Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER NKAK 17-1100 (1-4) | PROJECT TITLE: CIVIL WORKS IDIQ | SOLICITATION / CONTRACT NO.: FA4460-17-R-0004 | ||||||||||||||
| For Official Use Only | |||||||||||||||||
| (To be completed by Project Architect or Engineer) | (To be completed by Contract Administrator) | ||||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date
(MM/DD/YY)
fergusog: Enter any comments pertaining to the submittal
| 1 | 01 14 19 Coordenation 1.15 Radioactive Material | X | X | X | |||||||||
| 2 | 01 45 00 Quality Control, Cultural Resource Management AND QC Plan | X | X | X | |||||||||
| 3 | 01 33 00 1.05 Temporary Erosion Control Measures | X | X | X | X | X | X | X | X | X | |||
| 4 | 01 45 00 3.01 GIS AND AS-BUILTS | X | X | X | |||||||||
| 5 | 01 57 23 Storm Water Pollution Prevention Plan 1.03 | X | X | X | |||||||||
| 6 | 02 42 00 Construction & Demolition Wast Reports | X | X | ||||||||||
| 7 | 03 20 01 Concrete Reinforcement | X | X | X | |||||||||
| 8 | 03 31 00 Cast-In-Place Concrete | X | X | X | X | X | |||||||
| 9 | 04 21 13 Brick Masonry | X | X | X | X | X | X | ||||||
| 10 | 04 71 10 Cast Stone | X | X | X | X | X | X | ||||||
| 11 | 05 50 13 Metal Fabrications | X | X | X | |||||||||
| 12 | 05 50 90 Metal Screen Wall | X | X | X | X | X | X | ||||||
| 13 | 05 52 13 Handrails | X | X | X | |||||||||
| 14 | 26 05 19 Wire and Cables | X | X | X | |||||||||
| 15 | 26 05 43 Underground Electric Service | X | X | ||||||||||
| 16 | 26 05 48 Seismic Protection | X | X | X | X | ||||||||
| 17 | 26 05 53 Identification | X | X | X | |||||||||
| 18 | 26 05 74 Transient Voltage Surge Suppresor | X | X | X | X | ||||||||
| 19 | 26 09 13 Metering | X | X | X | X | ||||||||
| 20 | 26 23 05 Service Disconnects | X | X | ||||||||||
| 21 | 26 23 10 Equipment Disconnect | X | X | X | |||||||||
| 22 | 26 24 00 Panel Boards | X | X | X | |||||||||
| 23 | 26 27 26 Wiring Devices | X | X | ||||||||||
| 24 | 26 50 00 Lighting | X | X | X | X | X | |||||||
| 25 | 31 00 00 Civil Works Earthwork: Topsoil | X | X | X | X | ||||||||
| 26 | 32 01 17.63 Reflective Crack Pavement Membrane | X | X | X | |||||||||
| 27 | 32 01 19 Field Molded Sealant | X | X | X | X | X | X | X | |||||
| 28 | 32 01 20 Hot-Applied Sealant For Asphalt Crack Repair | X | X | X | X | X | X | X | |||||
| 29 | 32 01 22 Bituminous Rejuvenation | X | X | X | X | X | X | ||||||
| 30 | 32 12 10 Bituminous Prime and Tack Coat | X | X | X | X | X | |||||||
| 31 | 32 17 23 Bollards | X | X | X | X | X | X | X | |||||
| 32 | 32 17 26 Cast In Place Detectable Warning Surface Tiles | X | X | X | X | X | X | X | |||||
| 33 | 32 17 26.10 Retrofit Detectable Warning Surface Tiles | X | X | X | X | X | X | X | |||||
| 34 | 32 92 20 Hydroseeding | X | X | X | X | ||||||||
| 35 | 32 92 23 Sodding | X | X | X | X | ||||||||
| 36 | 32 93 01 Trees, Shrubs, & Groundcovers | X | X | X | X | ||||||||
| 37 | 33 31 00 Miscellaneous Construction | X | X | X | X | X | |||||||
| 38 | 207 Stone Backfill | X | X | ||||||||||
| 39 | 214 Subgrade Preparation | X | X | ||||||||||
| 40 | 303 Aggregate Base Course | X | X | ||||||||||
| 41 | 405 Asphalt Concrete Hot Mix Base Course | X | X | X | |||||||||
| 42 | 406 Asphalt Concrete Hot Mix Binder Course | X | X | X | |||||||||
| 43 | 407 Asphalt Concrete Hot Mix Surface Course | X | X | X | |||||||||
| 44 | 418 Slurry Seal | X | X | X | |||||||||
| 45 | 603 Maintenance of Traffic, Traffic Control Plan, Traffic Control Supervisor | X | X | X | |||||||||
| 46 | 604Traffic Control Devices in Construction Zones | X | X | X | X | X | |||||||
| 47 | 606 Pipe Culverts | X | X | X | X | ||||||||
| 48 | 609 Drop Inlets and Junction Boxes | X | X | X | X | ||||||||
| 49 | 610 Manholes, Drop Inlets and Junction Boxes Adjusted to Grade | X | X | X | X | ||||||||
| 50 | 611 Pipe Underdrains, Outlet Protectors, and Covers | X | X | X | X | ||||||||
| 51 | 625 Geotextile Fabric | X | X | X | |||||||||
| 52 | 633 Concrete Walks and Concrete Steps | X | X | X | X | X | |||||||
| 53 | 634 Curbing | X | X | X | |||||||||
| 54 | 641 ABA Ramps | X | |||||||||||
| 55 | 705 Loop Wiring Duct | X | X | X | X | X | X | ||||||
| 56 | 718 Reflectorized Paint Pavement Marking | X | X | X | X | X | |||||||
| 57 | 719 Thermoplastic Pavement Marking | X | X | X | X | X | |||||||
| 58 | 722 Plowable Pavement Marking | X | X | X | X | ||||||||
| 59 | 726 Standard Signs | X | X | X | X | ||||||||
| 60 | 32 13 13 6" & 8" CONCRETE PAVING (4,000 PSI) | X | X | X | X | ||||||||
| 61 | 32 11 36 LOW COMPRESSION CONCRETE (2,500 PSI) | X | X | X | X | ||||||||
| 62 | Reflective Crack Pavement Membrane 32 01 18 | X | X | X | X | ||||||||
| 63 | Detectable Warning Safety Tiles 32 01 17 | X | X | X | X | ||||||||
| 64 | |||||||||||||
| 65 | |||||||||||||
| 66 | |||||||||||||
| 67 | |||||||||||||
| 68 | |||||||||||||
| 69 | |||||||||||||
| Schedule of Material Submittals Template, Feb 05 (SAF/AQCP) (REPLACES OBSOLETE AF FORM 66) |
Attachment 5 Page &P of &N
Sheet1
File details come from the government source that posted it. Updated .