Attachment_4_-_15-1049_Schedule_of_Material_Submittals.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
RPR (SUS) Fuel Pantograph Arm Building 546 Federal contract opportunity
Solicitation number
FA4460-15-B-0010
Issued by
Department of the Air Force Air Mobility Command

About this file

Attachment 4 - FA4460-15-B-0010 - Schedule of Material Submittals

View the file

Other files for this federal contract opportunity

Other files attached to RPR (SUS) Fuel Pantograph Arm Building 546, newest first.
File Type Posted
B-546_Pantograph_Vendor_Questions.docx DOCX document
20150804_133750_resized.jpg JPG image
20150804_133740_resized.jpg JPG image
NKAK_15-1049_-_Site_Visit_Rosters.pdf PDF
NKAK_15-1049_-_Date_Mod.pdf PDF
Attachment_3_-_C D_Report.doc DOC document
Attachment_5_-_EMIS_Instruction_Guide.doc DOC document
Attachment_7_-_LRAFB_Information.docx DOCX document
FA4460-15-B-0010.doc DOC document
Attachment_6_-_Wage_Determination_AR150169.docx DOCX document
Attachment_2_-_Environmental_MOA.doc DOC document
Attachment_1_-_NKAK_15-1049_-_SOW.doc DOC document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule SCHEDULE OF MATERIAL SUBMITTALS NKAK 15-1049, RPR(SUS) FUEL PANTOGRAPH ARM Building 546

(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED: 4
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S INSTALLATION INSTRUCTIONSMANUFACTURER'S WARRANTYPRODUCT DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSLEED CREDIT SUBMITTAL SHEETREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date

(MM/DD/YY)

fergusog: Enter any comments pertaining to the submittal

101 14 19 Coordination 1.15 Radioactive MaterialXXX
201 45 00 Quality Control 1.04 Cultural Resource ManagementX
301 45 00 1.05 Temporary Erosion Control MeasuresXXX
401 57 23 Storm Water Pollution Prevention Plan 1.03XXX
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Schedule of Material Submittals Template, Feb 2010 (SAF/AQCP) AF FROM 66