This document is a Questions and Answers (Q&A) document for RFP #FA445225R0043, providing critical technical details for a communications infrastructure project. The project involves installing fiber optic and network cabling, with key specifications including 4 single-strand single-mode fiber optic cables running from the communications room to a slim panel and workstation, 4 CAT 6 cables to fill one quad box, and surface-mounted conduit and outlets. Power requirements include dedicated power with available slots in the breaker box in the communications room, with both receptacles able to use the same breaker. The communications outlet will be located per project diagram and feature four ports, with cables to be run above the ceiling when crossing between rooms. Contractors were informed that all project attachments are posted on SAM.gov, and specific fiber optic connector types will be discussed after contract award.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

RFP #FA445225R0043

Q1. What size conduit for Fiber? Or is the conduit size our call on what to install?

A1. That I the contractor’s discretion

Q2. Is there a designation on circuit number and designated panel for the 120V outlets?

A2. Nothing was designated.

Q3. Does the circuit need to be dedicated?

A3. Nice to have it if possible. Not required

Q4. If so, how far away is the location from the electrical panel?

A4. Electrical panel is in the COMM Room

Q5. Can the outlets be surface mounted?

A5. YES, that is the intent with block wall. All other conduit is surface mounted in the area.

Q6. Can we run MC cabling in the drop ceiling, and change over to conduit in exposed areas?

A6. Fiber MUST be in conduit.

Q7. Are the briefing room walls furred drywall or block?

A7. No

Q8. What is the strand count for the fiber optic cable from the comm rm to the slim panel and from the slim panel to the workstation?

A8. 4 single strand single mode

Q9. Is the fiber OM3, OM4 or SM?

A9. SINGLE MODE

Q10. Fiber Optic Connector type (LC,SC)?

A10. Ends to be discussed after award.

Q11. Do contractors have all attachments shown during site visit?

A11. Yes. All attachments shown are posted on SAM.gov

Q12. Is dedicated power available for receptacles?

A12. Yes. There are slots available in the breaker box in the comm room. Both receptacles can be on the same breaker

Q13. How many communications outlets at the workstation and how many ports?

A13. There will be one communications outlet located as indicated on the diagram with four ports.

Q14. Is the intent to run cables above or below the ceiling, cross the hall from the comm closet?

A14. Above the ceiling.

Q15. How many strands of fiber and what detail other fiber details are specified?

A15. 4 strands single mode. Connectors to be compliant with equipment being installed. 10-foot service loop at both ends of the line are required.

Q16. How many CAT 6 cables?

A16. Four (4) cables; to fill one 1 quad box