This is a Questions & Answers document for the B764 Flooring Replacement contract opportunity (FA446026Q0368), dated 18 March 2026. The document clarifies contract line items and project requirements for contractors bidding on the flooring replacement work at a dormitory facility.

The contract includes three CLINs: 0001 for LABOR (furnish, remove/install flooring per the Performance Work Statement), 0002 for LVT FLOORING, and 0003 for COVE BASE. Working hours are Monday through Friday, 0700-1600, with extended hours available by coordination with the facility manager and Contracting Officer's Representative. The facility has no elevator; contractors must use the main center stairwell or two exterior stairwells (requiring facility manager coordination). The contractor is responsible for all waste disposal, including dumpster rental and associated fees or permits, which can be arranged through GFL via the Recycle Center or an alternative waste provider. The facility contains tables, chairs, and small desks that will be moved by the facility manager. Contractors may use 4.5" wall base to cover old paint lines, but the contract will not be modified for additional expenses related to this choice. The facility manager will disconnect and remove computers and other electronic equipment from areas scheduled for flooring replacement, relieving the contractor of this responsibility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B764 Flooring Replacement Questions & Answers

FA446026Q0368

18 Mar 2026

1) Question: In COMBOSOL attachment page 3 under pricing schedule line item 0001, 0002, 0003 are asking the same thing in a different way.

Answer: There might be an issue viewing the full line items in the COMBOSOL. Here are the CLINS.

Line Item 0001: LABOR required furnish, remove/install flooring IAW PWS

Line Item 0002: LVT FLOORING IAW PWS

Line Item 0003: COVE BASE IAW PWS

This package was created using CLINS listed are for 0001 LABOR, 0002 LVT FLOORING, and 0003 COVE BASE. That is how we intend the billing to be viewed/paid.

1) Question: What are the working hours?

Answer: Normal base hours are M-F 0700-1600. This facility is a dormitory with extensive traffic. Extended hours may be available depending on mission and facility manager thru the COR.

2) Question: Can we have a dumpster in the parking lot near the building?

Answer: PWS Para 1.5 – All waste disposals are the responsibility of the contractor to include any fees or permits. Contractor can contract a dumpster through GFL via Recycle Center 501-987-6611 or waste provider of their choice.

3) Question: What kind of furniture are in the areas?

Answer: Furniture includes tables, chairs, and small desk. Moving of furniture will be coordinated through facility manager.

4) Question: I would like to see if there is an elevator in the building that goes to the floors that are part of this project and what the wight limit.

Answer: No elevator in this facility. It consist of main center stairwell and two exterior stairwells at end of facility. Use of two exterior stairwells will have to be coordinated with facility manager.

5) Question: I would recommend using a 4.5" wall base to cover the old paint line

Answer: Using 4.5” wall base can be used. However, contract will not be modified for additional expense.

6) Question: Will the Government be responsible for disconnecting and removing computers and other electronic equipment in areas scheduled for flooring replacement, or is this the responsibility of the contractor?

Answer: Disconnecting and moving computers and other electronics will be the responsibility of the facility manager.