This document is a set of Questions and Answers related to a federal contract opportunity for the FY24 Fiber to Buildings 714, 718 & 846 at Little Rock Air Force Base, Arkansas.

The key details are:

  • The fiber connectivity is required to provide the 19th Civil Engineer Squadron dorm managers the capability to access the AFNET from their assigned dorms, and to provision the Energy Management Control Systems the means to remotely control/monitor the HVAC, lighting, and water heating systems of the facilities.
  • The Statement of Objectives defines the requirements for the contractor to engineer, furnish, install, and test new maintenance hole/duct-bank infrastructure and single mode fiber optic cable to connect the specified buildings to the existing base fiber optic infrastructure.
  • The contractor shall comply with current TIA telecommunication installation and testing commercial standards and base installation standards.
  • Responses must be submitted via email by 4:00 PM CDT on Friday, July 5, 2024.
  • The government intends to award one purchase order to the lowest priced technically acceptable offer.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F2S3374059AC02-FY24 FIBER to BLDGS 714, 718 and 846 Questions (Posed from previous solicitation) and Answers By: SSgt Rodgers

· How are we to get from MH-43B to BLDG 846?

Fiber will be direct buried from MH-43B to newly installed 2” duct across roadway until reaching B846. (see SOO, p.28)

· Is there any max-cell that needs to be installed for this project?

Per the SOO. The new conduit being installed from MH-43A to HH-43C the contractor will be responsible to provide and also install MaxCell.

For the rest of the run. If a section along the route does not have MaxCell or the MaxCell is all already in use. 19CS will provide the MaxCell for the contractor to run.