SOW DORM 1305 PAINT.pdf
PDF 119 KB Posted
- Solicitation number
- FA442721R0016
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
03 Feb 21
STATEMENT OF WORK
BLDG 1305 INTERIOR PAINT
GENERAL DESCRIPTION:
The contractor shall provide all materials, labor, supervision, and equipment to complete painting for work order listed below. All work shall conform to specifications outlined in the contract, the line item task listing description, and in accordance with (IAW) UFGS 09 90 00, (Paints and coatings), UFC 3-190-06, (Protective coatings and paint).
DESCRIPTION OF WORK: Bldg. 1305 Interior paint
Project No.
W/O # BLDG Description
8694583
Interior paint, x72 rooms, 36000SF
ADDITIONAL REQUIREMENTS:
1. All work areas shall be kept as clean as possible during working hours. Debris will not be allowed to accumulate on work site. All debris will be deposited in an authorized container supplied by the contractor.
2. Working drawings shall provide sufficient detail to provide a clear and complete understanding of the work.
3. Special precautions must be made, as needed, to prevent any potential fire hazard. The fire reporting number is 424-4911 from a base phone or 911 from any commercial phone.
4. The contractor shall challenge any requirements in the scope of work (SOW) which are specifically in violation of the governing code. It is the contractor’s responsibility to comply with the governing code unless the construction representative provides specific documentation to the contrary.
5. The contractor shall ensure installation of all items included in the contract. The contractor shall be accountable for all related costs of items not installed.
6. All work shall be in full compliance with the requirements, spirit, and intent of the base compatibility plan (discussed at the Basic Content Pre-construction meeting and a copy provided by the Contracting Officer) and contract specifications.
7. All exposed and visible surfaces shall be finished and provide an aesthetically pleasing appearance.
8. The contractor shall field verify all drawing measurements and any other supplied information given at the site visit
9. Materials storage and clean up: The contractor’s materials and equipment shall be stored and protected after end of each day. Storage facilities are provided by contractor at an approved
Government location. Clean up and removal of all debris, spoil and waste shall be accomplished at the end of each day’s work. Disposal shall be off base upon completion.
10. Working conditions: Contractor shall perform work in such a manner as to cause minimum interference to facility and surrounding areas utilities: Reasonable quantities of water and electricity will be provided to the contractor without charge. Needed temporary connections shall be installed maintained and removed at the contractors expense.
PERIOD OF PERFORMANCE:
All work orders will be completed in ninety days (90) days after receipt NTP.
| 03 Feb 21 |
| STATEMENT OF WORK |
| BLDG 1305 INTERIOR PAINT |
File details come from the government source that posted it. Updated .