FA4452-08-R-0002 - Performance Plan Attachment 2

View the file

Other files

File Type Posted
Amendment0003.pdf PDF
PerformanceWorkStatement12-06.pdf PDF
ConformedSolicitationFA4452-08-R-0003-12-06.doc DOC document
Amendment0002.pdf PDF
PerformanceWorkStatement11-26.doc DOC document
FA4452-08-R-0002-Amended26Nov07.pdf PDF
QUESTIONSANDANSWERSFORFA4452-08-R-0002.pdf PDF
Amendment0001.pdf PDF
FA4452-08-R-0002.pdf PDF
AppendixC-AMCForm246.pdf PDF
FA4452-08-R-0002APPENDIXA.pdf PDF
FA4452-08-R-0002PastPerformanceQuestionnaire-Attach3.pdf PDF
AppendixB-AFForm1522.pdf PDF
PerformanceWorkStatement11-14.doc DOC document
ExecutiveSummary-FA4452-08-R0002.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4452-08-R-0002

Attachment 2 – Draft Performance Plan

DRAFT PERFORMANCE PLAN

FOR

FLIGHT ATTENDANT TRAINING

AIRCRAFT EGRESS SIMULATOR TRAINING

Coordination and Review:

Contracting Officer Date

Quality Assurance Personnel (QAP) (Primary) Date

Quality Assurance Personnel (QAP) (Alternate) Date

Contractor Date

REVISION CONTROL

Revision Number Date Remarks

Basic 29 OCT 2007 This is the initial publication of the Flight Attendant Training Aircraft Egress Simulator Training Services Performance Plan.

Attachment 2 Draft Performance Plan

TABLE OF CONTENTS

1.0. PURPOSE

2.0. SERVICE OBJECTIVE

3.0. DESIRED MANAGEMENT RESULTS

4.0. ROLES AND RESPONSIBILITIES OF THE MULTI-FUNCTIONAL TEAM

5.0. STRATEGY, METHODS, AND TOOLS

SERVICE SUMMARY (SS) AND METHOD OF ASSESSMENT

6.0. ASSESSMENT PROCEDURES

7.0. PERFORMANCE ISSUES

8.0. CERTIFICATION/ACCEPTANCE OF SERVICES

9.0. CONTRACT MANAGEMENT

SECTION 1.0.

1.0. PURPOSE

1.1 This performance plan has been developed to provide an effective and systematic method to evaluate contractor provided services as required by the terms and conditions of the contract. This performance plan implements the requirements of Air Force Instruction (AFI) 63-124, Performance Based Service Acquisitions (PBSA), with respect to the Government’s quality assurance requirements.

2.0. SERVICE OBJECTIVE

2.1. The objective(s) is to obtain technical support services in support of Air Mobility Command (AMC)Flight Attendant Training Aircraft Egress Simulator Training Services. The contractor will provide business-engineering, design, architectural, technical, and analytical services required to implement the migration of AMC system requirements into a single enterprise solution. This plan is designed to provide an effective systematic surveillance method to validate contractor performance of PWS objectives. The premise of commercial contracting is for the Contractor to assume responsibility for the work they produce. The contractor is responsible for accomplishing quality checks to ensure that final deliverables meet all PWS requirements, to include corrective actions in the event of defects.

3.0. DESIRED MANAGEMENT RESULTS

3.1. The results the Multi-functional team (MFT) is striving to achieve while fulfilling this objective is to provide the most efficient means possible of executing the contract terms and conditions while constantly improving customer service to the Government.

4.0. ROLES AND RESPONSIBILITIES OF THE MULTI-FUNCTIONAL TEAM

4.1. The multi-functional team members listed on the cover are responsible for planning the acquisition and managing the requirements over the life of the contract.

They are responsible for the duties listed below and IAW AFI 63-124, Chapter 2.

4.2. Administering Contracting Officer/Contract Specialist

4.2.1. Ensures open communication is maintained between all parties, pre- and post-award.

4.2.2. Delegates authority for inspection and/or acceptance to QAP in accordance with the terms and conditions of the contract.

4.2.3. Informs the contractor of the names, duties, and limitations of authority for all QAP assigned to the contract.

4.2.4. Periodically assesses the QAPs performance, not less than quarterly.

4.2.5. Manages contractor performance assessment data, including submitting Contractor Performance Assessment Reporting System (CPARS) reports.

4.2.6. Issues contract modifications as necessary.

4.2.7. Takes appropriate action should unacceptable contract

performance occur.

4.3. Quality Assurance Personnel (QAP).

4.3.1. Each QAP must receive Phase 1 & 2 training provided by the contracting office before they can perform contractor surveillance.

4.3.2. Develops technical requirements and independent cost/

Government estimates for contract services.

4.3.3. Evaluates and documents the contractor’s performance in accordance with the procedures set forth in this performance plan.

4.3.4. Immediately notifies the administering contracting officer of any significant performance deficiencies.

4.3.5. Maintains assessment documentation throughout the life of the contract.

4.3.6. Uses assessment data to assist the administering contracting officer in the preparation of the Contractor Performance Assessment Reporting System (CPARS) reports.

4.3.7. Certifies acceptance of services and maintains invoices documentation for the life of the contract.

4.3.8. Promotes business decisions to meet customer requirements by researching the marketplace to remain current with the most efficient and effective performance assessment methods and techniques. Performs market research throughout the life of the requirement to ensure the team is knowledgeable of the commercial marketplace.

4.3.9. Fosters partnerships with industry to ensure exchanges of information with the service industry and other business experts.

4.3.10. Identifies opportunities to improve performance throughout the life of the contract, including benchmarking against industry, identifying initiatives, assessing the risk associated with these initiatives, using the performance plan for implementing initiatives brought forward, and monitoring the success of implementation.

4.3.11. Recommends any changes necessary to the contract, PWS, performance plan, or other requirements to provide more effective operations or eliminate unnecessary costs.

4.3.12. The QAP must keep the documentation files during the term of the contract and at the conclusion of the contract transfer the files to the administering contracting officer for inclusion in the official contract file.

4.4. Contractor who provides service upon award of the contract.

4.4.1. Complies fully with the terms and conditions of the contract.

4.4.2. Participates as a member of the multi-functional team in the post award management phase.

4.4.3. Maintains and implements their commercial quality procedures to ensure contract requirements are met.

4.4.4. Ensures that non-conforming contract services are identified, and corrected. Ensures that their quality control procedures are revised to prevent recurrence.

4.4.5. Tenders to the Government for acceptance only those services that conform to contract requirements.

4.4.6. Recommends any changes to the contract that will provide more effective operations or eliminate unnecessary costs.

5.0. STRATEGY, METHODS, AND TOOLS

5.1. Strategy.

Government quality assurance personnel will perform surveillance (see paragraph 5.3, tools, assessment table) to determine the contractor’s compliance with designated performance requirements of the contract. Documentation is required to record, evaluate, and report contractor’s performance. This assessment will be done on an annual basis after completion of the performance period through the Contract Performance Assessment Reports System (CPARS) evaluation.

5.2. Methods. Definitions of surveillance methods:

5.2.1. Customer Complaint. The QAP shall ensure complaint procedures and forms are made available to all customers (https://www.safaq.hq.af.mil/contracting/affars/5353/library-5353.html - Sample:

Customer Complaint Record or Corrective Action Report Forms). Any personnel that observe questionable or incomplete services or services not performed, or performed improperly, should immediately contact the QAP. QAP shall receive, document, and validate or invalidate all complaints. If the complaint is invalid, the QAP shall contact the complainant and explain why the complaint was invalid. QAP shall fully document the resolution for each complaint on the Customer Complaint Record. Complaints will be tracked and if the performance threshold is exceeded, the QAP shall notify the administering contracting officer in writing. The administering contracting officer will notify the contractor and appropriate action can be taken.

5.2.2. Periodic Surveillance or Random Sampling. The results of the random inspection will determine the government’s next course of action. For example, if performance is marginal or unsatisfactory, the QAP needs to document that inspection finding and begin corrective action. If performance is acceptable, the QAP needs to document this finding as well and may reduce the sample size or sampling frequency.

5.2.3. One Hundred-Percent Inspection. This surveillance type is preferred for those tasks that occur infrequently. It is also used frequently for those tasks having very stringent performance requirements. When this type of surveillance is used, the QAP must inspect and evaluate the contractor’s performance each time it is performed to determine acceptability.

5.2.4. Third Party Audit. Third Party Audits will be conducted by federal, state, and local agencies (i.e. OSHA, DMV, EPA, Environmental Management etc.)

5.3. Tools.

5.3.1. Assessment of SS Items. The PWS contains a Service Summary (SS) that summarizes performance thresholds. The SS does not identify every service required, but only those services considered most important for mission accomplishment.

SERVICE SUMMARY (SS) AND METHOD OF ASSESSMENT

Performance Objective

PWS

Para.

Performance Threshold

Method of Assessment

Provide training, material, equipment and facilities which meets objectives, content, and duration of each course as set forth in the course outline.

1.2.1 Course content and

presentation adequate 100% of the time to enable students to obtain professional FA training. HQ

AMC/A3TA

Customer Complaint along with 100% Student Course Critique Inspection upon submission to verify training content.

Provide mock drills on simulator equipment.

1.2.8 Simulator equipment

adequate 98% of the time to perform mock drills that are realistic to each specific aircraft

Customer Complaint along with 100% Student Course Critique Inspection upon submission to verify training content.

Provide qualified instructors 1.2.12 HQ AMC/A3TA shall receive no more than 1 valid complaint concerning quality of instruction during a training session quarter.

Customer Complaint along with 100% Student Course Critique Inspection upon submission to verify training content.

5.3.2. Assessment of non-SS Items. The government has the right to inspect all services called for by the contract, to the extent practicable at all times and places during the term of the contract. Therefore, QAP have the right to conduct assessment for SS items and non-SS items as well. When the QAP identifies unacceptable performance on non-SS items, the QAP shall follow the procedures in Paragraph 7.0 of this performance plan, entitled Performance Issues.

6.0. ASSESSMENT PROCEDURES

6.1. Assessment Schedule. The QAP will accomplish performance assessment on an annual basis, after completion of the performance period, through the Contract Performance Assessment Reports System (CPARS) evaluation.

7.0. PERFORMANCE ISSUES

7.1. Unacceptable Performance – Government Action. When the contractor’s performance is deemed unacceptable, the QAP will determine the cause of the unacceptable performance. If any Government action, or lack of action, caused or contributed to the unacceptable performance, the unacceptable performance will not be counted against the contractor. The QAP will take action to ensure Government action, or lack of action, does not interfere with the Contractor’s performance in the future. The QAP will completely document the circumstance.

7.2. Unacceptable Performance – Contractor Action. When the unacceptable performance is not the result of Government action, or lack of action, the QAP shall promptly notify the contractor and the contracting officer administering the contract. The contractor shall re-perform the service, if possible, without additional cost to the Government. If the contractor challenges the validity of the QAP’s unacceptable assessment finding, the matter shall be referred to the contracting officer administering the contract for resolution. The QAP will completely document the circumstance.

7.3. Contracting Officer Notification.

7.3.1. Major Finding. If at any time the QAP identifies a condition as having a significant adverse effect on the quality of the activity, such as those stated below, QAP shall document their findings and notify the administering contracting officer immediately in writing. Email is acceptable.

7.3.1.1. Contractor failure to meet a Performance Objective.

7.3.1.2. Failure to provide adequate corrective action to preclude reoccurrence of Government identified findings.

7.3.1.3. Failure to provide corrective action to deficiencies identified by the QAP within a prescribed suspense period.

7.3.1.4. Any failure to adhere to security regulations that results in a security incident.

7.4. Minor Finding. A minor finding is a departure from established standards having little bearing on the service provided. When the QAP identifies a minor finding, the QAP shall document the finding, but is not required to notify the administering contracting officer. However, if the same minor finding is identified more than once, it may be an indication that a major finding is occurring or has occurred because the Contractor has not taken proper steps to prevent recurrence. In this case, the QAP shall notify the administering contracting officer in writing.

7.5. Remedies or Other Actions for Unacceptable Performance. In accordance with the contract Inspection of Services clause 52.246-6 -- Inspection – Time-and- Material and Labor-Hour (May 2001), if any of the services do not conform to contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements. If the contractor fails to proceed with reasonable promptness to perform required replacement or correction, and if the replacement or correction can be performed within the ceiling price, the Government may:

7.5.1. By contract or otherwise, perform the replacement or correction, charge to the Contractor any increased cost, or deduct such increased cost from any amounts paid or due under the contract. Negotiate consideration due the government for non-performance. Consideration may include reducing the contract price to reflect the reduced value of the services performed (reduce the number of paid hours to reflect the total non-performance period). However, other forms of consideration may also be negotiated based on the impact associated with the failure to perform.

7.5.2. Terminate the contract for default.

7.5.3. The Government may at any time require the Contractor to remedy by correction or replacement, without cost to the Government, any failure by the Contractor to comply with the requirements of this contract, if the failure is due to --

7.5.3.1. Fraud, lack of good faith, or willful misconduct on the part of the Contractor’s managerial personnel; or

7.5.3.2. The conduct of one or more of the Contractor’s employees selected or retained by the Contractor after any of the Contractor’s managerial personnel has reasonable grounds to believe that the employee is habitually careless or unqualified.

8.0. CERTIFICATION/ACCEPTANCE OF SERVICES

8.1. The QAP will certify that acceptable services were received, in accordance with the terms and conditions of the contract. The QAP will certify receipt of contractor services via the Wide Area Workflow (WAWF) website. Certification of services shall be accomplished no later than six days after the receipt of the invoice. To avoid payment of interest penalties. If the invoice is not acceptable, it should be rejected in WAWF before the 7th day after receipt of the invoice and the administering contracting officer should be notified immediately.

8.2. The QAP is responsible for obtaining, scheduling, and completing WAWF training from the base Accounting and Finance Office.

9.0. CONTRACT MANAGEMENT

9.1. The multi-functional team shall conduct periodic progress meetings, not less than semi-annually, to review the contractor’s performance. At these meetings the administering contracting officer will apprise the contractor of how the Government views the contractor’s performance and the contractor will apprise the Government of problems, if any, being experienced. The contractor will also notify the administering contracting officer of any work being performed, if any, that the contractor considers over and above the requirements of the contract. Appropriate action shall be taken to resolve any outstanding issues.