This is a Request for Information (RFI) form document containing clarifications and responses regarding a barricade delivery and installation requirement for Travis Air Force Base. The RFI addresses questions submitted by potential contractors regarding the Statement of Work (SOW) for the Air Show Fences/Barricades project supporting the 2026 Wings Over Solano Airshow. Key clarifications provided include: the government will supply a map for drop-off and pick-up locations with specified available dates; the contractor is solely responsible for delivering and picking up approximately 14,600 linear feet of interlocking bicycle rack-style barricades (minimum 42 inches high), including providing their own forklift support at both delivery and removal; the government will not provide loading, unloading, or forklift assistance but will have personnel on-site to answer questions and direct placement; and a map showing desired barricade placement will be provided, though on-site forklift assistance will not be available.
The underlying solicitation (FA442726Q1022) issued by the 60th Civil Engineer Squadron requires contractor delivery by April 21, 2026, and removal by April 27, 2026, with all associated labor, materials, equipment, and transportation provided by the contractor in accordance with base security and safety requirements. The original RFQ closing date of February 12, 2026, was extended to February 16, 2026, via Amendment 2, which also provided RFI answers and location maps. Questions were due by February 9, 2026, at 12:00 PM PST.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Project Title: Project Title: Air show / Barricades - Fences Travis Air Force Base, CA INSTRUCTIONS: Please complete this form if your firm has questions concerning any aspect of the application process. All questions must be submitted to the Contracting Officer by RFI due date. Specify the page, section, and paragraph number(s) pertaining to your question.
Late inquiries/questions may not be entertained.
| Document | Questions | Responses |
| SOW | Could you provide a definitive drop and pick up location and when to expect the barricades to be available for pickup | Map for drop and pick up location is attached. |
| SOW | I just wanted to clarify that we would only be delivering and picking up the barricades. | Yes, contractor would be responsible for delivering and picking up barricades. This includes providing their own forklift support on both ends. Our team cannot provide forklift support. |
| SOW | Would you be responsible for unloading upon delivery and loading upon pick-up, as well as install and take down. | Our team will not be responsible for loading or unloading barriers. We will have someone present when the delivery is scheduled to assist with questions or concerns as well as directing placement. |
| SOW | Could you please provide a layout or map showing the desired barricade placement? Additionally, will on-site assistance and a forklift be available for delivery and removal? | Map will be attached. We cannot assist with forklift support. |
| SOW | Is there a specific minimum height for the barricade | Minimum 42" high, interlocking bicycle rack style barricade |