Attachment_4_-_15-1049_Schedule_of_Material_Submittals.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- RPR (SUS) Fuel Pantograph Arm Building 546 Federal contract opportunity
- Solicitation number
- FA4460-15-B-0010
About this file
Attachment 4 - FA4460-15-B-0010 - Schedule of Material Submittals
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B-546_Pantograph_Vendor_Questions.docx | DOCX document | |
| 20150804_133750_resized.jpg | JPG image | |
| 20150804_133740_resized.jpg | JPG image | |
| NKAK_15-1049_-_Site_Visit_Rosters.pdf | ||
| NKAK_15-1049_-_Date_Mod.pdf | ||
| Attachment_3_-_C D_Report.doc | DOC document | |
| Attachment_5_-_EMIS_Instruction_Guide.doc | DOC document | |
| Attachment_7_-_LRAFB_Information.docx | DOCX document | |
| FA4460-15-B-0010.doc | DOC document | |
| Attachment_6_-_Wage_Determination_AR150169.docx | DOCX document | |
| Attachment_2_-_Environmental_MOA.doc | DOC document | |
| Attachment_1_-_NKAK_15-1049_-_SOW.doc | DOC document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule SCHEDULE OF MATERIAL SUBMITTALS NKAK 15-1049, RPR(SUS) FUEL PANTOGRAPH ARM Building 546
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED: 4 | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S INSTALLATION INSTRUCTIONS | MANUFACTURER'S WARRANTY | PRODUCT DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | LEED CREDIT SUBMITTAL SHEET | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date
(MM/DD/YY)
fergusog: Enter any comments pertaining to the submittal
| 1 | 01 14 19 Coordination 1.15 Radioactive Material | X | X | X | |
| 2 | 01 45 00 Quality Control 1.04 Cultural Resource Management | X | |||
| 3 | 01 45 00 1.05 Temporary Erosion Control Measures | X | X | X | |
| 4 | 01 57 23 Storm Water Pollution Prevention Plan 1.03 | X | X | X | |
| 5 | |||||
| 6 | |||||
| 7 | |||||
| 8 | |||||
| 9 | |||||
| 10 | |||||
| 11 | |||||
| 12 | |||||
| 13 | |||||
| 14 | |||||
| 15 | |||||
| 16 | |||||
| 17 | |||||
| 18 | |||||
| 19 | |||||
| 20 | |||||
| 21 | |||||
| 22 | |||||
| 23 | |||||
| 24 | |||||
| 25 | |||||
| 26 | |||||
| 27 | |||||
| 28 | |||||
| 29 | |||||
| 30 | |||||
| 31 | |||||
| 32 | |||||
| 33 | |||||
| 34 | |||||
| 35 | |||||
| Schedule of Material Submittals Template, Feb 2010 (SAF/AQCP) AF FROM 66 |