Attach 9 - Questions and Answers.pdf
PDF 76 KB Posted
- Solicitation number
- FA446023R0003
About this file
This document contains questions and answers regarding Solicitation Number FA446023R0003 for an Architect-Engineer Indefinite Delivery Indefinite Quantity contract with the Department of the Air Force Air Mobility Command. The government seeks to consider for Section E resumes and Section F projects only those that have been fully designed and constructed after January 2018 and January 2019 respectively. There is no page limitation for submissions. Eligible projects must be located on Little Rock Air Force Base or other Air Force bases, be design-bid-build, involve industrial or medical facilities, and have a construction cost over $500,000.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attach 4 - Subcontractor Consent Form.pdf | ||
| Attach 7 - PPQ Template.pdf | ||
| Attach 6 - PPQ Instructions.pdf | ||
| Attach 8 - PPQ Client Letter.docx | DOCX document | |
| Attach 2 - Statement of Work.docx | DOCX document | |
| Attach 1 - Request for Qualifications Italiano Update.docx | DOCX document | |
| Attach 3 - SF 330.pdf | ||
| Attach 5 - Cover Sheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers for A&E (FA446023R0003)
1. Am I correct in interpreting the following paragraph to mean that, for the Section E resumes, the government only wants to see/will consider projects on the resumes that have been fully designed and fully constructed within the time frame indicated?
“Submit maximum five relevant projects for each Member in which the proposed Team Member had a significant role. Submit in the same order listed above in Section C: Proposed Team, 1) projects located on Little Rock or other Air Force Bases, 2) design completed on or after 1 January 2018, 3) construction completed on or after 1 January 2021, 4) design-bid-build, 5) industrial or medical, 6) repair or alteration, 7) multiple discipline projects, 8) projects requiring LEED Certification, Life Safety, or Environmental Analysis, 9) projects with Construction Cost Greater than $500K, and 10) projects performed with current firm.”
YES
2. Similarly, do I understand correctly that, for Section F projects, the government only wants to see/will consider projects that been fully designed and constructed within the time frame indicated?
“Submit maximum five recently completed design-bid-build or design-build projects designed by the Architect-Engineer Firm, preferably with the same role members proposed for the Team. Include projects that clearly state 1) to be constructed on Little Rock or any other Air Force Base, 2) to have designs completed on or after 1 January 2019, 3) to be construction complete on or after 1 January 2020, 4) to be design-bid-build, 5) to be industrial or medical, 6) to be primarily repair or alteration, 7) to have multiple discipline complexity, 8) to have required LEED certification, Life Safety, or Environmental Analysis, 9) to have a construction cost greater than $500K, 10) to be occupied during construction and require phasing, 11) to be designed with same team members as the proposed Team as elaborated below in Section G.”
YES
3. Is there a page limitation for this SF330? NO
If yes, are Part II’s, CPARS and Past Performance Questionnaires excluded from the page count?