ high).

6. 3rd floor wall across from the elevator West wall hallway, install covering on wall section (approximately 11’7” length x 4’ high).

7. Note: OCCUPANCY OF PREMISES: Building will be occupied during performance of work under this Contract. Before work is started, the Contractor shall arrange with the Construction Manager a sequence of procedure, sequence of work areas, means of access, space for storage of material and equipment, and use of approaches, corridors, and stairways.

3. SAFETY REQUIREMENTS: This contract shall be governed by the requirements set forth in the Department of the Army, Corps. of Engineers Manual entitled "Safety and Health Requirement Manual." EM 385-1-1. The contractor shall use a qualified person to prepare the written site specific Accident Prevention Plan (APP). Prepare the APP in accordance with the format and requirements of USACE EM385-1-1 Appendix A, “Minimum Basic Outline for Preparation of Accident Prevention Plan”. The APP shall be job-specific and shall address any unusual or unique aspects of the project or activity for which it is written. Submit the APP to the Contracting Officer, JBMDL 15 calendar days after contract award and, work cannot proceed without an accepted APP. Include in the APP shall be an Activity Hazard Analysis, identifying job specific hazards and how the contractor intends to deal with these hazards. A copy may be examined on application to the Contracting Officer, JBMDL Lakehurst, Lakehurst, N.J. 08733.

a. Toxic and Hazardous Substances: The Contractor shall submit a Material Safety Data Sheet (MSDS) to the Contracting Officer, JBMDL Lakehurst for each toxic or hazardous substance to be utilized on board the Naval Air Engineering Station (NAES) Joint Base. Toxic and hazardous substances are defined in CFR 29 Part 1910 Subpart Z. MSDS'S must be submitted to the Contracting Officer, JBMDL and approved prior to commencing work. All approved toxic and hazardous substances must be labeled in accordance with CFR 29 Part 1910.1200.

Any adjacent areas dissembled, damaged, or removed by the contractor during installation shall be properly repaired by the contractor at no expense to the Government. Any and all debris / trash generated by this project shall be removed and properly disposed of off base by the contractor. The contractor or his representative (QAP) shall be on site during duty hours or the hours of work being accomplished. The contractor shall coordinate the time that work will be accomplished with the points of contact listed below. The contractor shall be responsible for daily clean up at the work site and complete restoration of the area after completion of the work. All work shall be accomplished in accordance with all Federal, state, and local laws and regulations, applicable building codes and standards, NEC, NFPA, BOCA, & CABO, and OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) codes.

4. SITE VISIT:

A site visit of the facility will be scheduled and Contractor attendance is highly recommended.

5. SPECIAL REQUIREMENTS:

The work site shall remain clean and clutter free since this area is an active employment site. All dumpsters or other containers for trash and debris shall be located in areas designated by the building manager and shall be subject to removal and / or relocation at the building manager’s request. These requirements shall not impact the performance period.

6. POINTS OF CONTACT:

Tech POC: Brad Yanchek, 732 323-1018, brad.yanchek@us.af.mil All related documents and correspondences to:

87 CES/CEOSS POC: Andrew Fazio, 7323-323-2860, andrew.fazio@us.af.mil The Contractor Manager or an alternate shall be available within sixty (60) minutes notice during normal duty hours, 7:30am to 4:15pm, to meet with Government personnel to discuss any problems encountered at the work site. Contractor will supply Government Quality Assurance Personnel (QAP) with phone number for contacting purposes.

7. BASE ENTRY:

The contractor shall obtain the necessary passes and /or identification for entry into Joint Base McGuire, Dix, Lakehurst for all employees prior to commencement of work. The Government reserves the right to refuse to issue an entrance pass to any employee for any reason deemed valid by the Government. The contractor shall be required to provide the Security Forces with vehicle registration(s), proof(s) of insurance, driver license(s), and a picture ID(s) to obtain a pass for entry onto the base. The Pass and Registration building is located on Rt. 547, Lakehurst, NJ.

8. SECURITY FORCE AND FIRE PROTECTION:

The Base Security Police telephone number is 732-323-4000 and the Base Fire Department telephone number is 911 for reporting a fire.

9. PERFORMANCE PERIOD:

All work shall be completed within a thirty (30) calendar day period, excluding holidays.

10. INSPECTION / ACCEPTANCE OF PROJECT COMPLETION:

A final inspection will be scheduled upon completion of all work. Contact the Quality Assurance Evaluator two (2) days prior to completion for a site visit.

Work Order #: 30087

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
Destination
Government
Destination
Government

CLAUSES INCORPORATED BY REFERENCE

52.246-12
Inspection of Construction
AUG 1996

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC
0001
30 dys. ADC
1
87 CES/CEO-F3A3Q5

MR. JOSEPH FLEMMING

3104 VANDENBERG AVE

MCGUIRE AFB NJ 08641

609-754-4868

FOB: Destination F3A3Q5

Section G - Contract Administration Data

WAWF INSTRUCTIONS

WIDE AREA WORK FLOW (WAWF) PROGRAM

In March 2003, the Department of Defense Federal Acquisition Supplement (DFARS) subpart 232.70 – Electronic Submission and Processing of Payment Requests was issued. In accordance with this, we are excited about the deployment of a new system, Wide Are Work Flow Receipt and Acceptance (WAWF-RA). This Electronic Commerce (E-Commerce) system will benefit both you and the Air Force as we partner with each other in the implementation of this new way of conducting business. It is also important to note that in addition to this, the Department of Defense (DoD) Appropriations Act of 2001, Section 1008 - Electronic Submission and Processing of Claims for Contract Payments, requires that any claim for payment under a DoD contract shall be submitted in electronic form. The full text is found on the Defense Finance and Accounting Service (DFAS) web site http://www.dod.mil/dfas/legislative/ and in 10 U.S.C Chapter 131.

WAWF-RA is designed to automate commercial invoices and government receiving reports in a web-based, paperless environment. WAWF-RA allows vendors to create and instantaneously submit invoices and receiving reports directly to DFAS and/or government receivers from any location in the world. Once documents are submitted, vendors are afforded full viewing capability and are able to monitor document status from submission to acceptance and processing by the DFAS payment office. WAWF-RA utilizes e-mail to notify all parties involved in the payment process of the current status of each document; thus eliminating U.S. mail lag-time.

Since documents will now be entered and stored in a database, there is no need for multiple copies. They cannot be “lost” or “misplaced”, and are viewable by all necessary parties during the entire payment process via a secure web site. Changes to rejected documents can be easily made and resubmitted on-line - - no more re-typing, resending, or re-faxing. Discounts become available on the first day of the discount period instead of being lost due to paperwork shuffling and postal delays. WAWF-RA should speed up the vendor payment process and get you your money faster.

McGuire AFB began using testing this new system in February 2004 and plans to fully implement it by April 2004. There are no costs involved to get you started. Registration and software are provided FREE OF CHARGE and we will be available to assist you in every step of the way. To get started, your company will need a user ID and password for accessing the WAWF-RA system. This can be obtained by visiting the WAWF-RA website at https://wawf.eb.mil/ and following the instructions under Help with registration for access to WAWF-RA. Under About WAWF – RA, you will also find links for Functional Information, Setting Up Your Machine, Accessing Web Based Training, and Frequently Asked Questions. Additionally, we have attached a Wide Area work Flow – Receipt and Acceptance (WAWF-RA) Vendor Instructions, Installation, and Registration Checklist. Should you have questions about the WAWF-RA system or the website, please don’t hesitate to contact a Defense Information Systems Agency (DISA) customer support representative toll-free at 1-866-618-5988 or e-mail them at cscassig@ogden.disa.mil. (Please include “WAWF” in the subject line of all e-mail requests.)

Wide Area Work Flow Receipt and Acceptance (WAWF-RA) Vendor Instructions

Installation and Registration Checklist

Completion of all instructions contained in this checklist must be accomplished prior to activation of the firm and user accounts.

1. Check Central Contractor Registration System (CCR) to see if your company is registered.

· If you are registered in CCR, please go to Step 3 below.

· For help with registration in CCR, contact CCR Helpdesk, 888-227-2423 or 269-961-4725, e-mail CCR@dlis.dla.mil, or see the CCR Handbook at http://www.ccr.gov/handbook.cfm.

2. Register with Central Contractor Registry (CCR).

· All vendors desiring to bid on goods or services in support of Department of Defense (DoD) must be registered in the CCR at http://www.ccr.gov/.

· Ensure that all mandatory fields are completed in your new CCR account (i.e., Telephone/FAX number, Data Universal Numbering System (DUNS) and/or Commercial and Government Entity (CAGE) codes, North American Industry Code Systems (NAICS) codes, etc.).

· Note: All contractors are required to update their CCR registration annually. Failure to do so will result in suspension of the account, which will prevent or delay awarding DoD contracts and payments to your firm.

3. Establish an Electronic Business Point of Contact (EB POC).

· The next step is to ensure that you have identified an EB POC for your company. You are required to establish both a primary and alternate EB POC for each CAGE/DUNS code assigned to the firm.

· To see if an EB POC is listed for your company, go to http://www.ccr.gov/

HYPERLINK "http://www.ccr2000.com/" http://www.ccr2000.com/ and click on "Search CCR." Where prompted, enter the DUNS or CAGE or Company Name and click "Submit Query." If you are presented with a list of DUNS numbers, you will need to pick the specific location and click on the DUNS.

· Scroll to the bottom of the Inquiry Results page. There you can see if anyone is listed as the EB POC. If no one is listed, your company has not identified an EB POC yet. If you see that there is no one listed as your company’s EB POC, you need click on “Update or Renew Registrations Using TPIN” to add it.

· Each vendor organization may establish up to two EB POC’s (primary and alternate) for each Cage/DUNS combination.

· The EB POC will be responsible for authorizing access to employee(s) of the vendor’s organization to view and/or modify data submitted on behalf of the vendor.

· Update NAICS codes developed by the Census Bureau, which replaced the Standard Industrial Classification (SIC) codes. Until NAICS codes are updated, update will not be complete. For more info on NAICS codes, visit: http://www.census.gov/epcd/www/naics.html

4. Determine if your organization will designate a Group Administrator (GAM) (Proceed to paragraph 5 if you are not going to designate a GAM).

· In medium to large sized companies, there may be a need to establish more than one GAM.

· A GAM determines who has access to the WAWF-RA vendor account.

· The initial GAM shall be the person designated as the EB POC. To appoint additional GAM’s, each vendor must submit an official appointment letter signed by the EB POC.

· The appointment letter should be faxed to the WAWF-RA Customer Support Center.

· The Group Administrator's Manual is available for reviewing to all WAWF-RA registered users.

· The GAM Manual can be found in the Software Users Manual link within the WAWF-RA application.

5. Establish an organizational email address

· All records created in WAWF-RA are stored in a virtual file folder and as status is updated or changes the system generates an email notification to applicable individuals identified in the firm’s organizational email account.

· The GAM or EB POC shall provide the organizational email to the WAWF-RA Customer Support Center.

· Ensure that your firm’s organizational email address is operational and can receive email from WAWF-RA prior to registering your email address with the WAWF-RA Customer Support Center.

· Note: If you do not set up an organizational email address, the personal email address of the first person who self-registers from your firm (CAGE/DUNS code), will be designated as the organizational email address for your firm.

6. Set up PCs to access WAWF-RA

· Set up the PCs of your organization's users to access WAWF-RA.

· Select the "Setting Up Your Machine" link on the WAWF-RA home page for more information: https://wawf.eb.mil/Instr.html.

7. Have all users self-register on the WAWF-RA web site

· Every user for your firm must self-register on the WAWF-RA web site by completing the online registration form.

· Select the "Self Register" link on the WAWF-RA home page and follow the instructions.

· Users may access WAWF-RA with either a User ID/Password combination or a PKI certificate. Users who want to use a PKI certificate must obtain it before self-registering.

· PKI Certificates may be obtained from one of the approved Interim External Certificate Authorities: Operational Research Consultants Inc. http://eca.orc.com, Digital Signature Trust Co. http://www.digsigtrust.com/home.html, or Verisign: http://www.verisign.com. The web sites provide the instructions needed to acquire a PKI Certificate.

· If further assistance is needed, contact the WAWF-RA Customer Service Center.

· Note: Registrations will not be activated until the WAWF-RA Customer Support Center receives an email from the EB POC/GAM as registered in the CCR data- base.

8. Follow-up (if necessary).

· If your (GAM or user) account hasn't been activated within 2 business days of self-registering contact the WAWF-RA Customer Service Center:

CONUS ONLY 1-800-392-1798, Option 1

COMMERCIAL 801-777-3282, Option 1

DSN 777-3282 Option 1

FAX Commercial: 801-605-7453 DSN: 388-7543

Email: cscassig@ogden.disa.mil Note: Reference "WAWF" in email Subject line.

BPN ver 05.21.2006

Section H - Special Contract Requirements

SPECIAL REQUIREMENTS

FEDERAL HOLIDAYS

The following Federal Legal holidays are observed by this base:

New Year’s Day

1 January

Martin Luther King’s Birthday Third Monday in January

President’s Day

Third Monday in February

Memorial Day

Last Monday in May

Independence Day

4 July

Labor Day

First Monday in September

Columbus Day

Second Monday in October

Veteran’s Day

11 November

Thanksgiving Day

Fourth Thursday in November

Christmas Day

25 December

PREPARATION OF MATERIAL APPROVAL SUBMITTALS

The submittals contemplated by the clause herein entitled “Material and Workmanship” shall be accomplished on and in accordance with instructions pertaining to AF Form 3000, Material Approval Submittal.

ENTRY TO THE BASE

To reduce delay time while preserving required security, the following points should be considered in planning to enter the base:

a. Prior to entering the base, the prime contractor must furnish the Contracting Officer a list of his/her employees (to include subcontractor employees) on Company letterhead, who will require entrance to the base. This personnel listing shall include the employees complete name, home address, social security number, (immigration number for Non-U.S. legal immigrants), date of birth, driver’s license state and number; and if using their own POV include vehicle type and color, vehicle make and model, and vehicle registration number. Employees not included on the list will be denied entry to the base. The list must be updated, as employees are added/deleted. The list shall include the contract number and expiration date of the contract.

b. Additionally all contractors shall be required to provide information on personnel requesting access to McGuire AFB, NJ, to a local police department for a criminal background check. This check is done at the contractor's expense. Any police department will suffice as all police departments use a national database. The criminal background check must be completed no later than seven working days before the start date of contract. The 305th Security Forces Squadron will not be used to conduct this criminal background check.

c. Privately Owned Vehicles (not more than 2 axle): The Government reserves the right to search any and all vehicles authorized entrance to the base, including those contractor owned. Privately owned vehicles (POV) should enter the base by Gate 1 (Main Gate) or Gate 2 (24 Hour Gate) on Wrightstown-Cookstown Road. Drivers of privately owned vehicles must have a valid drivers license, picture identification, and proof of insurance and valid registration on the vehicle. All privately owned vehicles must proceed directly to the work area.

d. Construction/Delivery Vehicles: Construction / delivery vehicles must enter the base by Gate 9 on Saylors Pond Road. Guard force personnel and/or military working dogs will inspect Construction / delivery vehicles. Delivery schedules should be arranged in advance and vendors made aware that a delay of up to four hours could be expected in entering the base. Deliveries after 4:00 P.M. will not be allowed entry into the base. All construction/delivery vehicles must proceed directly to the work area. Drivers of construction / delivery vehicles must have valid drivers licenses, picture identification and proof of insurance and valid registration on the vehicle before entering the base. In addition, any other construction / delivery people present in the vehicle must also have picture identification to enter the base. Special provisions will be made for time-sensitive materials such as concrete or asphalt, which will be explained at the pre-construction conference.

PERIODS OF NATIONAL EMERGENCY

During periods of national emergency, contractors may be requested to depart the base immediately. Contractors may be denied entry to the base until the Government determines normal operations can resume. In the event this occurs, the contract will be extended, upon written request of the Contractor submitted to the Contracting Officer, for the length of time the contractor was denied entry to the base. No other relief or compensation shall be granted.

Health Care: The medical treatment facility will provide urgent health care to contract employees (contract employee is not a Government employee but is a contractor or an employee of a contractor)for injuries occurring while on duty. Urgent health care is defined as medical care authorized to the extent necessary to save life or limb and prevent undue pain and suffering. The contract employee will be transferred to a civilian medical facility as soon as the contract employee is stabilized. The cost of such treatment will be paid for, in full, within a reasonable period of time, by the contract employee and will not be borne by the 305th Medical Treatment Facility, the United States Air Force or the Government. An AF Form 1127, Hospital Invoice/Receipt/Accounts Receivable Record, will be prepared to ensure collection and/or billing of charges. If a contract employee cannot pay for the treatment at the time of discharge, a statement of charges and a letter of indebtedness will be completed and billed to the contract employee for medical services rendered. An accounts receivable record will be established for each contract employee who receives medical care and is unable to pay at the time of discharge. Follow-up on accounts receivable will be completed in accordance with AFI 41-120, Medical Resource Operations. After an accounts receivable record is established and billing for outpatient medical services has occurred, the SF 558, Medical Record - Emergency Care and Treatment, will be annotated with the date of billing and the voucher number and forwarded to Outpatient Records to be filed in the medical record folder. The contract employee shall ensure that he/she provides timely notice to his/her medical insurance company and that if the insurance company is to make payment, the insurance company has adequate information and documentation to make payment. A contract employee treated in a natural disaster is not charged for outpatient care."

Antiterrorism:

As a prelude and during performance of any contract on McGuire AFB, it is critical that the contractor be supportive of all DoD requirements to protect personnel, their families, installations, facilities, information, and other resources from terrorist acts.

All contractors and sub-contractors are responsible for providing their personnel information on the McGuire Antiterrorism Program.

During performance of work, personnel security and protection of resources is critical for the installation to maintain a safe work environment. Contractor personnel will be alert for any suspicious activity observed by their work force or any personnel working on the installation. If any situation appears to be suspicious, immediate actions must be taken to make proper notification to McGuire Law Enforcement by calling the McGuire Security Forces Desk at 2001. Both personnel and vehicles must be strictly controlled during performance of duty. No personnel and/or equipment will be allowed to be placed in harms way that could aid or abet anyone with bad intention to cause harm to McGuire AFB. Any contractor doing construction work will adhere to the DoD Unified Facilities Construction Code Requirements. Contractors are encouraged to contact the McGuire Antiterrorism Office at (609) 754-1397 or 1611 for information regarding the installation Antiterrorism Program.

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.202-1
Definitions
JAN 2012
52.204-7
Central Contractor Registration
FEB 2012
52.204-9
Personal Identity Verification of Contractor Personnel
JAN 2011
52.204-10
Reporting Executive Compensation and First-Tier Subcontract Awards
FEB 2012
52.209-6
Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
DEC 2010
52.215-8
Order of Precedence--Uniform Contract Format
OCT 1997
52.219-27
Notice of Service-Disabled Veteran-Owned Small Business Set-Aside
NOV 2011
52.222-1
Notice To The Government Of Labor Disputes
FEB 1997
52.222-3
Convict Labor
JUN 2003
52.222-6
Davis Bacon Act
JUL 2005
52.222-7
Withholding of Funds
FEB 1988
52.222-8
Payrolls and Basic Records
JUN 2010
52.222-9
Apprentices and Trainees
JUL 2005
52.222-10
Compliance with Copeland Act Requirements
FEB 1988
52.222-11
Subcontracts (Labor Standards)
JUL 2005
52.222-12
Contract Termination-Debarment
FEB 1988
52.222-13
Compliance with Davis-Bacon and Related Act Regulations.
FEB 1988
52.222-14
Disputes Concerning Labor Standards
FEB 1988
52.222-15
Certification of Eligibility
FEB 1988
52.222-21
Prohibition Of Segregated Facilities
FEB 1999
52.222-26
Equal Opportunity
MAR 2007
52.222-27
Affirmative Action Compliance Requirements for Construction
FEB 1999
52.222-36
Affirmative Action For Workers With Disabilities
OCT 2010
52.222-50
Combating Trafficking in Persons
FEB 2009
52.223-5
Pollution Prevention and Right-to-Know Information
MAY 2011
52.223-6
Drug-Free Workplace
MAY 2001
52.223-17
Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
MAY 2008
52.223-18
Encouraging Contractor Policies To Ban Text Messaging While Driving
AUG 2011
52.225-10
Notice of Buy American Act Requirement--Construction Materials
FEB 2009
52.225-13
Restrictions on Certain Foreign Purchases
JUN 2008
52.227-1
Authorization and Consent
DEC 2007
52.227-4
Patent Indemnity-Construction Contracts
DEC 2007
52.232-5
Payments under Fixed-Price Construction Contracts
SEP 2002
52.232-23
Assignment Of Claims
JAN 1986
52.232-27
Prompt Payment for Construction Contracts
OCT 2008
52.232-33
Payment by Electronic Funds Transfer--Central Contractor Registration
OCT 2003
52.233-1
Disputes
JUL 2002
52.233-3
Protest After Award
AUG 1996
52.233-4
Applicable Law for Breach of Contract Claim
OCT 2004
52.236-2
Differing Site Conditions
APR 1984
52.236-5
Material and Workmanship
APR 1984
52.236-6
Superintendence by the Contractor
APR 1984
52.236-7
Permits and Responsibilities
NOV 1991
52.236-9
Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-14
Availability and Use of Utility Services
APR 1984
52.242-13
Bankruptcy
JUL 1995
52.242-14
Suspension of Work
APR 1984
52.243-4
Changes
JUN 2007
52.243-5
Changes and Changed Conditions
APR 1984
52.244-6
Subcontracts for Commercial Items
DEC 2010
52.246-12
Inspection of Construction
AUG 1996
52.246-21
Warranty of Construction
MAR 1994
52.249-10
Default (Fixed-Price Construction)
APR 1984
52.253-1
Computer Generated Forms
JAN 1991
252.203-7000
Requirements Relating to Compensation of Former DoD Officials
SEP 2011
252.203-7002
Requirement to Inform Employees of Whistleblower Rights
JAN 2009
252.204-7003
Control Of Government Personnel Work Product
APR 1992
252.204-7004 Alt A
Central Contractor Registration Alternate A
SEP 2007
252.223-7006
Prohibition On Storage And Disposal Of Toxic And Hazardous Materials
APR 2012
252.232-7003
Electronic Submission of Payment Requests and Receiving Reports
JUN 2012
252.232-7010
Levies on Contract Payments
DEC 2006
252.236-7000
Modification Proposals-Price Breakdown
DEC 1991
252.243-7001
Pricing Of Contract Modifications
DEC 1991
252.243-7002
Requests for Equitable Adjustment
MAR 1998
5352.223-9001
Health and Safety On Government Installations
JUN 2012

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 days after notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (APR 2012)

(a) Definitions. As used in this clause--

Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is ``not dominant in its field of operation'' when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.

(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

(3) For long-term contracts--

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code assigned to this contract. The small business size standard corresponding to this NAICS code can be found at http://www.sba.gov/content/table-small-business-size-standards.

(d) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is 500 employees.

(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the rerepresentation required by paragraph (b) of this clause by validating or updating all its representations in the Online Representations and Certifications Application and its data in the Central Contractor Registration, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause that the data have been validated or updated, and provide the date of the validation or update.

(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.

(g) If the Contractor does not have representations and certifications in ORCA, or does not have a representation in ORCA for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

The Contractor represents that it ( ) is, ( ) is not a small business concern under NAICS Code 238320- assigned to contract number.

(Contractor to sign and date and insert authorized signer's name and title).

(End of clause)

52.222-22 PREVIOUS CONTRACTS AND COMPLIANCE REPORTS (FEB 1999)

The offeror represents that --

(a) ( ) It has, ( ) has not participated in a previous contract or subcontract subject to the Equal Opportunity clause of this solicitation;

(b) ( ) It has, ( ) has not, filed all required compliance reports; and

(c) Representations indicating submission of required compliance reports, signed by proposed subcontractors, will be obtained before subcontract awards.

(End of provision)

52.225-9 BUY AMERICAN ACT—CONSTRUCTION MATERIALS (SEP 2010)

(a) Definitions. As used in this clause--

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is--

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C. App. 1702), such as agricultural products and petroleum products.

Component means an article, material, or supply incorporated directly into a construction material.

Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Domestic construction material means--

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if--

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

Foreign construction material means a construction material other than a domestic construction material.

United States means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements the Buy American Act (41 U.S.C. 10a-10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction material description Unit of measure Quantity Price (dollars) \1\

Item 1

Foreign construction material.... ....................... .NONE

Domestic construction material

Item 2

Foreign construction material.... ....................... ..NONE

Domestic construction material

Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).

List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

Include other applicable supporting information.

(End of clause)

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil

(End of clause)

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Title File Drawing No.

1st Floor

2nd Floor

3rd Floor

(End of clause)

AFFARS 5352.201-9101

OMBUDSMAN (AUG 2005)

(a) An ombudsman has been appointed to consider and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the party to another official who can resolve the concern. The ombudsman may not serve as an advocate for any party.

(b) Before consulting with an ombudsman, concerned parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).

(c) If resolution cannot be made by the contracting officer, concerned parties may contact the Center/MAJCOM ombudsmen. Concerns, issues, disagreements, and recommendations that cannot be resolved at the MAJCOM/DRU level, may be brought by the concerned party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (703) 588-7004, facsimile number (703) 588-1067. Mr Gregg Oneal, HQ AMC/A7K, 507 Symington Drive, Scott AFB IL 62225-5022, (618) 229-0184, fax (618) 256-6668, email: gregg.oneal@us.af.mil

(d) The ombudsman has no authority to render a decision that binds the agency.

(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the Contracting Officer.

(End of clause)

5352.223-9000 Elimination of Use of Class I Ozone Depleting Substances (ODS).

As prescribed in 5323.804, insert the following clause in solicitations and contracts:

ELIMINATION OF USE OF CLASS I OZONE DEPLETING SUBSTANCES (ODS)

(MAY 1996)

(a) It is Air Force policy to preserve mission readiness while minimizing dependency on Class I Ozone Depleting Substances (ODS), and their release into the environment, to help protect the Earth's stratospheric ozone layer.

(b) Unless a specific waiver has been approved, Air Force procurements:

(1) May not include any specification, standard, drawing, or other document that requires the use of a Class I ODS in the design, manufacture, test, operation, or maintenance of any system, subsystem, item, component, or process; and

(2) May not include any specification, standard, drawing, or other document that establishes a requirement that can only be met by use of a Class I ODS;

(c) For the purposes of Air Force policy, the following are Class I ODS:

(1) Halons: 1011, 1202, 1211, 1301, and 2402;

(2) Chlorofluorocarbons (CFCs): CFC-11, CFC-12, CFC-13, CFC-111, CFC-112, CFC-113, CFC-114, CFC-115, CFC-211, CFC-212, CFC-213, CFC-214, CFC-215, CFC-216, and CFC-217, and the blends R-500, R-501, R-502, and R-503; and

(3) Other Controlled Substances: Carbon Tetrachloride, Methyl Chloroform, and Methyl Bromide.

(d) The Air Force has reviewed the requirements specified in this contract to reflect this policy. Where considered essential, specific approval has been obtained to require use of the following substances:

Substance Application Use Quantity (lbs.)

NONE

(e) To assist the Air Force in implementing this policy, the offeror/contractor is required to notify the contracting officer if any Class I ODS not specifically listed above is required in the performance of this contract.

(End of clause)

5352.242-9000 Contractor access to Air Force installations.

As prescribed in 5342.490-1, insert a clause substantially the same…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .