0-6_12-R-0102_LIST OF TASKS - Gas IDIQ - Dec2011.pdf

PDF 30 KB Posted

Attached to
Gas Line Repair and Maintenance
Solicitation number
FA4427-12-R-0102
Issued by

About this file

Task Listings

View the file

Other files

File Type Posted
SF30.pdf PDF
0-2_12-R-0102_ Section B-K.docx DOCX document
REQUEST FOR INFORMATION.pdf PDF
0-2_12-R-0102_ Section B-K.docx DOCX document
0-2_12-R-0102_ Section B-K.docx DOCX document
0-8_12-R-0102_ - Subcontractor Consent Form Master.pdf PDF
0-4_12-R-0102_ Wage Determination Applicability.pdf PDF
0-5_12-R-0102_AF FORM 66.pdf PDF
0-3_12-R-0102_Combined Specifications for Gas IDC.pdf PDF
0-7_12-R-0102_ PPQ.docx DOCX document
0-1_12-R-0102_ Soliciation.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Natural Gas System Repair Travis AFB

Task List - Page 1

LIST OF TASKS

All work under the items listed below shall be accomplished in complete accordance with the contract plans and specifications. Each task includes materials and labor.

0001 Excavate for Pipe and BF 4’: Utility trench excavation for pipe and backfill per section 02316. Includes compacted backfill, and fine grading to match existing grade. Sand bedding is Task # 0008. Price is per cubic yard.

0002 Excavate for Pipe and BF 6’: Utility trench excavation for pipe and backfill per section 02316. Includes compacted backfill, shoring and fine grading to match existing grade. Sand bedding is Task # 0008. Price is per cubic yard.

0003 Excavate for Pipe and BF 8’: Utility trench excavation for pipe and backfill per section 02316. Includes compacted backfill, shoring and fine grading to match existing grade. Sand bedding is Task # 0008. Price is per cubic yard.

0004 Excavate for Pipe and BF 10’: Utility trench excavation for pipe and backfill per section 02316. Includes compacted backfill, shoring and fine grading to match existing grade. Sand bedding is Task # 0008. Price is per cubic yard.

0005 Excavate for Pipe and BF 12’: Utility trench excavation for pipe and backfill per section 02316. Includes compacted backfill, shoring and fine grading to match existing grade. Sand bedding is Task # 0008. Price is per cubic yard.

0006 Flagman: Flagman and signs to traffic control. Price is per hour.

0007 Granular Backfill/Aggregate Base: Select Granular material backfill under pavement or driveways. Includes delivery, placing and compaction. Price per cubic yard.

0008 Sand Bedding: Sand bedding for pipe in a trench. Includes delivery and placing.

Price is per cubic yard.

0009 Haul Excess Clean Spoils On Base. Haul excess clean spoils to on base soils holding area. Up to five mile round trip. Price is per cubic yard.

0010 Haul Excess Clean Spoils off Base: Haul and dispose of excess clean spoils off base. Including hauling broken concrete or asphalt to approved disposal site. This contract does not include any provision for handling or disposal of hazardous waste. Price is per cubic yard.

0011 2” and smaller Gas Pipe: Provide 2" or smaller polyethylene gas pipe in utility trench excavated by another task line item. Includes fittings and labor for connections.

Price is per linear foot.

0012 3” Gas Pipe: Provide 3” polyethylene gas pipe in utility trench excavated by another task line item. Includes fittings and labor for connections. Price is per linear foot.

Task List - Page 2

0013 4” Gas Pipe: Provide 4" polyethylene gas pipe in utility trench excavated by another task line item. Includes fittings and labor for connections. Price is per linear foot.

0014 6” Gas Pipe: Provide 6" polyethylene gas pipe in utility trench excavated by another task line item. Includes fittings and labor for connections. Price is per linear foot.

0015 8” Gas Pipe: Provide 8" polyethylene gas pipe in utility trench excavated by another task line item. Includes fittings and labor for connections. Price is per linear foot.

0016 12” Gas Pipe: Provide 12" polyethylene gas pipe in utility trench excavated by another task line item. Includes fittings and labor for connections. Price is per linear foot.

0017 3/4” Service Line to Building: Connect new 3/4” service line, in an open trench, to an existing building service. Includes fitting and connection to the depressurized source line, connection of new line to existing building service line or riser, removal of existing line to grade and cap the abandoned portion of existing service riser. Price is per each service.

0018 1” Service Line to Building: Connect new 1” service line, in an open trench, to an existing building service. Includes fitting and connection to the depressurized source line, connection of new line to existing building service line or riser, removal of existing line to grade and cap the abandoned portion of existing service riser. Price is per each service.

0019 1 1/4” Service Line to Building: Connect new 1 1/4” service line, in an open trench, to an existing building service. Includes fitting and connection to the depressurized source line, connection of new line to existing building service line or riser, removal of existing line to grade and cap the abandoned portion of existing service riser. Price is per each service.

0020 1.5” Service Line to Building: Connect new 1.5" service line, in an open trench, to an existing building service. Includes fitting and connection to the depressurized source line, connection of new line to existing building service line or riser, removal of existing line to grade and cap the abandoned portion of existing service riser. Price is per each service.

0021 2” Service Line to Building: Connect new 2” service line, in an open trench, to an existing building service. Includes fitting and connection to the depressurized source line, connection of new line to existing building service line or riser, removal of existing line to grade and cap the abandoned portion of existing service riser. Price is per each service.

0022 3” Service Line to Building: Connect new 3” service line, in an open trench, to an existing building service. Includes fitting and connection to the depressurized source line, connection of new line to existing building service line or riser, removal of existing line to grade and cap the abandoned portion of existing service riser. Price is per each service.

0023 4” Service Line to Building: Connect new 4” service line, in an open trench, to an existing building service. Includes fitting and connection to the depressurized source line, Task List - Page 3 connection of new line to existing building service line or riser, removal of existing line to grade and cap the abandoned portion of existing service riser. Price is per each service.

0024 Connect a new gas line to an existing gas line (6” or less): Existing line is depressurized. Includes fittings and labor for connection. Price is per connection.

0025 Connect a new gas line to an existing gas line (8” or greater): Existing line is depressurized. Includes fittings and labor for connection. Price is per connection.

0026 3/4” Regulator: Provide 3/4” service connection shut off and regulator. Includes fittings, valve, regulator, and connection to new or existing service lateral and to building service or meter. Price is per each service connection made.

0027 1” Regulator: Provide 1” service connection shut off and regulator. Includes fittings, valve, regulator, and connection to new or existing service lateral and to building service or meter. Price is per each service connection made.

0028 1 1/4” Regulator: Provide 1 1/4” service connection shut off and regulator.

Includes fittings, valve, regulator, and connection to new or existing service lateral and to building service or meter. Price is per each service connection made.

0029 1.5” Regulator: Provide 1.5” service connection shut off and regulator. Includes fittings, valve, regulator, and connection to new or existing service lateral and to building service or meter. Price is per each service connection made.

0030 2 “ Regulator: Provide 2” service connection shut off and regulator. Includes fittings, valve, regulator, and connection to new or existing service lateral and to building service or meter. Price is per each service connection made.

0031 3/4” Meter: Provide 3/4” service meter. Includes fittings. Price is per each meter installed.

0032 1” Meter: Provide 1” service meter. Includes fittings. Price is per each meter installed.

0033 1 1/4” Meter: Provide 1 1/4 service meter. Includes fittings. Price is per each meter installed.

0034 1.5” Meter: Provide 1.5” service meter. Includes fittings. Price is per each meter installed.

0035 2” Meter: Provide 2” service meter. Includes fittings. Price is per each meter installed.

0036 3/4” Seismic Valve: Provide 3/4” seismic valve. Includes fittings. Price is per each valve installed.

Task List - Page 4

0037 1” Seismic Valve: Provide 1” seismic valve. Includes fittings. Price is per each valve installed.

0038 1 1/4” Seismic Valve: Provide 1 1/4 seismic valve. Includes fittings. Price is per each valve installed.

0039 1.5” Seismic Valve: Provide 1.5” seismic valve. Includes fittings. Price is per each valve installed.

0040 2” Seismic Valve: Provide 2” seismic valve. Includes fittings. Price is per each valve installed.

0041 2” Gas Valve: Provide 2" polyethylene gas valve, complete with valve box and concrete ring. Price is per each valve.

0042 3” Gas Valve: Provide 3" polyethylene gas valve, complete with valve box and concrete ring. Price is per each valve.

0043 4” Gas Valve: Provide 4" polyethylene gas valve, complete with valve box and concrete ring. Price is per each valve.

0044 6” Gas Valve: Provide 6" polyethylene gas valve, complete with valve box and concrete ring. Price is per each valve.

0045 8” Gas Valve: Provide 8" polyethylene gas valve, complete with valve box and concrete ring. Price is per each valve.

0046 12” Gas Valve: Provide 12" polyethylene gas valve, complete with valve box and concrete ring. Price is per each valve.

0047 Sawcut Asphalt Roadway: Sawcut asphalt roadway for utility trench. Nominal depth 4”. Price is per lineal foot.

0048 Sawcut Asphalt Roadway each additional inch: Sawcut asphalt roadway for utility trench. Nominal depth 4”. Price is per lineal foot multiplied by additional depth in inches.

0049 Sawcut Concrete Sidewalk or Driveway 4”: Sawcut concrete sidewalks or driveways. Nominal depth 4 inches. Price is per linear foot.

0050 Sawcut Concrete Sidewalk or Driveway each additional inch: Sawcut concrete sidewalks or driveways. Nominal depth 4 inches. Price is per linear foot multiplied by additional depth in inches.

0051 Sawcut Concrete Curb and Gutter: Sawcut concrete curb and gutter. Typical curbs/gutters on Travis are: concrete swale, rolled gutter, gutter pan, simple rolled curb, square curb, and curb/gutter combo, etc. Sizes may vary. Price is per each.

Task List - Page 5

0052 Asphalt Remove and Replace: Remove asphalt road paving before excavating for utility trench, replace asphalt after trench work is complete. Disposal of removed asphalt is task #0010. Asphalt thickness may vary. Therefore, price is per cubic yard.

0053 Concrete Sidewalks Remove and Replace: Remove concrete sidewalks before excavating for utility trench, replace sidewalks after trench work is complete. Disposal of removed concrete is task #0010. Price is per square yard.

0054 Concrete Driveways Remove and Replace: Remove concrete driveway before excavating for utility trench, replace after trench work is complete. Disposal of removed concrete is task #0010. Price is per square yard.

0055 Concrete Curb and Gutter Remove and Replace: Remove concrete curb and gutter before excavating for utility trench, replace after trench work is complete. Typical curbs/gutters on Travis are: concrete swale, rolled gutter, gutter pan, simple rolled curb, square curb, and curb/gutter combo, etc. Disposal of removed concrete is task #0010.

Thickness varies. Price is per linear foot

0056 Hydroseed: Hydroseed over backfilled trenches accomplished by other tasks. Price is per hundred square feet.

0057 Sod: Sod over backfilled trenches accomplished by other tasks. Price is per square foot.

0058 Tracer Wire And Warning Tape: Provide tracer wire and warning tape for new gas piping in a trench. Price is per linear foot.

0059 Hand Dig Across Pipe: Hand dig across buried pipes or conduits exposed during other excavations.

0060 Unmarked Utility Delay/Irrigation Repair: Delay associated with encountering one unmarked underground utility pipe/conduit crossing pipe trench or repair of damaged irrigation piping cause during excavation. Price is per occurrence.

0061 Cap and abandon old gas line or utility pipe – poly pipe 6’’ or less:

0062 Cap and abandon old gas line or utility pipe – poly pipe 8’’ or greater:

0063 Cap and abandon old gas line or utility pipe – steel pipe 6’’ or less:

0064 Cap and abandon old gas line or utility pipe – steel pipe 8” or greater:

0065 Fencing: Provide temporary six foot chain link fencing with screening. This includes maintenance of fencing, removal and site restoration of area damaged by fencing. Price is per linear foot.

Task List - Page 6

0066 Hot Tap into existing line – poly pipe 6”or less: Hot tap for new service line into existing service line. Includes all fittings, material, equipment and labor for a complete hot tap.

0067 Hot Tap into existing line – poly pipe 8” or greater: Hot tap for new service line into existing service line. Includes all fittings, material, equipment and labor for a complete hot tap.

0068 Hot Tap into existing line – steel pipe 6”or less: Hot tap for new service line into existing service line. Includes all fittings, material, equipment and labor for a complete hot tap.

0069 Hot Tap into existing line – steel pipe 8”or greater: Hot tap for new service line into existing service line. Includes all fittings, material, equipment and labor for a complete hot tap.

0070 Boring for HDPE CNG Gas Line, 2-3 Inch Pipe Boring/Drilling Non-Rocky Soil:

Set-up and removal of equipment, cleanup of site, digging, backfill, labor, materials (excluding pipe and connection to new or existing pipe). Price is per linear foot measured in straight line distance.

0071 Boring for HDPE CNG Gas Line, 4-6 Inch Pipe Boring/Drilling Non-Rocky Soil:

Set-up and removal of equipment, cleanup of site, digging, backfill, labor, materials (excluding pipe and connection to new or existing pipe). Price is per linear foot measured in straight line distance.

0072 Boring for HDPE CNG Gas Line, 8-12 Inch Pipe Boring/Drilling Non-Rocky Soil: Set-up and removal of equipment, cleanup of site, digging, backfill, labor, materials (excluding pipe and connection to new or existing pipe). Price is per linear foot measured in straight line distance.

0073 Landscaping: Relocate landscaping materials (e.g. ginger rock, landscape fabric, vegetation except grass) and restore to pre-existing condtions. Price is per labor hour.

0074 Gas Outage and Notification: Provide manpower and services for gas outage coordination and notification. Notification will include an approved form delivered to each building’s facility manager impacted by the outage. Gas outage shall be planned and scheduled at least two weeks in advance. Notifications must be delivered at three days in advance. Price is per each occurrence.

0075 Excavation Preparations (a.k.a. Dig Permit Process): Prepare and submit request for underground utility identification. Contact respective utility shops to coordinate markings and permitting. New dig permits, maintenance of markings, and renewal of existing dig permits are included. Price is per each dig permit.

END OF TASK LIST