Travis Bldg 549 Asbestos Survey Report.pdf
PDF 1 MB Posted
- Attached to
- B549 Integrated Prevention Office LVT - AMENDED 4 Federal contract opportunity
- Solicitation number
- FA442723Q0010
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI 1.pdf | ||
| FA4427-23-Q-0010 Combo Amendment 3.pdf | ||
| 22-2755 - Travis Bldg 549.pdf | ||
| Site Visit Q and A.docx | DOCX document | |
| FA4427-23-Q-0010 Combo Amendment 1.pdf | ||
| SOW Integrated Prevention Office LVT.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
554 Morning Glory Drive, Benicia, CA 94510· (707) 745-1137· http://www.acs-ltd.us
AMERICAN COMPLIANCE SERVICES, LTD
LIMITED ASBESTOS SURVEY
TRAVIS AIR FORCE BASE
BUILDING 549 – STAIRS & ENTRY WAY
PREPARED FOR:
Ms. Valentina Langill
CA 9453560 CES/CEOES
241 V Street, Bldg. 878 Travis AFB, CA 94535
PREPARED BY:
American Compliance Services, LTD
554 Morning Glory Drive Benicia, CA 94510
DATE PREPARED:
November 14, 2022
Contents
SECTION I EXECUTIVE SUMMARY
SECTION II SCOPE OF WORK
SECTION III DEFINITIONS
ASBESTOS
SECTION IV ASBESTOS INSPECTION RESULTS & FINDINGS
Table 1 - Asbestos Table
SECTION V METHODS
SECTION VI LIMITATION AND EXCLUSIONS
SECTION VII NOTICE, PERMITS, AND LICENSES
SECTION VIII LIMITATION AND EXCLUSIONS
SECTION IX TECHNICAL STAFF SIGNATURES
Attachments Sample Location Map(s) Laboratory Results Consultants’ Certification(s)
Limited Asbestos Survey Travis Air Force Base Building 549 - Stairs & Entry Way Travis, California Page 1 of 6
SECTION I EXECUTIVE SUMMARY
On November 9, 2022, American Compliance Services, LTD (ACS) conducted a limited asbestos survey of the stairs & entry way in Building 380B, at Travis Air Force Base, in Travis, California.
David Kummer and Sofia Kummer, Asbestos Certified Site Surveillance Technicians (CSSTs) conducted the survey.
SECTION II SCOPE OF WORK
The purpose of this survey was to test the drywall, flooring and ceiling for asbestos prior to disturbance of the material. Should the final construction plans change and require penetration into materials not included in this report, additional sampling and analysis will be required at this site.
SECTION III DEFINITIONS
ASBESTOS
A material is considered by the EPA and the State of California to be an Asbestos Containing Material (ACM) if at least one sample collected from the homogeneous area shows asbestos present in an amount greater than one percent (>1%) https://www.dir.ca.gov/title8/ch3_2sb2a2_5.html. California Code of Regulations (CCR) 1529 defines Asbestos Containing Construction Material (ACCM) as materials containing greater than one-tenth of one-percent (0.1) asbestos by weight. Under 1529 CCR, materials containing between 0.1 % and 1 % asbestos are still regulated as “other” operations by this standard. The ACCM designation is applicable only to reporting (user registration, temporary worksite notification, and incident reporting). https://www.dir.ca.gov/title8/1529.html
The removal or disturbance of 100 square feet or more of ACM or ACCM must be performed by a contractor certified by the California Contractor's State License Board to conduct asbestos-related work and/or an employer/contractor registered with the California Division of Occupational Safety and Health (DOSH) to perform asbestos-related work.
OSHA CLASSIFICATIONS
"Class I asbestos work" means activities involving the removal of TSI and surfacing ACM and
PACM.
"Class II asbestos work" means activities involving the removal of ACM which is not thermal system insulation or surfacing material. This includes, but is not limited to, the removal of asbestos-containing wallboard, floor tile and sheeting, roofing and siding shingles, and construction mastics.
"Class III asbestos work" means repair and maintenance operations, where "ACM", including TSI and surfacing ACM and PACM, is likely to be disturbed.
“Class IV asbestos work” means maintenance and custodial activities during which employees contact but do not disturb ACM or PACM and activities to clean up dust, waste and debris resulting from Class I, II, and III activities.
“Disturbance” means activities that disrupt the matrix of ACM or PACM, crumble or pulverize ACM or PACM, or generate visible debris from ACM or PACM. Disturbance includes cutting
Travis, California Page 2 of 6 away small amounts of ACM and PACM, no greater than the amount which can be contained in one standard sized glove bag or waste bag in order to access a building component. In no event shall the amount of ACM or PACM so disturbed exceed that which can be contained in one glove bag or waste bag which shall not exceed 60 inches in length and width.
NESHAP CATEGORIES
Friable Materials (RACM) NESHAP defines a friable ACM as any material containing more than one percent asbestos that when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.
Category I Non-friable NESHAP defines a Category I non-friable ACM as packing, gaskets, resilient floor covering (except sheet flooring products which are considered friable), and asphalt roofing products which contain more than one percent asbestos.
Category II Non-friable NESHAP defines a Category II non-friable ACM as any material, except for a Category I non-friable ACM, which contains more than one- percent asbestos and cannot be reduced to a powder by hand pressure when dry.
SECTION IV ASBESTOS INSPECTION RESULTS & FINDINGS
ACS collected nine (9) asbestos samples from the building for laboratory analysis. EPA guidelines were used to determine the sampling protocol. Asbestos was detected in the flooring under the carpet. The results are summarized in the table below:
Table 1 - Asbestos Table
SAMPLE
NUMBER
MATERIAL
DESCRIPTION
SAMPLE
LOCATION/
HOMOGENEOUS
AREA
NESHAP /
OSHA
CATEGORIES
% ASBESTOS
ESTIMATED
QUANTITY
01-1 01-2 01-3
Texture Drywall System
Stairs & Entry Way
NA
Drywall: ND Taping Compound: ND
Texture: ND Tape: ND Paint: ND
NA
02-4 2x2 Lay in Ceiling Tile
Stairs & Entry Way
NA ND NA
03-5 Carpet/Glue
Flooring Under Carpet
Stairs & Entry Way
CAT I NF
Class II
Carpet Base: ND Carpet Hair: ND
Brown Floor Tile:5% CH Mastic (Black): ND
Adhesive (yellow): ND
See Scope of Work
04-6 Wainscot /
Glue Stairs & Entry
Way
NA
Wainscot: ND Glue: ND
NA
05-7 Stair Tread Stairs & Entry
Way
NA
Stair Tread: ND Glue: ND
Leveling Compound: ND
NA
06-8 4” Black Base
Cove Stairs & Entry
Way
NA
Base Cove: ND Glue: ND
NA
NA: Asbestos classification and estimated quantities are not applicable for non-asbestos containing material; ND: Non-Detect.
Travis, California Page 3 of 6
The Contractor must obtain all building and special permits required for the asbestos abatement work. When removing 100 square or linear feet or greater of asbestos containing material with an asbestos content of greater than one-tenth of one-percent (0.1) asbestos by weight., the work must be performed by an entity that holds a current, valid asbestos handling license issued by the California State Contractor’s Licensing Board (SCLB) and a current valid Certificate of Registration for Asbestos-Related Work issued by the California Department of Industrial Relations-Division of Occupational Safety and Health (DOSH), unless otherwise specified.
SECTION V METHODS
Asbestos Inspection and sampling procedures were performed in general accordance with the guidelines published by the Environmental Protection Agency (EPA) in 40 CFR Part 763 Subpart E, October 30, 1987. The survey consisted of three major activities: visual inspection and physical assessment, sampling, and quantification of building materials.
ASBESTOS BULK SAMPLE ANALYSIS
Micro Analytical Laboratory in Emeryville, California performed the Asbestos analysis. A chain-of-custody form submitted with the bulk samples, documented the possession of the samples from the time they were collected until they were analyzed. The original chain-of-custody accompanied the samples at all times. Custody documentation began at the time the sample was collected and a copy of the chain-of-custody record was retained by each transferor. The laboratory performed the asbestos analysis using the bulk sample for visual observation and slide preparation(s) for microscopic examination and identification. They mounted samples on slides and then analyzed the samples for asbestos (chrysotile, amosite, crocidolite, anthophyllite, and actinolite/tremolite), fibrous non-asbestos constituents (mineral wool, paper, etc.) and non-fibrous constituents. Asbestos was identified by refractive indices, morphology, color, pleochroism, birefringence, extinction characteristics, and signs of elongation. The same characteristics were used to identify the non-asbestos constituents. The microscopist visually estimated relative amounts of each constituent using a stereoscope to determine the volume of each constituent in proportion to the total volume of the sample.
All bulk samples were analyzed by Polarized Light Microscopy (PLM) with dispersion staining as described by the method of the determination of asbestos in bulk insulation, EPA/600/R-93/116, July 1993. This is a standard method of analysis in optical mineralogy and the currently accepted method for the determination of asbestos in bulk samples. A suspect material is immersed in a solution of known refractive index and subjected to illumination by polarized light. The characteristic color displayed enables mineral identification. It should be noted that some ACM might not be accurately identified and/or quantified by PLM. As an example, the original fabrication of vinyl floor tiles routinely involved milling of asbestos fibers to extremely small sizes.
As a result, these fibers may go undetected under the standard polarized light microscopy method. Transmission Electron Microscopy (TEM) is required for a more definitive analysis of these materials.
QUANTIFICATION
The material location maps display the location of the asbestos containing material. Please see the available plans for the quantity of material included in the scope of work.
Travis, California Page 4 of 6
SECTION VI LIMITATION AND EXCLUSIONS
American Compliance Services, LTD (ACS), warrants that the findings contained herein have been prepared with the level of care and skill exercised by experienced and knowledgeable environmental consultants who are appropriately licensed or otherwise trained to perform asbestos / lead assessments pursuant to OSHA, as well as state and local agencies, as applicable. Our responsibility is limited to correcting any error or omission. No other liability is included or implied. We did not inspect or sample inaccessible areas such as behind walls or within ductwork and did not dismantle any part of the structure to survey inaccessible areas.
Inaccessible is defined as areas of the building that could not be tested (sampled) without destruction of the structure or a portion of the structure.
Information and opinions presented herein apply to the existing and reasonably foreseeable site conditions at the time of our investigation. They cannot necessarily apply to site changes of which this office is unaware and has not had the opportunity to review. Changes in applicable standards may occur because of new legislation or from the broadening of knowledge. Accordingly, findings of this report may be invalidated wholly, or in part, by changes beyond our control. ACS trusts that the information presented herein provides the data you require. Should you have any questions or comments, please contact ACS. This report, and all available supporting documents and drawings used to prepare the report, have been reviewed by the undersigned, the personnel responsible for this project. The signatory affirms that the Asbestos Investigation documented herein was conducted in substantial conformance with applicable procedures documented in 40 CFR Part 763 – Asbestos, Subpart E – Asbestos Containing Materials in Schools [AHERA, June 24, 1992], and the EPA Guidance Manual “Asbestos Containing Materials in Buildings” (EPA 560/5-85-030a, October, 1985). The investigation by American Compliance Services, LTD, consisted solely of the activities described in this report and is subject to the Exceptions of Assessment, Limitations, and Service Constraints described herein.
SECTION VII NOTICE, PERMITS, AND LICENSES
Hazardous materials removed during the abatement activities shall be disposed of in an approved manner complying with all applicable federal, state, and local regulations. The following notices, permits, and licenses are necessary for asbestos abatement work as of the date of this report.
The Contractor is cautioned to verify these requirements as applicable to the final project scope and confirm that no new requirements exist.
LOCAL AIR QUALITY BOARD NOTIFICATION
Written notification is required to the Local Area Air Quality Management District at least 10 days prior to beginning any work on specified quantities of friable, Regulated Asbestos-Containing Materials (RACM) and / prior to working on ACM using mechanical means or methods that will render the material friable.
CAL-OSHA NOTIFICATION
Written notification to the California Occupational Safety and Health Administration (Cal-OSHA) is required by Cal-OSHA Asbestos Regulations (Title 8, Section 341.9) at least 24 hours prior to beginning any work on asbestos-containing materials.
Prior to the abatement, all employees, contractors, or other parties who may be affected by the abatement must be advised of activities pursuant to Cal-OSHA Asbestos and Lead Regulations (Title 8, Section 1529, Subpart K; Section 1532.1).
Travis, California Page 5 of 6
SECTION VIII LIMITATION AND EXCLUSIONS
American Compliance Services, LTD (ACS), warrants that the findings contained herein have been prepared with the level of care and skill exercised by experienced and knowledgeable environmental consultants who are appropriately licensed or otherwise trained to perform asbestos / lead assessments pursuant to OSHA, as well as state and local agencies, as applicable. Our responsibility is limited to correcting any error or omission. No other liability is included or implied. We did not inspect or sample inaccessible areas such as behind walls or within ductwork and did not dismantle any part of the structure to survey inaccessible areas.
Inaccessible is defined as areas of the building that could not be tested (sampled) without destruction of the structure or a portion of the structure.
Information and opinions presented herein apply to the existing and reasonable foreseeable site conditions at the time of our investigation. They cannot necessarily apply to site changes of which this office is unaware and has not had the opportunity to review. Changes in applicable standards may occur because of new legislation or from the broadening of knowledge. Accordingly, findings of this report may be invalidated wholly, or in part, by changes beyond our control.
ACS trusts that the information presented herein provides the data you require. Should you have any questions or comments, please contact ACS. This report, and all available supporting documents and drawings used to prepare the report, have been reviewed by the undersigned, the personnel responsible for this project. The signatory affirms that the Asbestos Investigation documented herein was conducted in substantial conformance with applicable procedures documented in 40 CFR Part 763 – Asbestos, Subpart E – Asbestos Containing Materials in Schools [AHERA, June 24, 1992], and the EPA Guidance Manual “Asbestos Containing Materials in Buildings” (EPA 560/5-85-030a, October, 1985). The investigation by American Compliance Services, LTD, consisted solely of the activities described in this report and is subject to the Exceptions of Assessment, Limitations, and Service Constraints described herein
Travis, California Page 6 of 6
SECTION IX TECHNICAL STAFF SIGNATURES
CERTIFICATE OF REPORT
The following personnel were responsible for this survey. We (I) certify that information contained herein was collected on the dates recorded and the site described in this report.
Wendy Plank Davis, CAC # 01-2904 Certified Asbestos Consultant, Expires 4/4/2023 CDPH Lead I/A, PD, PM, S Certification # 777 Expires 5/18/2023
Sofia Corona Kummer, CSST # 16-5684 Certified Site Surveillance Technician Expiration Date: 8/17/2023 CDPH Lead Certification# 13599 Expiration Date: 1/20/2023
David Kummer, CSST # 08-4363 Certified Site Surveillance Technician Expires 6/19/2023 CDPH Lead Sampling Technician # 20699 Expires 10/27/2023
SAMPLE LOCATION MAP(S)
2' 9 3
/16
18' 0"
8'
2' 0"
2'
5' 0"
' 0
11' 0"
3'
7' 0"
3'
5' 0"
' 0
01-1
Travis Air Force Base Travis, California
Bldg 549
06-8
05-7
04-6
03-5
02-4
01-3 01-2
Vinyl Floor Tile- Brown Floor Tile:5% CH
LABORATORY RESULTS