This document is a Questions and Answers (Q&A) file for Building 720 Rehabilitation at Fort Bragg, detailing specific requirements for a renovation project. The project involves comprehensive cleaning, including deep cleaning and fumigation of the admin area, with all furniture to be discarded. Specific requirements include reusing or replacing duct diffusers based on condition, cleaning the HVAC system and coils, installing new 2x4 LED panel lights, and painting doors and frames. The work must commence within 14 days of Notice to Proceed (NTP) and be completed within 60 days of award, with specific instructions for cleaning agents, mold treatment, and surface restoration. Additional details cover shower valve replacement, drywall finishing, and guidance on tile preservation during renovations.
The Q&A addresses technical specifics such as cleaning protocols (using manufacturer-specified agents to kill mold and bacteria), lighting specifications consistent with Fort Bragg Directorate of Public Works standards, and flexibility in certain renovation approaches. No plumbing as-built drawings are currently available, and there are no specific lighting requirements for the vault room. The document emphasizes thorough cleaning, surface restoration, and adherence to manufacturer specifications throughout the rehabilitation process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
Questions and Answers for Building 720 Rehab
Q1. Are the duct diffusers being replaced?
A1. If the duct Diffusers can be cleaned and presented as serviceable and are in good appearance, reuse duct diffusers. If they are stained and or non-serviceable (broken) replace in kind with like color. Wipe all grid clean with mild soap.
Q2. Is the HVAC system being replaced?
A2. No. cleaning as specified, in paragraph A.11 in the SOW to include coils and new filters.
Q3. What is meant by the Deep Cleaning Fumigation?
A3. Deep cleaning is intended to be of the carpet and the admin area. The fumigation is intended to be of the admin area only. Fumigation needs to have 100 percent coverage, enveloping all surfaces, including above the ceiling tiles. Use cleaning agents to the manufacture’s specifications Use cleaning agents as directed to get the best results Admin area shall include the vault. Remove all furniture, appliances, wallpaper, and all ceiling tiles before the deep cleaning process. Replace ceiling tiles after execution.
Q4. Are we saving any furniture?
A4. All furniture shall be thrown away. The SOW has been amended in paragraph A.1.
to change “warehouse” to “dumpster”.
Q5. Does painting door frame include doors and frames?
A5. Yes. paint the door and the frame.
Q6. Light bulbs or new or new LED?
A6. The lights are to be changed to 2x4 LED panel lights consistent with replacement bulbs offered by Fort Bragg Directorate of Public Works.
Q7. How quickly does this need to be completed, is there an extension?
A7. 60 days from the award. Work must commence within 14 days of NTP and be completed within 60 days.
Q8. In lieu of bleach agent can a disinfectant designed to kill mold be used?
A8. Yes.
Q9. Will continuous fumigation be required or just used allowed to sit closed for 24 hours and then ventilated for 24 hours?
A9. Allow agent to clean undisturbed for 24 hours or longer IAW manufacture’s specifications.
Q10. Is wiping the existing ceiling grid with disinfectant sufficient cleaning?
A10. Apply cleaning agent to kill all mold bacteria and spores IAW manufacturer’s specifications.
Q11. Is there a plumbing as-built drawing available on this building?
A11. Not at this time. If attainable from Fort Bragg DPW, it will be shared.
Q12. Please provide clarification on skip trowel level 5 finish to drywall under paragraph 8, A Line 8. Is this a knockdown drywall finish?
A12. This is knockdown finish. Level 5 is industry term.
Q13. Are there any requirements to the lighting in the vault room?
A13. No.
Q14. When replacing shower valves there will be removal of tile required. When installing new control valves will we be required to replace the existing tile or can a surface mounted shower system be used to cover the tile area?
A14. Reuse as much tile as possible, a surface mount.
Q15. Please confirm that the 2’ x 4’ LED light fixtures will be lay-in fixtures?
A15. Yes, lay in fixtures.