Attachment 3 - PWS updated.pdf

PDF 4 MB Posted

Attached to
CAMP WARLORD FIRE DETECTION SYSTEM
Solicitation number
FA4460
Issued by

About this file

This document is a Performance Work Statement (PWS) for a federal contract opportunity to furnish, remove, and install a fire notification system at 13 facilities of Camp Warlord on Little Rock AFB, AR.

The contractor shall provide all necessary personnel, transportation, tools, equipment, materials, and services to complete the work within 90 days of contract award. The work must comply with all National Fire Protection Association guidelines, as well as federal, state, and local regulations, codes, and license requirements. The contract requires the contractor to provide a new, complete fire alarm system including system wiring, raceways, pull boxes, terminal cabinets, devices, notification appliances, and other accessories. The contractor must also disconnect and remove the existing fire alarm system. Government testing and acceptance of the new system is required prior to placing it into service.

View the file

Other files

File Type Posted
Attachment 8 - B-1431 - All Huts.pdf PDF
Attachemnt 7 - Question answers.docx DOCX document
Attachment 3 - PWS updated.pdf PDF
Attachment 9 - 1401 Plan.pdf PDF
Combined Synopsis.docx DOCX document
Attachment 3 - PWS updated.pdf PDF
Attachment 3 - PWS updated 21 Aug.pdf PDF
Combined Synopsis.docx DOCX document
Attachment 6 - Question answers.pdf PDF
Combined Synopsis.docx DOCX document
Combined Synopsis.docx DOCX document
Combined Synopsis.docx DOCX document
Attachment 5 - Addendum.pdf PDF
Attachment 2 - Wage Determination.pdf PDF
Attachment 1 - Clauses.pdf PDF
Attachment 3 - PWS.pdf PDF
Attachment 4 - Brand name justification.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

29 July 2024

PERFORMANCE WORK STATEMENT (PWS)

FURNISH, REMOVE AND INSTALL FIRE NOTIFICATION SYSTEM

CAMP WARLORD FACILITIES

1. DISCRIPTION OF SERVICES

1.1. The contractor shall provide all qualified personnel, transportation, tools, equipment, materials and services required to furnish, remove and replace fire notification system in 13 facilities of Camp Warlord on Little Rock AFB, AR 72099. The contractor shall accomplish all services below to meet the requirements of this Performance Work Statement (PWS). Work shall be in compliance with all National Fire Protection Association guidelines, Federal, State and local regulations, codes and license requirements. Work shall be accomplished within 90 days of contract award date.

1.2. The Government will neither supervise contractor employees nor control the method by which the contractor performs the required tasks. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services or give the perception of personal services. If the contractor feels that any actions constitute, or are perceived to constitute personal services, it shall be the contractor’s responsibility to notify the Contracting Officer (CO) immediately. These services shall not be used to perform work of a policy/decision making or management nature, (e.g., inherently governmental functions). All decisions relative to programs supported by the contractor shall be the sole responsibility of the Government.

2. SAFETY AND REGULATORY REQUIREMENTS

2.1. Camp Warlord is a training camp. It comprises of 15 facilities, 1377, 1383, 1401, 1403, 1404, 1405, 1406, 1407, 1408, 1409, 1410, 1411, 1412, 1413, 1414. Building 1401 will hold main fire alarm equipment (panels, etc.) and must communicate to all devices in 15 facilities.

Contractor shall coordinate with government representative for access. Work shall be accomplished during the hours of 7am to 4pm, Monday-Friday excluding Federal Holidays.

Escort will be provided by the facility user.

2.2. Pre-Install Requirements: Before services are commenced, the contractor shall inspect the work site and ascertain all information for the diligent performance of the service(s). The contractor shall notify the ordering agency of any conditions that prevent the suitable completion of these services to include operations that could endanger Government personnel or property and require appropriate abatement action. If the contractor discovers problems associated with the work after starting, he or she shall immediately notify the Contracting Officer (CO) for their approval if the work is to continue. Coordinate with the Government designated representative to have utilities/fire alarms etc…turned on or off during the competition of the task.

2.3. Disposal of waste: All waste disposals are the responsibility of the contractor to include any fees or permits. Recycling containers may be provided if needed for the operation.

Coordinate through your government representative or Contracting Officer Representative

(COR).

2.4. All work shall be accomplished in accordance with all UFGS 28 31 76, UFC 3-600-01, UFC 4-021-01 and UFC 4-010-06. Contractor must use newest regulations regarding the installation and repair of fire notification systems.

3. WORK REQUIREMENTS

3.1. Drawings provided by the contractor. The capabilities of the cabins shall be to communicate with the main cabin (Bldg #1401) that shall then transmit to the local fire department in the event of an emergency. This is not a mass notification system. This project is a basic fire alarm system repair and replacement. All the sleeping facilities must have carbon monoxide detectors as part of the installation.

3.1.1. Contractor shall provide drawings including control unit, batteries and charger (if remotely mounted), supervising stations transceiver, annunciator, primary power supply, remote annunciator, detectors, notification appliances (unless performance requirements are specified), and each alarm initiating device including fire extinguishing system equipment.

3.1.2. Contractor shall show single-line fire alarm system riser diagram. Each device on riser should be identified by type. Indicate connection of equipment.

3.1.3. Contractor shall show fire alarm operating matrix system must be placed on the drawings.

Show actions of input devices such as detectors, manual stations, waterflow switches, initiating devices, etc. on one axis and output functions such as door releases, smoke control fans, elevator relays, indicating/notification appliances etc. on the other. Entries which require descriptions, explanation of processes, sequences, interfaces, etc. can be flagged by symbols keyed to supplementary notes. Alternately provide a zone-by-zone sequence of operation or a schedule identifying all initiators, outputs, and interfaces.

3.1.4. Contractor shall show addressable Fire Alarm Systems generally utilize Signal Line Circuits (SLC) for communication between devices. Normally all devices are addressable or will have an addressable interface device installed integrally with the device. Initiating Device Circuits (IDC) should be provided for interfacing to existing IDC loops or connection between non-addressable devices and the SLC.

3.1.5. This work includes designing and providing a new, complete, fire alarm system as described herein and contract drawings. Include system wiring, raceways, pull boxes, terminal cabinets, outlet and mounting boxes, control equipment, initiating devices, notification appliances, supervising station fire alarm transmitters, and other accessories and miscellaneous items required for a complete operational system even though each item is not specifically mentioned or described. Provide systems complete and ready for operation. Existing interior fire alarm system was manufactured by Monaco. Design and installation must comply with UFGS 25 05 11, UFC 4-010-06 and AFGM 2019-320-02.

3.1.6. Contractor shall provide equipment, materials, installation, workmanship, inspection, and testing in strict accordance with NFPA 72, except as modified herein. The system layout on the drawings shows the intent of coverage and suggested locations. Final quantity, system layout, and coordination are the responsibility of the Contractor.

3.1.7. Each remote fire alarm control unit must be powered from a wiring riser specifically for that use or from a local emergency power panel located on the same floor as the remote fire alarm control unit. Where remote fire control units are provided, equipment for notification appliances may be located in the remote fire alarm control units.

3.1.8. The fire alarm system must be independent of the building security, building management, and energy/utility monitoring systems other than for control functions.

3.2. Contractor must provide all materials and equipment.

3.2.1. Provide all materials, equipment, and devices that have been tested by a nationally recognized testing laboratory and listed for fire protection service when so required by NFPA 72 or this specification. Select material from one manufacturer – FCI/Monaco, where possible, and not a combination of manufacturers, for any classification of materials. Material and equipment must be the standard products of a manufacturer regularly engaged in the manufacture of the products for at least 2 years prior to bid opening. Only use equipment needed for repairs and replacement. No mass notification equipment needed.

3.2.2. Major components of equipment must have the manufacturer's name, address, type or style, model or serial number, catalog number, date of installation, installing Contractor's name and address, and the contract number provided on a new name plate permanently affixed to the item or equipment. Major components include, but are not limited to, the following:

3.2.2.1. FACU Nameplates must be etched metal or plastic, permanently attached by screws to control units or adjacent walls.

3.2.3. Keys and locks for equipment, control units and devices must be identical. Master all keys and locks to a single key as required by the Installation Fire Department.

3.2.4. Provide a typeset printed or typewritten instruction card mounted behind a glass cover in a stainless-steel frame. Install the instructions on the interior of the FACU. The card must show those steps to be taken by an operator when a signal is received as well as the functional operation of the system under all conditions, normal, alarm, supervisory, and trouble. The instructions must also include procedures for operating live voice microphones. The instructions and their mounting location must be approved by the Contracting Officer before being posted.

3.3. Fire alarm (FACU) control unit provided by the contractor.

3.3.1. Contractors must provide a complete fire alarm (FACU) fully enclosed in a lockable steel cabinet as specified herein. Operations required for testing or for normal care, maintenance, and use of the system must be performed from the front of the enclosure. If more than a single unit is required at a location to form a complete control unit, the unit cabinets must match exactly. The system must be capable of defining any module as an alarm module and report alarm trouble, loss of polling, or as a supervisory module, and reporting supervisory short, supervisory open or loss of polling such as waterflow switches, valve supervisory switches, fire pump monitoring, independent smoke detection systems, relays for output function actuation.

3.3.2. Contractor must install control unit components in cabinets large enough to accommodate all components and to allow ample gutter space for interconnection of control units as well as field wiring. The cabinet must be a sturdy steel housing, complete with back box, hinged steel door with cylinder lock, and surface mounting provisions. The enclosure must be identified by an engraved phenolic resin nameplate. Lettering on the nameplate must say "Fire Alarm and Mass Notification control unit" and must not be less than 25 mm 1-inch high. Provide prominent rigid plastic or metal identification plates for lamps, circuits, meters, fuses, and switches.

3.3.3. Provide an alarm silencing switch at the FACU that must silence the audible and visual notification appliances. Subsequent activation of initiating devices must cause the notification appliances to re-activate.

3.3.4. Provide supervisory and trouble silencing switch(es) that must silence the audible trouble and supervisory signal(s), but not extinguish the visual indicator. This switch must be overridden upon activation of a subsequent supervisory or trouble condition. Audible trouble indication must resound automatically every 24 hours after the silencing feature has been operated if the supervisory or trouble condition still exists.

3.3.5. Power and supervise each circuit such that a signal from one device does not prevent the receipt of signals from any other device. Initiating devices must be manually reset by switch from the FACU after the initiating device or devices have been restored to normal.

3.3.6. The Audible Notification System must comply with the requirements of NFPA 72 for Emergency Voice/Alarm Communications System requirements except as specified herein. The system must be a one-way, multi-channel voice notification system incorporating user select ability of a minimum eight distinct sounds for tone signaling, and the incorporation of a voice module for delivery of recorded messages. Audible appliances must produce a three-pulse temporal pattern for three cycles followed by a voice message that is repeated until the control unit is reset or silenced. Automatic messages must be broadcast through speakers throughout the building/facility but not in stairs or elevator cabs. A live voice message must override the automatic audible output through use of a microphone input at the control unit or the LOC.

3.3.7. Contractor shall use UFGS 28.31.76 for all equipment and materials that must be provided.

3.4. Installation

3.4.1. Locate the FACU where indicated on the drawings. The FACU must be located in conditioned space. Conductor terminations must be labeled and a drawing containing conductor, their labels, their circuits, and their interconnection must be permanently mounted in the FACU.

Locate the document storage cabinet adjacent to the FACU unless the Contracting Officer directs otherwise.

3.4.2. When batteries will not fit in the FACU, locate battery cabinets below or adjacent to the FACU. Battery cabinets must be installed at an accessible location when standing at floor level.

Installing batteries above drop ceilings or in inaccessible locations is prohibited. Battery cabinets must be large enough to accommodate batteries and to allow ample gutter space for interconnection of control units as well as field wiring. The cabinet must be provided in a sturdy steel housing, complete with back box, hinged steel door with cylinder lock, and surface mounting provisions. The cabinet must be identified by an engraved phenolic resin nameplate.

Lettering on the nameplate must indicate the control unit(s) the batteries power and must not be less than 25 mm1- inch high.

3.4.3. Locate manual stations as required by NFPA 72 and as indicated on the drawings. Mount stations so they are located no farther than 1.5 m 5 feet from the exit door they serve, measured horizontally. Manual stations must be mounted at to the operating handle.

3.4.4. Locate smoke and heat detectors as indicated on the drawings. Install heat detectors not less than 100 mm 4 inches from a side wall to the near edge. Heat detectors located on the wall must have the top of the detector at least 100 mm 4 inches below the ceiling, but not more than 300 mm 12 inches below the ceiling. Smoke detectors are permitted to be on the wall no lower than 300 mm 12 inches from the ceiling with no minimum distance from the ceiling. In raised floor spaces, install the smoke detectors to protect 21 square meters 225 square feet per detector.

Install smoke detectors no closer than 1 m 3 feet from air handling supply diffusers. Detectors installed in acoustical ceiling tiles must be centered in the tiles plus or minus 50 mm 2 inches.

3.4.5. Locate carbon monoxide detectors as indicated on the drawings on a 100-mm 4-inch mounting box. Carbon monoxide detectors must be installed separate from smoke and/or heat detectors.

3.4.6. Locate the graphic annunciator as shown on the drawings. Mount the annunciator, with the top 1830 mm 6 feet above the finished floor or center the annunciator at 1525 mm 5 feet, whichever is lower.

3.4.7. Locate the LCD annunciator as shown on the drawings. Mount the annunciator, with the top 2 m 6 feet above the finished floor or center the annunciator at 1.5 m 5 feet, whichever is lower.

3.4.8. Locate the LOC(s) as required by NFPA 72 and UFC 4-021-01 as indicated. Mount the so that the top message button and microphone is no higher than 1200 mm 4 feet above the floor and the bottom (lowest) message button and microphone is at least 1-meter 3 feet above the finished floor.

3.4.9. Provide ceiling bridges for ceiling-mounted appliances. Ceiling bridges must be as recommended/required by the manufacturer of the ceiling-mounted notification appliance.

3.4.10. Provide wiring installed in a neat and workman like manner and installed parallel with or at right angles to the sides and back of any box, enclosure, or cabinet. Protect all fire wall and smoke wall penetrations with a UL approved system. Conductors that are terminated, spliced, or otherwise interrupted in any enclosure, cabinet, mounting, or junction box must be connected to screw-type terminal blocks. Mark each terminal in accordance with the wiring diagrams of the system. The use of wire nuts or similar devices is prohibited. Wiring to conform with NFPA 70.

3.4.11. Labeling of conductors at terminal blocks in terminal cabinets, FACU and the LOC must be provided at each conductor connection. Each conductor or cable must have a shrink-wrap label to provide a unique and specific designation. Each terminal cabinet, FACU, and remote FACU must contain a laminated drawing that indicates each conductor, its label, circuit, and terminal. The laminated drawing must be neat, using 12-point lettering minimum size, and mounted within each cabinet, control unit, or unit so that it does not interfere with the wiring or terminals. Maintain existing color code scheme were connecting to existing equipment.

3.5. Disconnection and removal of existing system.

3.5.1. Maintain existing fire alarm system fully operational until the new equipment has been tested and accepted by the Contracting Officer. As new equipment is installed, label it "NOT IN SERVICE" until the new equipment is accepted. Once the new system is completed, tested, and accepted by the Government, it must be placed in service and connected to the supervising station. Remove tags from new equipment and tag the existing equipment "NOT IN SERVICE" until removed from the building. No decommissioned equipment is permitted to be abandoned in place.

3.5.2. Contractor shall use UFGS 28.31.76 for all disconnection and removal of existing system instructions.

3.5.3. All fire and smoke wall penetrations will be closed with UL approved systems.

3.6. Pre-Government Testing

3.6.1. Conduct inspections and tests to ensure that devices and circuits are functioning properly.

Tests must meet the requirements of paragraph entitled "Minimum System Tests" as required by NFPA 72. The contractor and an authorized representative from each supplier of equipment must be in attendance at the pre-Government testing to make necessary adjustments. After inspection and testing is complete, provide a signed Verification of Compliant Installation letter by the QFPE that the installation is complete, compliant with the specification and fully operable. The letter must include the names and titles of the witnesses to the pre-Government tests. Provide all completion documentation as required by NFPA 72 including all referenced annex sections and the test reports.

3.6.2. When the verification of compliant installation has been completed, submit a formal request for Government final test to the Contracting Officer's Representative (COR).

Government final testing will not be scheduled until the DFPE has received copies of the request for Government final testing and Verification of Compliant Installation letter with all required reports. Government final testing will not be performed until after the connections to the installation-wide fire reporting system and the installation-wide mass notification system have been completed and tested to confirm communications are fully functional. Submit request for test at least 15 calendar days prior to the requested test date.

3.6.3. If equipment was found to be defective or non-compliant with contract requirements, perform corrective actions and repeat the tests. Tests must be conducted and repeated, if necessary, until the system has been demonstrated to comply with all contract requirements.

3.6.4. The tests must be performed in accordance with the approved test procedures in the presence of the DFPE. Furnish instruments and personnel required for the tests.

3.6.5. Contractor shall use UFGS 28.31.76 for all final testing requirements.

4. GOVERNMENT FURNISHED EQUIPMENT

4.1. None

5. GENERAL REQUIREMENTS

5.1. Contractor personnel and vehicles must possess appropriate passes. These shall be obtained from Installation Security Forces Pass and ID at the Vehicle Inspection Center.

5.2. The Contractor is subject to all installation fire, safety, security, and traffic regulations.

5.3. The Government contracts on the understanding that the Contractor is complying with applicable laws concerning workplace safety.

5.4. The Contractor is subject to all citations and penalties for violation of applicable workplace safety laws. The burden of compliance rests with the Contractor. Enforcement of workplace safety laws is the responsibility of the agency specified in the applicable law.

5.5. The Contracting Officer may notify the Contractor of hazards in Contractor operations that endanger Government personnel or property and require appropriate action. This provision does not constitute assumption of liability for Occupational Safety and Health compliance on the part of the Government or negate other agency responsibility for enforcement of applicable laws.

5.6. Accident prevention principles must be thoroughly integrated into all operations. Unsafe conditions and practices, as identified by the designated representative, must be corrected immediately.

5.7. Contractor Employees: While on the installation, the contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the Contracting Officer as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population. Contractor personnel shall present a neat appearance and be easily recognized as contractor employees. This may be accomplished by wearing distinctive clothing bearing the name of the organization or by wearing appropriate badges containing the organization's name and the employee's name. Contractor personnel must wear issued base identification cards at all times while on the installation.

5.8. Service contracts shall require contractor employees to identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with government personnel. In addition, contracts shall require contractor personnel to appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.

6.0. WARRANTY

6.1. Contractor shall guarantee all material, workmanship and labor from defects for a period of 12 months from the date of acceptance of the work. A warranty letter detailing the work accomplished per facility is required to be furnished to the government representative upon acceptance of the work.

7.0. APPENDIXES

Appendix A: Location Map of the Facilities.

Appendix B: Commander’s Environmental Policy Appendix C: UFGS 28 31 76 Appendix D: UFC 4-021-01 Appendix E: UFC 4-010-06

UFC 4-010-06

10 October 2023

UNIFIED FACILITIES CRITERIA (UFC)

APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED

CYBERSECURITY OF

FACILITY-RELATED

CONTROL SYSTEMS (FRCS)

This Page Intentionally Left Blank

UNIFIED FACILITIES CRITERIA (UFC)

CYBERSECURITY OF FACILITY-RELATED CONTROL SYSTEMS (FRCS)

Any copyrighted material included in this UFC is identified at its point of use.

Use of the copyrighted material apart from this UFC must have the permission of the copyright holder.

Indicate the Military Department Preparing Activity responsible for the document.

U.S. ARMY CORPS OF ENGINEERS

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND (Preparing Activity)

AIR FORCE CIVIL ENGINEER CENTER

Record of Changes (changes are indicated by \1\ ... /1/)

Change No. Date Location

This UFC supersedes UFC 4-010-06, dated September, 2016, with Change 1 dated January 2017.

FOREWORD

The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provides planning, design, construction, sustainment, restoration, and modernization criteria, and applies to the Military Departments, the Defense Agencies, and the DoD Field Activities in accordance with USD (AT&L) Memorandum dated 29 May 2002. UFC will be used for all DoD projects and work for other customers where appropriate. All construction outside of the United States, its territories, and possessions is also governed by Status of Forces Agreements (SOFA), Host Nation Funded Construction Agreements (HNFA), and in some instances, Bilateral Infrastructure Agreements (BIA). Therefore, the acquisition team must ensure compliance with the most stringent of the UFC, the SOFA, the HNFA, and the BIA, as applicable.

UFC are living documents and will be periodically reviewed, updated, and made available to users as part of the Military Department’s responsibility for providing technical criteria for military construction. Headquarters, U.S. Army Corps of Engineers (HQUSACE), Naval Facilities Engineering Systems Command (NAVFAC), and Air Force Civil Engineer Center (AFCEC) are responsible for administration of the UFC system. Technical content of UFC is the responsibility of the cognizant DoD working group. Defense Agencies should contact the respective DoD Working Group for document interpretation and improvements. Recommended changes with supporting rationale may be sent to the respective DoD working group by submitting a Criteria Change Request (CCR) via the Internet site listed below.

UFC are effective upon issuance and are distributed only in electronic media from the following source:

• Whole Building Design Guide website https://www.wbdg.org/ffc/dod.

Refer to UFC 1-200-01, DoD Building Code, for implementation of new issuances on projects.

AUTHORIZED BY:

PETE G. PEREZ, P.E., SES

Chief, Engineering and Construction U.S. Army Corps of Engineers

R. S. SILVER, P.E.

Acting Chief Engineer and Assistant Commander, Design and Construction Naval Facilities Engineering Systems Command

DAVID H. DENTINO, SES

Deputy Director of Civil Engineers DCS/Logistics, Engineering & Force Protection (HAF/A4C) HQ United States Air Force

MICHAEL McANDREW, SES Deputy Assistant Secretary of Defense (Construction) Office of the Secretary of Defense i

TABLE OF CONTENTS

CHAPTER 1 INTRODUCTION

1-1 BACKGROUND

1-1.1 Control System Definition

1-1.2 Facility-Related Control Systems

1-1.3 Risk Management Framework (RMF)

1-2 PURPOSE AND SCOPE

1-3 APPLICABILITY

1-4 GENERAL BUILDING REQUIREMENTS

1-5 ORGANIZATION

1-6 CYBERSECURITY POINTS OF CONTACT BY SERVICE

1-7 GLOSSARY

1-8 REFERENCES

CHAPTER 2 CONTROL SYSTEM CYBERSECURITY OVERVIEW

2-1 RISK MANAGEMENT FRAMEWORK OVERVIEW

2-1.1 Security Controls

2-1.2 RMF Goal

2-1.3 RMF Roles of the Designer and Control System Installer

2-1.4 Platform Information Technology

2-1.5 Inherited Security Controls

2-1.6 Applicability of RMF Security Controls to Design

2-2 5-LEVEL CONTROL SYSTEM ARCHITECTURE

2-2.1 Architecture Is a General Architecture

2-2.2 “Standard IT” Parts of the Control System

2-2.3 “Non-Standard IT” Parts of the Control System

2-2.4 Wireless Networks

2-2.5 Platform Enclave

2-3 CONTROL SYSTEM PROCUREMENT OVERVIEW

CHAPTER 3 APPLYING CYBERSECURITY IN DESIGN

3-1 OVERVIEW

3-1.1 Five Steps for Cybersecurity Design

3-1.2 Definition of “Organization”

3-1.3 Designer Coordination ii

3-2 STEP 1: DETERMINE CONTROL SYSTEM IMPACT RATING TO USE

FOR DESIGN

3-2.1 Obtaining Actual Impact Ratings

3-2.2 When Impact Ratings Aren’t Provided

3-2.3 Considerations for Reduction of Control System Impact

3-3 STEP 2A: DETERMINATION OF SECURITY CONTROLS

3-3.1 Overlay versus Baseline

3-3.2 Determining Initial Control Set Using an Overlay

3-3.3 Recommend Security Controls to Tailor Out (or In)

3-3.4 Additional Resources and Information for Step 2A

3-4 STEP 2B: IDENTIFICATION OF CONTROL CORRELATION

IDENTIFIERS

3-5 STEP 2C: CATEGORIZATION OF CONTROL CORRELATION

IDENTIFIERS BY RESPONSIBILITY

3-5.1 Identifiers by Responsibility

3-5.2 Additional Resources and Information For Step 2C

3-6 STEP 3: INCORPORATE CYBERSECURITY REQUIREMENTS

3-6.1 Addressing DoD Selected Values in CCIs

3-6.2 Other “Organization Defined Values” in CCIs

3-6.3 Requirement Definition and Implementation CCIs

3-6.4 Additional Resources and Information for Step 3

CHAPTER 4 MINIMUM CYBERSECURITY DESIGN REQUIREMENTS

4-1 DESIGN TO MINIMIZE FAILURE

4-1.1 Reduce Dependency on the Network

4-1.2 Reduce Extraneous Functionality

4-2 DESIGN TO MANAGE FAILURE

4-2.1 Design for Graceful Failure

4-2.2 Degraded Operation

4-2.3 Redundancy

4-2.4 Redundancy with independent control systems

4-3 DO NOT IMPLEMENT STANDARD IT FUNCTIONS

4-4 DO NOT PROVIDE REMOTE ACCESS

4-5 AVOID PROBLEMATIC NETWORKS

4-6 PROTECT THE CONTROL SYSTEM WITH PHYSICAL SECURITY

iii

4-7 PROTECT PRIVILEGED USER INTERFACES

4-8 EMPLOY PRINCIPALS OF DESIGN SIMPLICITY

4-8.1 Example: Using PLCs for HVAC Control

4-8.2 Consideration of Overall System Risk

4-9 CYBERSECURITY DURING CONSTRUCTION

4-10 ADDITIONAL REQUIREMENTS FOR MODERATE SYSTEMS

CHAPTER 5 CYBERSECURITY DOCUMENTATION

5-1 OVERVIEW

5-2 USE OF GUIDE SPECIFICATION

5-3 COORDINATION WITH OTHER DISCIPLINES

5-3.1 Determination of Points of Contact

5-3.2 UFGS Coordination Issues

5-4 REQUIREMENTS BY DESIGN PHASE

5-4.1 Basis of Design (10-15%)

5-4.2 Concept Design (30-35%)

5-4.3 Interim Design (50-65%)

5-4.4 Final Design (Unreviewed 100%)

5-4.5 Issued for Construction (Reviewed 100%)

APPENDIX A RISK MANAGEMENT FRAMEWORK (RMF) OVERVIEW

A-1 RMF OVERVIEW

A-2 RMF PROCESS

A-3 DEFINITION OF CONTROLS FROM NIST AND DODI 8510

A-3.1 Control Families

A-3.2 Control Elements and Enhancements

A-3.3 Control Correlation Identifiers

A-4 REQUIREMENT DEFINITION VS IMPLEMENTATION

A-4.1 CCIs Defining a Requirement

A-4.2 CCIs Requiring Implementing a Requirement

A-5 PLATFORM INFORMATION TECHNOLOGY

APPENDIX B PLATFORM ENCLAVE

B-1 PLATFORM ENCLAVE CONCEPT OVERVIEW

B-2 PLATFORM ENCLAVE USING TWO AUTHORIZATIONS

B-3 PLATFORM ENCLAVE BENEFITS

iv

B-4 ARMY PLATFORM ENCLAVE APPROACH

B-5 NAVY PLATFORM ENCLAVE APPROACH FOR BCS AND UCS

B-6 AIR FORCE PLATFORM ENCLAVE APPROACH

APPENDIX C 5-LEVEL CONTROL SYSTEM ARCHITECTURE

C-1 INTRODUCTION

C-2 5-LEVEL ARCHITECTURE OVERVIEW

C-3 LEVEL 0: SENSORS AND ACTUATORS

C-4 LEVEL 1: FIELD CONTROL SYSTEM (NON-IP)

C-5 LEVEL 2: FIELD CONTROL SYSTEM (IP)

C-6 LEVEL 3: FIELD POINT OF CONNECTION (FPOC)

C-7 LEVEL 4: CONTROL SYSTEM FRONT END AND CONTROL SYSTEM

IP NETWORK

C-8 LEVEL 5: EXTERNAL CONNECTION AND CONTROL SYSTEM

MANAGEMENT

C-9 ARCHITECTURE FREQUENTLY ASKED QUESTIONS (FAQ)

APPENDIX D CONSIDERATIONS IN DETERMINATION OF CONTROL SYSTEM

IMPACT RATINGS

D-1 BACKGROUND

D-1.1 Types of Security Breach

D-1.2 Impact Ratings

D-2 SYSTEM CATEGORIZATION AND DETERMINATION OF IMPACT

RATING

D-2.1 Compare to Similar to Systems

D-2.2 Methodical System Review

D-2.3 System categorization based on Facility-Related Control Systems (FRCS) Master List

D-2.4 NIST SP 800-60, Vol. II -Rev. 1, Information Types

D-2.5 Summary and required categorization rationale

APPENDIX E CYBERSECURITY CONSIDERATIONS FOR INTEGRATING CRITICAL

UTILITY OR BUILDING CONTROL SYSTEMS WITH NON-CRITICAL UMCS

E-1 INTRODUCTION

E-2 LIMIT OUTSIDE FUNCTIONALITY

E-3 FCS-UMCS CONNECTION METHODS

E-3.1 Hardware I/O Interface

E-3.2 Hardware Gateway Interface v

E-3.3 Firewall Interface

E-3.4 Data Diodes

E-4 OTHER CONSIDERATIONS

E-4.1 Local User Interfaces

E-4.2 Management of Risk

APPENDIX F IMPLEMENTATION GUIDANCE FOR SECURITY CONTROLS

F-1 INTRODUCTION

F-2 GENERAL GUIDANCE

F-2.1 Control System versus Standard IT System Terminology

F-2.2 DoD-Defined Values

F-2.3 Security Controls Which are “Automatically Met”

F-2.4 Security Controls Applicability by Architecture Level

F-2.5 Impact Level Applicability

F-3 GUIDANCE FOR INDIVIDUAL SECURITY CONTROLS

F-3.1 Access Control (AC) Control Family

F-3.2 Audit and Accountability (AU) Control Family

F-3.3 Security Assessment and Authorization (CA) Control Family

F-3.4 Configuration Management (CM) Control Family

F-3.5 Contingency Planning (CP) Control Family

F-3.6 Identification and Authorization (IA) Control Family

F-3.7 Incident Response (IR) Control Family

F-3.8 Maintenance (MA) Control Family

F-3.9 Media Protection (MP) Control Family

F-3.10 Physical and Environmental Protection (PE) Control Family

F-3.11 Planning (PL) Control Family

F-3.12 Program Management (PM) Control Family

F-3.13 Personnel Security (PS) Control Family

F-3.14 Risk Assessment (RA) Control Family

F-3.15 System and Services Acquisition (SA) Control Family

F-3.16 System and Communications Protection (SC) Control Family

F-3.17 System and Information Integrity (SI) Control Family

APPENDIX G CONTROL CORRELATION IDENTIFIER (CCI) TABLES

G-1 INTRODUCTION

vi

G-2 TABLE STRUCTURE AND CONTENT

G-3 CCI TABLE NOTES

G-3.1 Controls Inherited from Platform Enclave

G-3.2 CCIs in Multiple Tables

G-4 CCI TABLE DESCRIPTIONS

G-5 CCI TABLES

APPENDIX H GLOSSARY

H-1 ACRONYMS

H-1.1 General Acronyms

H-1.2 Security Control Family Acronyms

H-2 DEFINITION OF TERMS

APPENDIX I REFERENCES

FIGURES

Figure 2-1 5-Level Control System Architecture Figure 2-2 Control System Architecture

Figure 3-1 Overview of Steps 2A through 3 Figure A-1 NIST Risk Management Framework Steps Figure A-2 NIST SP 800-53 Control AC-2

Figure B-1 Navy Platform Enclave and Operational Architecture Figure C-1 5-Level Control System Architecture

Figure D-1 - FRCS Impact Determination Flowchart Part 1 Determining Mission Impact

Figure D-2 - FRCS Impact Determination Flowchart Part 2a Determining FRCS Impact Based on Mission Impact

Figure D-3 - FRCS Impact Determination Flowchart Part 2b Determining FRCS Impact Based on Mission Impact

Figure D-4 – Example FRCS Master List Entry UMCS Categorization Based on Mission Criticality

Figure E-1 Hardware I/O Interface Example

TABLES

Table 3-1 Overlay versus Baseline Table C-1 Level 0 Table C-2 Level 1 Table C-3 Level 2 Table C-4 Level 3

Table C-5 Level 4 Table C-6 Level 5 vii

Table F-1 Access Control (AC) Control Family Table F-2 Audit and Accountability (AU) Control Family

Table F-3 Security Assessment and Authorization (CA) Control Family Table F-4 Configuration Management (CM) Control Family Table F-5 Contingency Planning (CP) Control Control Family Table F-6 Identification and Authorization (IA) Control Control Family Table F-7 Maintenance (MA) Control Control Family

Table F-8 Media Protection (MP) Control Family Table F-9 Physical and Environmental Protection (PE) Control Family Table F-10 Planning (PL) Control Family Table F-11 Program Management (PM) Control Family Table F-12 Risk Assessment (RA) Control Family

Table F-13 System and Services Acquisition (SA) Control Family Table F-14 System and Communications Protection (SC) Control Family

Table F-15 System and Information Integrity (SI) Control Family Table G-1 Summary of CCIs for LOW and MODERATE Impact Systems

Table G-2 CCIs Not Applicable to Control Systems (CS) Table G-3 CCIs Removed from LOW Impact Control Systems Baseline Table G-4 Designer CCIs for LOW and MODERATE Impact Control Systems

Table G-5 Additional Designer CCIs for MODERATE Impact Control Systems ... 181 Table G-6 Platform Enclave CCIs for LOW and MODERATE Impact Control

Systems Table G-7 Additional Platform Enclave CCIs for MODERATE Impact Control

Systems viii

CHAPTER 1 INTRODUCTION

1-1 BACKGROUND.

1-1.1 Control System Definition

Control systems are a combination of special purpose controlling devices (controllers), control components (e.g. electrical, mechanical or pneumatic sensors and actuators), and generally (but not always) network infrastructure (which may contain standard IT components) that act together upon underlying mechanical and/or electrical equipment to achieve an objective. A control system (CS) typically consists of sensors and actuators connected to networked digital controllers, includes a user interface, and is used to control and monitor equipment.

Some control systems are “monitor only” (they do not exercise control) but are still considered control systems.

1-1.2 Facility-Related Control Systems

There are many types of control systems ranging from building control systems to manufacturing control systems to weapon control systems, all with different names and terminology. Facility-Related Control Systems (FRCS) are a subset of control systems that are used to monitor and control equipment and systems related to DoD real property facilities (for example, building control systems, utility control systems, electronic security systems, and fire and life safety systems).

1-1.3 Risk Management Framework (RMF)

The Risk Management Framework (RMF) is the DoD process for applying cybersecurity to information technology (IT), including control systems. The RMF categorizes systems by the impact the system can have on organizational mission using HIGH, MODERATE, and LOW impact levels. The RMF is further described in CHAPTER 2 and APPENDIX A.

1-2 PURPOSE AND SCOPE.

This UFC describes requirements for incorporating cybersecurity in the design of all facility-related control systems which include a network. This UFC covers the cybersecurity aspects of control system design, and the requirements of this UFC must be coordinated with the control system design and the criteria relevant to the control system. This UFC only covers aspects specific to control system design. Many projects have IT-specific components (such as IP network design security) which are not covered by this UFC; in those cases, the controls designer will need to coordinate with other disciplines. This UFC defines a process for identification of cybersecurity requirements based on the Risk Management Framework suitable for control systems of any impact rating and provides specific guidance suitable for control systems assigned LOW or MODERATE impact level.

This UFC covers the incorporation of cybersecurity concepts and requirements in support of the Risk Management Framework. This UFC does not implement the RMF and does not address anything beyond the design of the system. Use of this UFC does not result in an ATO under the RMF process but will provide a system that is more capable of receiving an ATO than a system not designed in accordance with this UFC.

1-3 APPLICABILITY.

This UFC applies to all planning, design and construction, renovation, and repair of new and existing facilities (both permanent and non-permanent) and installations that result in DoD real property assets which include a control system with a network, regardless of funding source (and regardless of network type). Restated another way, this UFC applies to any project with any control system that includes architecture levels, as defined in this UFC, of 1 or higher. While this UFC can assist with the design of any system, portions of it are applicable only to the design of LOW and MODERATE impact systems and HIGH Impact system will typically require additional customized requirements to achieve appropriate levels of cybersecurity. Design of such systems should be coordinated with the points of contact provided in Paragraph 1-6.

In defining specific requirements for LOW or MODERATE systems, this UFC assumes the control system is being implemented on a DoD Installation or other DoD site, which allows inheritance of some cybersecurity controls. Systems not being implemented on a DoD Installation may require additional requirements not included in this UFC.

1-4 GENERAL BUILDING REQUIREMENTS.

Comply with UFC 1-200-01, DoD Building Code (General Building Requirements). UFC 1-200-01 provides applicability of model building codes and government unique criteria for typical design disciplines and building systems, as well as for accessibility, antiterrorism, security, high performance and sustainability requirements, and safety.

Use this UFC in addition to UFC 1-200-01 and the UFCs and government criteria referenced therein.

1-5 ORGANIZATION.

CHAPTER 2 provides an overview of the RMF as it applies to control systems, control system architecture and the cybersecurity approach to control systems. CHAPTER 3 defines a 5-step approach to incorporating cybersecurity into the design of control systems. CHAPTER 4 defines minimum design requirements for control systems to be implemented in addition to the specific requirements identified through the 5-step process described in CHAPTER 3. CHAPTER 5 defines the submittal requirements for documenting cybersecurity aspects of control system design.

APPENDIX A provides an overview of the Risk Management Framework as it pertains to control systems. APPENDIX B provides additional detail on the Platform Enclave concept. APPENDIX C describes the 5-Level architecture for control systems.

APPENDIX D describes considerations in determination of control system impact ratings. APPENDIX E discusses considerations in the integration of critical building systems into a non-critical UMCS. APPENDIX F provides guidance for security control families, and individual security controls. APPENDIX G categorizes CCIs by impact and responsibility.

1-6 CYBERSECURITY POINTS OF CONTACT BY SERVICE.

Cybersecurity policies and approaches are evolving, and projects may have unique requirements. Assistance for control system cybersecurity design is available from the following Service organizations:

• Army, other than Civil Works: Control System Cybersecurity Mandatory Center of Expertise (CSC-MCX), Huntsville Engineering and Support Center (CSC-MCX@usace.army.mil)

• Army, Civil Works: HQUSACE Engineering and Construction Control System Community of Practice Leader (controlsystemcopleader@usace.army.mil).

• Navy (and Marine Corps): Naval Facilities Engineering Command, Command Information Office (CIO).

• Air Force (and Space Force): Air Force Civil Engineering Center (AFCEC) Operations Directorate, Tyndall Air Force Base. Support can be obtained via the reach-back center at AFCEC.RBC@us.af.mil. Note: All requests for support must be initiated by the Contracting Officer's Representative (COR) or, for government-designed projects, by the Project Lead.

1-7 GLOSSARY.

APPENDIX H contains acronyms, abbreviations, and definitions.

1-8 REFERENCES.

APPENDIX I contains a list of references used in this document. The publication date or revision of the code or standard is not always included in this document. Unless otherwise specified, the most recent edition of the referenced publication applies.

CHAPTER 2 CONTROL SYSTEM CYBERSECURITY OVERVIEW

2-1 RISK MANAGEMENT FRAMEWORK OVERVIEW.

The risk assessment process, or Risk Management Framework (RMF), inventories the system components, identifies the System Owner (SO) and Authorizing Official (AO), and implements risk reduction measures. The Authorizing Official then evaluates the risk and either accepts the risk and issues an Authority to Operate (ATO) or denies the ATO. At this point, the system is allowed to operate and (if necessary) connect to DoD network infrastructure. Risk reduction measures include removal of network and wireless capabilities, documenting the system, and altering the system to limit capabilities.

APPENDIX A contains a more extensive summary of the RMF as it relates to this UFC.

It is highly recommended that readers unfamiliar with the RMF review APPENDIX A before incorporating cybersecurity requirements into control system design.

2-1.1 Security Controls.

The RMF relies on the implementation of security controls, where a control is a specific action taken to secure a system. Note that this usage of the word ‘control’ is different from control engineering or control systems engineering, which is the engineering discipline that applies control theory to design systems with desired behaviors. To provide clarity of usage, this UFC will use the term “security control” to refer to cybersecurity controls.

2-1.2 RMF Goal.

For FRCS, the goal of the RMF is to reduce and mitigate vulnerabilities until the risk to the mission supported by the FRCS is deemed acceptable by the System Owner (SO) and Authorizing Official (AO). Under the RMF, risk reduction is not "all or nothing", rather the security solution must reduce risk while considering the constraints of resources and mission requirements. For application of the RMF to control systems, the determination of cybersecurity risk reduction must also account for any additional risks to system functionality due to application of the security controls. The final decision of whether a level of risk is acceptable is made by the assigned government AO.

2-1.3 RMF Roles of the Designer and Control System Installer.

2-1.3.1 RMF Role of the Designer

The designer has one primary role and one secondary role in the RMF process. Their primary role is to identify security controls which can be addressed by the design (during project planning and design) and implement those security controls in the design. As a secondary role, the designer provides input into the risk analysis process by advising on the impact, or lack thereof, of applying security controls to the control system and by advising on how the control system does or does not impact supported missions.

For an example of the need for designer input, consider the mechanical design of an HVAC system. These systems are designed to specific criteria - design day environmental conditions - and those criteria are a compromise between a system that is oversized for most of its operation, and a system that is sometimes under-sized. The criteria are well-established, and the tradeoffs are understood and accepted.

Cybersecurity involves similar trade-offs but, unlike for HVAC design, the criteria are not well-established, and the AO must determine the balance point between an over-secure system (which will likely be more expensive, and harder to install, commission, and maintain) and a system that still has some residual risk. Evaluating this risk requires a detailed understanding of the control system functioning which the AO may not possess, necessitating input from the designer.

2-1.3.2 RMF Role of Control System Installer

The construction installer is – as with any other aspect of a construction project – responsible for meeting the specifications and requirements of the contract. They are not directly responsible for Cybersecurity. Given a proper design, meeting the specifications will provide for a proper implementation of Cybersecurity.

2-1.4 Platform Information Technology.

DoD Instructions 8500.01 and 8510.01 define the Risk Management Framework (RMF) for the DoD and establish a category for “special purpose” systems that are not traditional information technology or information systems, called Platform Information Technology (PIT) systems. These PIT systems, including control systems, use specifically tailored security controls sets and require the AO to have expertise in the system.

As further discussed in CHAPTER 3, the designer provides input into the determination of the control system impact rating by advising on the relationship between the control system and the mission supported and provides input on the security control selection by advising on the feasibility and potential impacts of applying a security control.

2-1.5 Inherited Security Controls.

An inherited security control is a security control that a system meets by virtue of someone else addressing it in such a way that it applies to the system. A control system will generally inherit security controls one of three ways: by existing within a physical security boundary, by being covered by policies and procedures already in place, or by connection to another system which addresses the security controls.

Since inheritance often requires the SO to coordinate with others, it’s critical to document all security controls the control system expects to inherit. During control system design, the designer must identify and document any security controls which are expected to be inherited.

2-1.5.1 Physical Security Inheritance Example.

DoD installations implement physical security to manage risk to an acceptable level.

For a control system on a DoD Installation, a security control requiring that members of the public not be allowed unrestricted physical access to components of a control system will be met by virtue of the control system existing within that physical security boundary. Although military installations are on occasion opened to the public for events such as boot camp graduations, the access is not unrestricted, and the level of access has been accepted by installation security. Since control systems are innately tied to and co-located with the physical systems they control, in most cases a control system will be able to inherit physical security from the installation or separately secured facilities.

2-1.5.2 Policy and Procedures Inheritance Example.

The DoD has policies in place governing many aspects of cybersecurity. A control system can therefore inherit a security control such as “the organization defines the frequency to review and update the current security planning policy”.

2-1.5.3 Connection to another System Inheritance Example.

When a control system connects to another system, such as an Installation-wide network, inheritance may not be automatic but may require an agreement between the SOs of the systems. Such an agreement would cover acceptable behavior of the control system and explicitly define the security controls that will be inherited from the other system.

2-1.6 Applicability of RMF Security Controls to Design.

Security controls cover a wide range of requirements, many of which must be addressed by someone outside the control system design process. For example, a security control1 that states “The organization protects the control system from unauthorized modification by members of the organization” is normally not addressed by the designer; but rather is addressed through policies and procedures put in place by the organization that owns and operates the control system.

2-1.6.1 Applicability of RMF Security Controls to Design of Critical Systems.

The determination of whether a security control should be applied at design can become particularly complex for more critical (higher impact) systems. While it may be sufficient for a LOW impact system to assume a particular security control is addressed by another entity, the designer of a HIGH impact system may need to explicitly address

1 This is not an actual security control, but rather an illustrative example using a fictitious control.

a security control to ensure it is being implemented properly, to apply it at a higher standard, or to provide tools to the responsible parties to assist their implementation of the security control. For example, while a security control stating2 “The organization protects the control system from unauthorized modification by members of the organization” might be addressed through policies and procedures for a LOW impact system, a higher impact system may require the designer to explicitly design in additional barriers…