0-1_12-R-0102_ Soliciation.pdf
PDF 1 MB Posted
- Attached to
- Gas Line Repair and Maintenance Federal contract opportunity
- Solicitation number
- FA4427-12-R-0102
About this file
Solicitation Package
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30.pdf | ||
| 0-2_12-R-0102_ Section B-K.docx | DOCX document | |
| REQUEST FOR INFORMATION.pdf | ||
| 0-2_12-R-0102_ Section B-K.docx | DOCX document | |
| 0-8_12-R-0102_ - Subcontractor Consent Form Master.pdf | ||
| 0-4_12-R-0102_ Wage Determination Applicability.pdf | ||
| 0-2_12-R-0102_ Section B-K.docx | DOCX document | |
| 0-5_12-R-0102_AF FORM 66.pdf | ||
| 0-3_12-R-0102_Combined Specifications for Gas IDC.pdf | ||
| 0-7_12-R-0102_ PPQ.docx | DOCX document | |
| 0-6_12-R-0102_LIST OF TASKS - Gas IDIQ - Dec2011.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4427-12-R-0102
PRFA442712R0102
Gas Line Repair and Maintenance - Travis AFB, CA 94535
All correspondence shall be emailed to SSgt J. Ryan Barron (john.barron.3@us.af .mil) Mrs. Marguerite Holbein-Stephenson w ith copy to
(marguerite.holbein-stephenson@us.af .mil) Do not send original unless requested.
This acquisition is Firm Fixed Price HubZone Set-Aside.
Instructions for preparation and submission of the proposal are contained in Section L. Basis of aw ard is located in Section M.
Site visit is scheduled for 21 Aug 12 at 10:00 A.M. Complete information is contained in section L.
Magnitude of construction is betw een $1,000,000 and $5,000,000.
Enter price on schedule B and price book as directed. Failure to comply w ith instructions may result in non-consideration of your proposal.
Point of Contact: SSgt J. Ryan Barron at 707-424-2014 (Contract Specialist) or Mrs. Marguerite Holbein-Stephenson at 707-424-7765
(Contracting Off icer). Facsimile number 707-424-5189.
SSGT RYAN R BARRON 707-424-2014
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
03-Aug-2012
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________365 calendar days af ter receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed of fers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________04 Sep 2012 (date). If this is a sealed bid solicitation, of fers must be publicly opened at that time.
shall be marked to show the of feror's name and address, the solicitation number, and the date and time of fers are due.
B. An of fer guarantee X is, is not required.
C. All of fers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Of fers providing less than _______180 calendar days for Government acceptance af ter the date of fers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse m ust be fully com pleted by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
60 CONS/LGCA
350 HANGAR AVE
ATTN: SSGT BARRON
TRAVIS AFB CA 94535
FA4427
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
01:00 PM (hour)
Sealed envelopes containing of fers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: 707-424-2014 TEL: FAX:
FA4427-12-R-0102 71
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The of feror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this of fer is accepted by the Government in w riting w ithin ________ calendar days af ter the date of fers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The of feror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Y our of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be ful ly completed by offeror)OFFER
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 99 Each IDC Gas Repair & Maintenance
FFP
BASIC PERIOD DATE OF AWARD through 14 July 2013 Delivery/Task Orders will be placed utilizing Price Book Items 0001 Through 0075 to identify work required. Please submit all pricing data IAW Price Book - Basic Period. Contractor will provide all materials, labor, transportation, and equipment. Projects shall include but shall not be limited to the following: Replacement of natural gas lines, valves, fittings, meters, trenching, backfilling, directional boring, asphalt saw cutting and replacement, concrete saw cutting and replacement, purging, cleaning and testing of new lines at Travis AFB, California. It also covers requirements for storage, transportation, disposal and housekeeping activities on the site or location at which these activities are performed. All work shall be performed IAW the
Specifications (Atch #1, dated 8 May 2012). Task listings (Atch #5, dated 01 Jan
2012) applicable to a project.
FOB: Destination
NSN: Z1NZ-12-GAS-IDCR
PURCHASE REQUEST NUMBER: PRFA442712R0102
SIGNAL CODE: A
NET AMT
1001 99 Each OPTION IDC Gas Repair & Maintenance
FFP
OPTION PERIOD ONE 15 July 2013 through 14 July 2014 Delivery/Task Orders will be placed utilizing Price Book Items 1001 Through 1075 to identify work required. Please submit all pricing data IAW Price Book - Basic Period. Contractor will provide all materials, labor, transportation, and equipment. Projects shall include but shall not be limited to the following: Replacement of natural gas lines, valves, fittings, meters, trenching, backfilling, directional boring, asphalt saw cutting and replacement, concrete saw cutting and replacement, purging, cleaning and testing of new lines at Travis AFB, California. It also covers requirements for storage, transportation, disposal and housekeeping activities on the site or location at which these activities are performed. All work shall be performed IAW the
Specifications (Atch #1, dated 8 May 2012). Task listings (Atch #5, dated 01 Jan
2012) applicable to a project.
FOB: Destination
NSN: Z1NZ-12-GAS-IDCR
2001 99 Each OPTION IDC Gas Repair & Maintenance
FFP
OPTION PERIOD TWO 15 July 2014 through 14 July 2015 Delivery/Task order will be placed utilizing Price Book Items 2001 Through 2075 to identify work required. Please submit all pricing data IAW Price Book - Basic Period. Contractor will provide all materials, labor, transportation, and equipment. Projects shall include but shall not be limited to the following: Replacement of natural gas lines, valves, fittings, meters, trenching, backfilling, directional boring, asphalt saw cutting and replacement, concrete saw cutting and replacement, purging, cleaning and testing of new lines at Travis AFB, California. It also covers requirements for storage, transportation, disposal and housekeeping activities on the site or location at which these activities are performed. All work shall be performed IAW the
Specifications (Atch #1, dated 8 May 2012). Task listings (Atch #5, dated 01 Jan
2012) applicable to a project.
FOB: Destination
NSN: Z1NZ-12-GAS-IDCR
3001 99 Each OPTION IDC Gas Repair & Maintenance
FFP
OPTION PERIOD THREE 15 July 2015 through 14 July 2016 Delivery/Task
Orders will be placed utilizing Price Book Items 3001 Through 3075 to identify work required. Please submit all pricing data IAW Price Book - Basic Period.
Contractor will provide all materials, labor, transportation, and equipment. Projects shall include but shall not be limited to the following: Replacement of natural gas lines, valves, fittings, meters, trenching, backfilling, directional boring, asphalt saw cutting and replacement, concrete saw cutting and replacement, purging, cleaning and testing of new lines at Travis AFB, California. It also covers requirements for storage, transportation, disposal and housekeeping activities on the site or location at which these activities are performed. All work shall be performed IAW the
Specifications (Atch #1, dated 8 May 2012). Task listings (Atch #5, dated 01 Jan
2012) applicable to a project.
FOB: Destination
NSN: Z1NZ-12-GAS-IDCR
4001 99 Each OPTION IDC Gas Repair & Maintenance
FFP
OPTION PERIOD FOUR 15 July 2016 through 14 July 2017 Delivery/Task order
Delivery/Task Orders will be placed utilizing Price Book Items 4001 Through 4075 to identify work required. Please submit all pricing data IAW Price Book - Basic
Period. Contractor will provide all materials, labor, transportation, and equipment.
Projects shall include but shall not be limited to the following: Replacement of natural gas lines, valves, fittings, meters, trenching, backfilling, directional boring, asphalt saw cutting and replacement, concrete saw cutting and replacement, purging, cleaning and testing of new lines at Travis AFB, California. It also covers requirements for storage, transportation, disposal and housekeeping activities on the site or location at which these activities are performed. All work shall be performed IAW the Specifications (Atch #1, dated 8 May 2012). Task listings
(Atch #5, dated 01 Jan 2012) applicable to a project.
FOB: Destination
NSN: Z1NZ-12-GAS-IDCR
BASIC PERIOD PRICE BOOK
BASIC PERIOD
BASE PERIOD OR DATE OF AWARD THROUGH 14 JULY 2013 - TO PROVIDE LABOR, TOOLS,
MATERIALS, EQUIPMENT, TRANSPORTATION, AND OTHER NECESSARY ITEMS TO PROVIDE GAS
LINE REPAIR AND MAINTENANCE IAW SPECIFICATION ATTACHED.
LINE
ITEM
DESCRIPTION EST
QTY
UNIT UNIT
PRICE
EST AMT
Excavate for pipe & BF,Compact 4' 1200 CY
Excavate for pipe & BF,Compact 6' 125 CY
Excavate for pipe & BF,Compact 8' 125 CY
Excavate for pipe & BF,Compact 10' 75 CY
Excavate for pipe & BF,Compact 12' 50 CY
Flagman 20 HR
Granular Backfill/Aggregate Base 300 CY
Sand Bedding 250 CY
Haul Excess Clean Spoils to base stockpile 225 CY
Haul Excess Spoils off base 25 CY
0011 2" or less Polyethylene Gas Pipe 1000 LF
0012 3" Polyethylene Gas Pipe 500 LF
0013 4" Polyethylene Gas Pipe 400 LF
0014 6" Polyethylene Gas Pipe 750 LF
0015 8" Polyethylene Gas Pipe 200 LF
0016 12" Polyethylene Gas Pipe 200 LF
0017 3/4" Polyethylene Service Line 20 EA
0018 1" Polyethylene Service Line 18 EA
0019 1-1/4" Polyethylene Service Line 15 EA
0020 1-1/2" Polyethylene Service Line 12 EA
0021 2" Polyethylene Service Line 10 EA
0022 3" Polyethylene Service Line 7 EA
0023 4" Polyethylene Service Line 7 EA
0024 Connect new to existing gas line (6" or less) 12 EA
LINE
ITEM
DESCRIPTION EST
QTY
UNIT UNIT
PRICE
EST AMT
0025 Connect new to existing gas line (8" or greater) 6 EA
0026 3/4" Service, shutoff ®ulator 20 EA
0027 1" Service shutoff & regulator 15 EA
0028 1-1/4" Service, shutoff & regulator 12 EA
0029 1-1/2" Service, shutoff & regulator 10 EA
0030 2" Service, shutoff & regulator 5 EA
0031 3/4" Service Meter 15 EA
0032 1" Service Meter 12 EA
0033 1-1/4" Service Meter 8 EA
0034 1-1/2" Service Meter 5 EA
0035 2" Service Meter 8 EA
0036 3/4" Seismic valve 12 EA
0037 1" Seismic valve 10 EA
0038 1-1/4" Seismic valve 8 EA
0039 1-1/2"Seismic valve 5 EA
0040 2" Seismic valve 12 EA
0041 2" Polyethylene Valve and Box 15 EA
0042 3" Polyethylene Valve and Box 5 EA
0043 4" Polyethylene Valve and Box 5 EA
0044 6" Polyethylene Valve and Box 6 EA
0045 8" Polyethylene Valve and Box 2 EA
0046 12" Polyethylene Valve and Box 2 EA
0047 Sawcut Asphalt Roadway 250 LF
0048 Sawcut Asphalt Roadway each additional inch 60 LF
0049 Sawcut Concrete Sidewalk or Driveway 4" 100 LF
0050 Sawcut Concrete each additional inch 35 LF
0051 Sawcut Curb and Gutter 75 EA
DESCRIPTION EST
QTY
UNIT UNIT
PRICE
0052 Asphalt Road Remove & Replace 30 CY
0053 Concrete Sidewalks Rmv & Rpl 50 SY
0054 Concrete Driveways Rmv & Rpl 50 SY
0055 Concrete Curb and Gutter Rmv & Rpl 20 LF
0056 Hydroseed 150 CSF
0057 Sod 125 SF
0058 Tracer Wire 2500 LF
0059 Hand Dig across Pipe 15 EA
0060 Unmarked Utility Delay 8 EA
0061 Cap abandoned pipe - poly 6" or less 5 EA
0062 Cap abandoned pipe - poly 8" or greater 5 EA
0063 Cap abandoned pipe - steel 6" or less 4 EA
0064 Cap abandoned pipe - steel 8" or greater 4 EA
0065 Fencing 100 LF
0066 Hot Tap - poly pipe 6" or less 4 EA
0067 Hot Tap - poly pipe 8" or greater 4 EA
0068 Hot Tap - steel pipe 6" or less 2 EA
0069 Hot Tap - steel pipe 8" or greater 2 EA
0070 2-3 inch pipe boring / drilling non-rocky soil 200 LF
0071 4-6 inch pipe boring / drilling non-rocky soil 200 LF
0072 8-12 inch pipe boring / drilling non-rocky soil 100 LF
0073 Landscaping 80 HR
0074 Gas Outage/Notification 10 EA
0075 Excavation Preparations (i.e. Dig Permit) 10 EA
ESTIMATED TOTAL AMOUNT (LINE ITEMS 0001 THRU 1075) $_____________________
OPTION PERIOD ONE PRICE BOOK
OPTION PERIOD ONE 15 JULY 2013 THROUGH 14 JULY 2014 - TO PROVIDE LABOR, TOOLS,
LINE REPAIR AND MAINTENANCE IAW SPECIFICATION ATTACHED.
LINE
ITEM
DESCRIPTION EST
QTY
UNIT UNIT
PRICE
1001 Excavate for pipe & BF,Compact 4' 1200 CY
1002 Excavate for pipe & BF,Compact 6' 125 CY
1003 Excavate for pipe & BF,Compact 8' 125 CY
1004 Excavate for pipe & BF,Compact 10' 75 CY
1005 Excavate for pipe & BF,Compact 12' 50 CY
1006 Flagman 20 HR
1007 Granular Backfill/Aggregate Base 300 CY
1008 Sand Bedding 250 CY
1009 Haul Excess Clean Spoils to base stockpile 225 CY
1010 Haul Excess Spoils off base 25 CY
1011 2" or less Polyethylene Gas Pipe 1000 LF
1012 3" Polyethylene Gas Pipe 500 LF
1013 4" Polyethylene Gas Pipe 400 LF
1014 6" Polyethylene Gas Pipe 750 LF
1015 8" Polyethylene Gas Pipe 200 LF
1016 12" Polyethylene Gas Pipe 200 LF
1017 3/4" Polyethylene Service Line 20 EA
1018 1" Polyethylene Service Line 18 EA
1019 1-1/4" Polyethylene Service Line 15 EA
1020 1-1/2" Polyethylene Service Line 12 EA
1021 2" Polyethylene Service Line 10 EA
1022 3" Polyethylene Service Line 7 EA
DESCRIPTION EST
QTY
UNIT UNIT
PRICE
1023 4" Polyethylene Service Line 7 EA
1024 Connect new to existing gas line (6" or less) 12 EA
1025 Connect new to existing gas line (8" or greater) 6 EA
1026 3/4" Service, shutoff ®ulator 20 EA
1027 1" Service shutoff & regulator 15 EA
1028 1-1/4" Service, shutoff & regulator 12 EA
1029 1-1/2" Service, shutoff & regulator 10 EA
1030 2" Service, shutoff & regulator 5 EA
1031 3/4" Service Meter 15 EA
1032 1" Service Meter 12 EA
1033 1-1/4" Service Meter 8 EA
1034 1-1/2" Service Meter 5 EA
1035 2" Service Meter 8 EA
1036 3/4" Seismic valve 12 EA
1037 1" Seismic valve 10 EA
1038 1-1/4" Seismic valve 8 EA
1039 1-1/2"Seismic valve 5 EA
1040 2" Seismic valve 12 EA
1041 2" Polyethylene Valve and Box 15 EA
1042 3" Polyethylene Valve and Box 5 EA
1043 4" Polyethylene Valve and Box 5 EA
1044 6" Polyethylene Valve and Box 6 EA
1045 8" Polyethylene Valve and Box 2 EA
1046 12" Polyethylene Valve and Box 2 EA
1047 Sawcut Asphalt Roadway 250 LF
1048 Sawcut Asphalt Roadway each additional inch 60 LF
1049 Sawcut Concrete Sidewalk or Driveway 4" 100 LF
DESCRIPTION EST
QTY
UNIT UNIT
PRICE
1050 Sawcut Concrete each additional inch 35 LF
1051 Sawcut Curb and Gutter 75 EA
1052 Asphalt Road Remove & Replace 30 CY
1053 Concrete Sidewalks Rmv & Rpl 50 SY
1054 Concrete Driveways Rmv & Rpl 50 SY
1055 Concrete Curb and Gutter Rmv & Rpl 20 LF
1056 Hydroseed 150 CSF
1057 Sod 125 SF
1058 Tracer Wire 2500 LF
1059 Hand Dig across Pipe 15 EA
1060 Unmarked Utility Delay 8 EA
1061 Cap abandoned pipe - poly 6" or less 5 EA
1062 Cap abandoned pipe - poly 8" or greater 5 EA
1063 Cap abandoned pipe - steel 6" or less 4 EA
1064 Cap abandoned pipe - steel 8" or greater 4 EA
1065 Fencing 100 LF
1066 Hot Tap - poly pipe 6" or less 4 EA
1067 Hot Tap - poly pipe 8" or greater 4 EA
1068 Hot Tap - steel pipe 6" or less 2 EA
1069 Hot Tap - steel pipe 8" or greater 2 EA
1070 2-3 inch pipe boring / drilling non-rocky soil 200 LF
1071 4-6 inch pipe boring / drilling non-rocky soil 200 LF
1072 8-12 inch pipe boring / drilling non-rocky soil 100 LF
1073 Landscaping 80 HR
1074 Gas Outage/Notification 10 EA
1075 Excavation Preparations (i.e. Dig Permit) 10 EA
ESTIMATED TOTAL AMOUNT (LINE ITEMS 1001 THRU 1075) $_____________________
ESTIMATED TOTAL CONTRACT AMOUNT (LINE ITEMS 0001 THRU 1075) $_________________
OPTION PERIOD TWO PRICE BOOK
OPTION PERIOD TWO 15 JULY 2014 THROUGH 14 JULY 2015 - TO PROVIDE LABOR, TOOLS,
LINE REPAIR AND MAINTENANCE IAW SPECIFICATION ATTACHED.
LINE
ITEM
DESCRIPTION EST
QTY
UNIT UNIT
PRICE
2001 Excavate for pipe & BF,Compact 4' 1200 CY
2002 Excavate for pipe & BF,Compact 6' 125 CY
2003 Excavate for pipe & BF,Compact 8' 125 CY
2004 Excavate for pipe & BF,Compact 10' 75 CY
2005 Excavate for pipe & BF,Compact 12' 50 CY
2006 Flagman 20 HR
2007 Granular Backfill/Aggregate Base 300 CY
2008 Sand Bedding 250 CY
2009 Haul Excess Clean Spoils to base stockpile 225 CY
2010 Haul Excess Spoils off base 25 CY
2011 2" or less Polyethylene Gas Pipe 1000 LF
2012 3" Polyethylene Gas Pipe 500 LF
2013 4" Polyethylene Gas Pipe 400 LF
2014 6" Polyethylene Gas Pipe 750 LF
2015 8" Polyethylene Gas Pipe 200 LF
2016 12" Polyethylene Gas Pipe 200 LF
2017 3/4" Polyethylene Service Line 20 EA
2018 1" Polyethylene Service Line 18 EA
2019 1-1/4" Polyethylene Service Line 15 EA
2020 1-1/2" Polyethylene Service Line 12 EA
2021 2" Polyethylene Service Line 10 EA
2022 3" Polyethylene Service Line 7 EA
DESCRIPTION EST
QTY
UNIT UNIT
PRICE
2023 4" Polyethylene Service Line 7 EA
2024 Connect new to existing gas line (6" or less) 12 EA
2025 Connect new to existing gas line (8" or greater) 6 EA
2026 3/4" Service, shutoff ®ulator 20 EA
2027 1" Service shutoff & regulator 15 EA
2028 1-1/4" Service, shutoff & regulator 12 EA
2029 1-1/2" Service, shutoff & regulator 10 EA
2030 2" Service, shutoff & regulator 5 EA
2031 3/4" Service Meter 15 EA
2032 1" Service Meter 12 EA
2033 1-1/4" Service Meter 8 EA
2034 1-1/2" Service Meter 5 EA
2035 2" Service Meter 8 EA
2036 3/4" Seismic valve 12 EA
2037 1" Seismic valve 10 EA
2038 1-1/4" Seismic valve 8 EA
2039 1-1/2"Seismic valve 5 EA
2040 2" Seismic valve 12 EA
2041 2" Polyethylene Valve and Box 15 EA
2042 3" Polyethylene Valve and Box 5 EA
2043 4" Polyethylene Valve and Box 5 EA
2044 6" Polyethylene Valve and Box 6 EA
2045 8" Polyethylene Valve and Box 2 EA
2046 12" Polyethylene Valve and Box 2 EA
2047 Sawcut Asphalt Roadway 250 LF
2048 Sawcut Asphalt Roadway each additional inch 60 LF
2049 Sawcut Concrete Sidewalk or Driveway 4" 100 LF
DESCRIPTION EST
QTY
UNIT UNIT
PRICE
2050 Sawcut Concrete each additional inch 35 LF
2051 Sawcut Curb and Gutter 75 EA
2052 Asphalt Road Remove & Replace 30 CY
2053 Concrete Sidewalks Rmv & Rpl 50 SY
2054 Concrete Driveways Rmv & Rpl 50 SY
2055 Concrete Curb and Gutter Rmv & Rpl 20 LF
2056 Hydroseed 150 CSF
2057 Sod 125 SF
2058 Tracer Wire 2500 LF
2059 Hand Dig across Pipe 15 EA
2060 Unmarked Utility Delay 8 EA
2061 Cap abandoned pipe - poly 6" or less 5 EA
2062 Cap abandoned pipe - poly 8" or greater 5 EA
2063 Cap abandoned pipe - steel 6" or less 4 EA
2064 Cap abandoned pipe - steel 8" or greater 4 EA
2065 Fencing 100 LF
2066 Hot Tap - poly pipe 6" or less 4 EA
2067 Hot Tap - poly pipe 8" or greater 4 EA
2068 Hot Tap - steel pipe 6" or less 2 EA
2069 Hot Tap - steel pipe 8" or greater 2 EA
2070 2-3 inch pipe boring / drilling non-rocky soil 200 LF
2071 4-6 inch pipe boring / drilling non-rocky soil 200 LF
2072 8-12 inch pipe boring / drilling non-rocky soil 100 LF
2073 Landscaping 80 HR
2074 Gas Outage/Notification 10 EA
2075 Excavation Preparations (i.e. Dig Permit) 10 EA
ESTIMATED TOTAL AMOUNT (LINE ITEMS 2001 THRU 2075) $_____________________
ESTIMATED TOTAL CONTRACT AMOUNT (LINE ITEMS 0001 THRU 2075) $______________
OPTION PERIOD THREE PRICE BOOK
OPTION PERIOD THREE 15 JULY 2015 THROUGH 14 JULY 2016 - TO PROVIDE LABOR, TOOLS,
LINE REPAIR AND MAINTENANCE IAW SPECIFICATION ATTACHED.
LINE
ITEM
DESCRIPTION EST
QTY
UNIT UNIT
PRICE
3001 Excavate for pipe & BF,Compact 4' 1200 CY
3002 Excavate for pipe & BF,Compact 6' 125 CY
3003 Excavate for pipe & BF,Compact 8' 125 CY
3004 Excavate for pipe & BF,Compact 10' 75 CY
3005 Excavate for pipe & BF,Compact 12' 50 CY
3006 Flagman 20 HR
3007 Granular Backfill/Aggregate Base 300 CY
3008 Sand Bedding 250 CY
3009 Haul Excess Clean Spoils to base stockpile 225 CY
3010 Haul Excess Spoils off base 25 CY
3011 2" or less Polyethylene Gas Pipe 1000 LF
3012 3" Polyethylene Gas Pipe 500 LF
3013 4" Polyethylene Gas Pipe 400 LF
3014 6" Polyethylene Gas Pipe 750 LF
3015 8" Polyethylene Gas Pipe 200 LF
3016 12" Polyethylene Gas Pipe 200 LF
3017 3/4" Polyethylene Service Line 20 EA
3018 1" Polyethylene Service Line 18 EA
3019 1-1/4" Polyethylene Service Line 15 EA
3020 1-1/2" Polyethylene Service Line 12 EA
3021 2" Polyethylene Service Line 10 EA
3022 3" Polyethylene Service Line 7 EA
DESCRIPTION EST
QTY
UNIT UNIT
PRICE
3023 4" Polyethylene Service Line 7 EA
3024 Connect new to existing gas line (6" or less) 12 EA
3025 Connect new to existing gas line (8" or greater) 6 EA
3026 3/4" Service, shutoff ®ulator 20 EA
3027 1" Service shutoff & regulator 15 EA
3028 1-1/4" Service, shutoff & regulator 12 EA
3029 1-1/2" Service, shutoff & regulator 10 EA
3030 2" Service, shutoff & regulator 5 EA
3031 3/4" Service Meter 15 EA
3032 1" Service Meter 12 EA
3033 1-1/4" Service Meter 8 EA
3034 1-1/2" Service Meter 5 EA
3035 2" Service Meter 8 EA
3036 3/4" Seismic valve 12 EA
3037 1" Seismic valve 10 EA
3038 1-1/4" Seismic valve 8 EA
3039 1-1/2"Seismic valve 5 EA
3040 2" Seismic valve 12 EA
3041 2" Polyethylene Valve and Box 15 EA
3042 3" Polyethylene Valve and Box 5 EA
3043 4" Polyethylene Valve and Box 5 EA
3044 6" Polyethylene Valve and Box 6 EA
3045 8" Polyethylene Valve and Box 2 EA
3046 12" Polyethylene Valve and Box 2 EA
3047 Sawcut Asphalt Roadway 250 LF
3048 Sawcut Asphalt Roadway each additional inch 60 LF
3049 Sawcut Concrete Sidewalk or Driveway 4" 100 LF
DESCRIPTION EST
QTY
UNIT UNIT
PRICE
3050 Sawcut Concrete each additional inch 35 LF
3051 Sawcut Curb and Gutter 75 EA
3052 Asphalt Road Remove & Replace 30 CY
3053 Concrete Sidewalks Rmv & Rpl 50 SY
3054 Concrete Driveways Rmv & Rpl 50 SY
3055 Concrete Curb and Gutter Rmv & Rpl 20 LF
3056 Hydroseed 150 CSF
3057 Sod 125 SF
3058 Tracer Wire 2500 LF
3059 Hand Dig across Pipe 15 EA
3060 Unmarked Utility Delay 8 EA
3061 Cap abandoned pipe - poly 6" or less 5 EA
3062 Cap abandoned pipe - poly 8" or greater 5 EA
3063 Cap abandoned pipe - steel 6" or less 4 EA
3064 Cap abandoned pipe - steel 8" or greater 4 EA
3065 Fencing 100 LF
3066 Hot Tap - poly pipe 6" or less 4 EA
3067 Hot Tap - poly pipe 8" or greater 4 EA
3068 Hot Tap - steel pipe 6" or less 2 EA
3069 Hot Tap - steel pipe 8" or greater 2 EA
3070 2-3 inch pipe boring / drilling non-rocky soil 200 LF
3071 4-6 inch pipe boring / drilling non-rocky soil 200 LF
3072 8-12 inch pipe boring / drilling non-rocky soil 100 LF
3073 Landscaping 80 HR
3074 Gas Outage/Notification 10 EA
3075 Excavation Preparations (i.e. Dig Permit) 10 EA
ESTIMATED TOTAL AMOUNT (LINE ITEMS 3001 THRU 3075) $_____________________
ESTIMATED TOTAL CONTRACT AMOUNT (LINE ITEMS 0001 THRU 3075) $______________
OPTION PERIOD FOUR PRICE BOOK
OPTION PERIOD FOUR 15 JULY 2016 THROUGH 14 JULY 2017 - TO PROVIDE LABOR, TOOLS,
LINE REPAIR AND MAINTENANCE IAW SPECIFICATION ATTACHED.
LINE
ITEM
DESCRIPTION EST
QTY
UNIT UNIT
PRICE
4001 Excavate for pipe & BF,Compact 4' 1200 CY
4002 Excavate for pipe & BF,Compact 6' 125 CY
4003 Excavate for pipe & BF,Compact 8' 125 CY
4004 Excavate for pipe & BF,Compact 10' 75 CY
4005 Excavate for pipe & BF,Compact 12' 50 CY
4006 Flagman 20 HR
4007 Granular Backfill/Aggregate Base 300 CY
4008 Sand Bedding 250 CY
4009 Haul Excess Clean Spoils to base stockpile 225 CY
4010 Haul Excess Spoils off base 25 CY
4011 2" or less Polyethylene Gas Pipe 1000 LF
4012 3" Polyethylene Gas Pipe 500 LF
4013 4" Polyethylene Gas Pipe 400 LF
4014 6" Polyethylene Gas Pipe 750 LF
4015 8" Polyethylene Gas Pipe 200 LF
4016 12" Polyethylene Gas Pipe 200 LF
4017 3/4" Polyethylene Service Line 20 EA
4018 1" Polyethylene Service Line 18 EA
4019 1-1/4" Polyethylene Service Line 15 EA
4020 1-1/2" Polyethylene Service Line 12 EA
4021 2" Polyethylene Service Line 10 EA
4022 3" Polyethylene Service Line 7 EA
DESCRIPTION EST
QTY
UNIT UNIT
PRICE
4023 4" Polyethylene Service Line 7 EA
4024 Connect new to existing gas line (6" or less) 12 EA
4025 Connect new to existing gas line (8" or greater) 6 EA
4026 3/4" Service, shutoff ®ulator 20 EA
4027 1" Service shutoff & regulator 15 EA
4028 1-1/4" Service, shutoff & regulator 12 EA
4029 1-1/2" Service, shutoff & regulator 10 EA
4030 2" Service, shutoff & regulator 5 EA
4031 3/4" Service Meter 15 EA
4032 1" Service Meter 12 EA
4033 1-1/4" Service Meter 8 EA
4034 1-1/2" Service Meter 5 EA
4035 2" Service Meter 8 EA
4036 3/4" Seismic valve 12 EA
4037 1" Seismic valve 10 EA
4038 1-1/4" Seismic valve 8 EA
4039 1-1/2"Seismic valve 5 EA
4040 2" Seismic valve 12 EA
4041 2" Polyethylene Valve and Box 15 EA
4042 3" Polyethylene Valve and Box 5 EA
4043 4" Polyethylene Valve and Box 5 EA
4044 6" Polyethylene Valve and Box 6 EA
4045 8" Polyethylene Valve and Box 2 EA
4046 12" Polyethylene Valve and Box 2 EA
4047 Sawcut Asphalt Roadway 250 LF
4048 Sawcut Asphalt Roadway each additional inch 60 LF
4049 Sawcut Concrete Sidewalk or Driveway 4" 100 LF
DESCRIPTION EST
QTY
UNIT UNIT
PRICE
4050 Sawcut Concrete each additional inch 35 LF
4051 Sawcut Curb and Gutter 75 EA
4052 Asphalt Road Remove & Replace 30 CY
4053 Concrete Sidewalks Rmv & Rpl 50 SY
4054 Concrete Driveways Rmv & Rpl 50 SY
4055 Concrete Curb and Gutter Rmv & Rpl 20 LF
4056 Hydroseed 150 CSF
4057 Sod 125 SF
4058 Tracer Wire 2500 LF
4059 Hand Dig across Pipe 15 EA
4060 Unmarked Utility Delay 8 EA
4061 Cap abandoned pipe - poly 6" or less 5 EA
4062 Cap abandoned pipe - poly 8" or greater 5 EA
4063 Cap abandoned pipe - steel 6" or less 4 EA
4064 Cap abandoned pipe - steel 8" or greater 4 EA
4065 Fencing 100 LF
4066 Hot Tap - poly pipe 6" or less 4 EA
4067 Hot Tap - poly pipe 8" or greater 4 EA
4068 Hot Tap - steel pipe 6" or less 2 EA
4069 Hot Tap - steel pipe 8" or greater 2 EA
4070 2-3 inch pipe boring / drilling non-rocky soil 200 LF
4071 4-6 inch pipe boring / drilling non-rocky soil 200 LF
4072 8-12 inch pipe boring / drilling non-rocky soil 100 LF
4073 Landscaping 80 HR
4074 Gas Outage/Notification 10 EA
4075 Excavation Preparations (i.e. Dig Permit) 10 EA
ESTIMATED TOTAL AMOUNT (LINE ITEMS 4001 THRU 4075) $_____________________
ESTIMATED TOTAL CONTRACT AMOUNT (LINE ITEMS 0001 THRU 4075) $______________
SUMMARY OF CLINS
SUMMARY OF TOTALS FOR PRICE BOOK LINE ITEMS
DESCRIPTION AMOUNT
TOTAL BASIC PERIOD CLIN 0001 (PRICE BOOK ITEMS 0001-0075)
TOTAL OPTION PERIOD 1 CLIN 1001 (PRICE BOOK ITEMS 1001-1075)
TOTAL OPTION PERIOD 2 CLIN 2001 (PRICE BOOK ITEMS 2001-2075)
TOTAL OPTION PERIOD 3 CLIN 3001 (PRICE BOOK ITEMS 3001-3075)
TOTAL OPTION PERIOD 4 CLIN 4001 (PRICE BOOK ITEMS 4001-4075)
GRAND TOTAL CLINS 0001 THRU 4075
- Transfer total amounts for each period to CLINS 0001 thru 4001.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
1001 Destination Government Destination Government
2001 Destination Government Destination Government
3001 Destination Government Destination Government
4001 Destination Government Destination Government
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 POP 01-OCT-2012 TO
14-JUL-2013
N/A 60 CES-F3Z345
ALICIA WILDER
411 AIRMAN DRIVE
BLDG 570
TRAVIS AFB CA 94535-2002
424-2029
FOB: Destination
F3Z345
1001 POP 15-JUL-2013 TO
14-JUL-2014
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 15-JUL-2014 TO
14-JUL-2015
N/A (SAME AS PREVIOUS LOCATION)
3001 POP 15-JUL-2015 TO
14-JUL-2016
N/A (SAME AS PREVIOUS LOCATION)
4001 POP 15-JUL-2016 TO
14-JUL-2017
N/A (SAME AS PREVIOUS LOCATION)
CLAUSES INCORPORATED BY REFERENCE
52.247-34 F.O.B. Destination NOV 1991
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the
Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than THE NUMBER OF CALENDER DAYS STATED IN THE INDIVIDUAL TASK
ORDER The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $315.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
EXCLUSION PERIOD
EXCLUSION PERIOD
No work will be required during the period between 1 December through 1 April. During the exclusion period the contractor may begin or continue working if the weather permits and the contractor has made a written request and obtained written approval from the Contracting
Officer. If the contractor intends to continue or begin working during the exclusion period the
Contracting Officer must be notified when working or when not working. The Contracting
Officer has the right to withdraw the approval anytime the weather is not conducive with the work being accomplished. No work shall be accomplished during this period without consent of the Contracting Officer. The 120 calendar days above are excluded from calculations when establishing the estimated completion date.
Section G - Contract Administration Data
WAWF INFO
Section G - Contract Administration Data
1.1 ADMINISTRATIVE MATTERS
The address and telephone number for Construction Flight:
60th Contracting Squadron
60CONS/LGCA
350 Hangar Ave Bldg 549
Travis AFB CA 94535-2632
(707) 424-7749
1.2 CONTRACTOR’S CONTRACT ADMINISTRATION
To Be Completed By The Contractor:
Name and Title:
Responsible Office:
Address:
Telephone Number: Fax No:
Email:
Cage Code: Duns Number: Tax Identification Number:
1.3 INDIVIDUAL(S) AUTHORIZED TO NEGOTIATE OR DISCUSS PROPOSAL
Name of Primary: Name of Alternate:
Position Title: Position Title:
Address: Address:
Telephone #: Telephone #:
Alternate #: Alternate #:
Fax No: Fax No:
Email: Email:
1.4 INVOICES
Individual delivery orders issued against this contract will establish specific invoicing procedures. Wide area work flow (electronic invoicing/payment system) is required for payment under this contract unless specified otherwise.
1.5 WIDE AREA WORK FLOW INSTRUCTIONS
Wide Area Work Flow Receipt and Acceptance (WAWF-RA) Vendor Instructions Installation and Registration
Checklist
Completion of all instructions contained in this checklist must be accomplished prior to activation of the firm and user accounts
1. Check Central Contractor Registration System (CCR) (www.ccr.gov) to see if your company is registered.
If you are registered in CCR, please go to Step 3 below.
For help with registration in CCR, contact the CCR Help desk, 888-227-2423 or e-mail CCR@dlis.dla.mil or see the CCR Handbook at http://www.ccr.gov/handbook.cfm.
2. Register with Central Contractor Registry (CCR).
All vendors desiring to quote on goods or services in support of the Department of
Defense (DoD) must be registered in the CCR at http://www.ccr.gov/.
Ensure that all mandatory fields are completed in your new CCR account (i.e., Telephone/Fax number, Data Universal Numbering System (DUNS) and/or
Commercial and Government Entity (CAGE) codes, North American Industry
Code Systems (NAICS) codes, etc).
Note: All contractors are required to update their CCR registration annually. Failure to do so will result in suspension of the account, which will prevent or delay awarding DoD contracts and payments to your firm.
3. Establish an Electronic Business Point of Contact (EB POC).
The next step is to ensure that you have identified an EB POC for your company. You are required to establish both a primary and alternate EB POC for each CAGE/DUNS code assigned to the firm.
To see if an EB POC is listed for your company, go to http://www.ccr.gov/ and click on ―Search
CCR.‖ Where prompted, enter the DUNS or CAGE or Company Name and click ―Submit Query.‖
If you are presented with a list of DUNS numbers, you will need to pick the specific location and click on the DUNS.
Scroll to the bottom of the Inquiry Results page. There you can see if anyone is listed as the EB
POC. If no one is listed, your company has not identified an EB POC yet. If you see that there is no one listed as your company’s EB POC, you need to click on ―Update or Renew Registrations
Using TPIN‖ to add it.
Each vendor organization may establish up to two EB POC’s (primary and alternate) for each
CAGE/DUNS combination.
The EB POC will be responsible for authorizing access to employee(s) of the vendor’s organization to view and/or modify data submitted on behalf of the vendor.
Update NAICS codes developed by the Census Bureau, which replaced the Standard Industrial
Classification (SIC) codes. Until NAICS codes are updated, update will not be complete. For more info on NAICS codes, visit: http://www.census.gov/epcd/www/naics.html http://www.ccr.gov/ mailto:CCR@dlis.dla.mil http://www.cdr.gov/ http://www.ccr.gov/ http://www.census.gov/epcd/www/naics.html
4. Establish a group in WAWF-RA associated with your cage code(s).
This can be done by calling DISA-Ogden Customer Support at 1-800-392-1798 or by e-mailing cscassig@ogden.disa.mil
5. Determine if your organization will designate a Group Administrator (GAM). (Proceed to paragraph 6 if you are not going to designate a GAM).
In medium to large sized companies, there may be need to establish more than one GAM.
A GAM determines who has access to the WAWF-RA vendor account.
The initial GAM shall be the person designated as the EB POC. To appoint additional GAM’s, each vendor must submit an official appointment letter signed by the EB POC.
The appointment letter should be faxaed to the WAWF-RA Customer Support Center.
The Group Administrator’s Manual is available for reviewing to all WAWF-RA registered users.
The GAM Manual can be found in the Software Users Manual link within the WAWF-RA application.
6. Establish an organizational e-mail address
All records created in WAWF-RA are stored in a virtual file folder and as status is updated or changes, the system generates an e-mail notification to applicable individuals identified in the firm’s organizational e-mail account.
The GAM or EB POC shall provide the organizational e-mail to the WAWF-RA Customer
Support Center.
Ensure that your firm’s organizational e-mail address is operational and can receive e-mail from
WAWF-RA prior to registering your e-mail address with the WAWF-RA Customer Support
Center.
Note: If you do not set up an organizational e-mail address, the personal e-mail address of the first person who self-registers from your firm (CAGE/DUNS code), will be designated as the organizational e-mail address for your firm.
7. Set up PCs to access WAWF-RA
Set up the PCs of your organization’s users to access WAWF-RA.
Select the ―Setting Up Your Machine‖ link on the WAWF-RA home page. For more information:
https://wawf.eb.mil/Instr.html.
8. Have all users self-register on the WAWF-RA website
Every user for your firm must self-register on the WAWF-RA website by completing the on-line registration form.
Select the ―Self Register‖ link on the WAWF-RA home page and follow the instructions.
Users may access WAWF-RA with either a User ID/Password combination or a PKI certificate.
Users who want to use a PKI certificate must obtain it before self-registering.
PKI Certificates may be obtained from one of the approved Interim External Certificate
Authorities: Operation Research Consultants Inc. http://eca.orc.com, Digital Signature Trust Co.
http://www.digsigtrust.com/home.html, or Verisign: http://www.verisign.com. The web sites provide the instructions needed to acquire a PKI Certificate.
If further assistance is needed, contact the WAWF-RA Customer Service Center.
Note: Registrations will not be activated until the WAWF-RA Customer Support Center receives an e-mail from the EB POC/GAM as registered in the CCR database.
9. Follow-Up (If necessary).
If your (GAM or user) account hasn’t been activated within two business days of self-registering contact the WAWF-RA Customer Service Center:CONUS Only: 1-800-392-1798, Option 1
COMMERCIAL: 801-777-3282, Option 1
DSN 777-3282, Option 1
FAX Commercial: 801-605-7453, DSN: 388-7543 mailto:cscassig@ogden.disa.mil https://wawf.eb.mil/Instr.html http://eca.orc.com/ http://www.digsigtrust.com/home.html http://www.verisign.com/
E-Mail: cscassig@ogden.disa.mil
Note: Reference ―WAWF‖ in e-mail Subject line
WIDE AREA WORKFLOW – RECEIPT AND ACCEPTANCE (WAWF-RA)
ELECTRONIC RECEIVING REPORT AND INVOICING INSTRUCTIONS
IN ACCORDANCE WITH DFARS 232.7002, USE OF ELECTRONIC PAYMENT
REQUESTS IS MANDATORY. USE OF WAWF-RA WILL SPEED UP YOUR
PAYMENT PROCESSING TIME AND ALLOW YOU TO MONITOR YOUR
PAYMENT STATUS ONLINE. THERE ARE NO CHARGES OR FEES TO USE
WAWF-RA.
Requests for payments must be submitted electronically via the Internet through the Wide Area Work Flow
– Receipt and Acceptance (WAWF-RA) system at https://wawf.eb.mil.
Questions concerning payment should be directed to the Defense Finance Accounting Services (DFAS)
Omaha at (800) 330-8168 or faxed to (800) 554-0527. Please have your order number and invoice number ready when contacting DFAS about payment status. You can also access payment information using the
DFAS Vendor Pay Inquiry System (VPIS) web site at http://www.dfas.mil/money/vendor.
CODES WILL BE SPECIFIED ON INDIVIDUAL DELIVERY ORDERS AND ARE
REQUIRED TO ROUTE YOUR RECEIVING REPORTS, INVOICES AND ADDITIONAL E-
MAILS CORRECTLY THROUGH WAWF-RA. IMPROPER CODING WILL RESULT IN
REJECTION OF INVOICES.
CONTRACT NUMBER: FA4427-
DELIVERY ORDER
NUMBER:
TYPE OF DOCUMENT: CONSTRUCTION INVOICE
CAGE CODE:
ISSUE BY DODAAC: FA4427
ADMIN DODAAC: FA4427
INSPECTOR DODAAC: F3Z345
SERVICE ACCEPTOR / SHIP
TO:
LOCAL PROCESSING
OFFICE:
N/A
PAY OFFICE DODAAC: F67100
mailto:cscassig@ogden.disa.mil
SEND MORE E-MAIL NOTIFICATIONS:
CONTRACTING OFFICER: John.barron.3@us.af.mil
CONTRACT SPECIALIST: marguerite.holbein-stephenson @us.af.mil
Section H - Special Contract Requirements
AIR FIELD INFORMATION
AIRFIELD INFORMATION
1. Airfield Operations Information:
a) A construction plan that states approximate start of physical work on the airfield shall be accomplished and submitted to the Contracting Officer at the pre-construction meeting for coordination with Airfield Management (60
OSS/OSAA), Communications (60 CS), Ground and Flight Safety (60 AMW/SE), Environmental (60 CES) and
Security Forces (60 SFS). Pre-construction meeting will be 10 days after contract acceptance.
2. Safety Requirements and Procedures:
a) An airfield driving briefing must be administered by Airfield Management prior to the start of any construction project on the airfield. Contact Airfield Management at (707) 424-0028 to set up a time for the briefing.
b) The project superintendent will notify Airfield Management (707) 424-0028/2836 each day prior to starting construction activities and at the end of the day when construction activities have ceased for the day. The work area limits, barricade, and temporary fencing requirements will be clearly delineated for each phase. The work area limits should include identification of restricted areas requiring escorts and free zones with secure areas. Construction vehicle access roads, including access gates and haul routes, will be identified during the pre construction conference. Any temporary pavement marking and lighting details will be presented on the phasing plan. Marking and lighting details are presented in ETL 04-2 Standard Airfield Pavement Marking Schemes, UFC 3-535-01 Visual
Air Navigation Facilities. ETL 04-2 and UFC 3-535-01 will be provided to the contractor by Airfield Management at the pre construction briefing.
c) The following items will be provided at the pre construction briefing:
i. contractor equipment and material storage locations
ii. contractor personnel vehicle parking area and access routes to the work area
iii. location of the contractor's offices and plants, and
iv. designated waste and disposal areas (off-site disposal is included in the specifications).
d) The contractor will provide a listing of all construction equipment that specifies the maximum height of the equipment expected to be in use during construction. If the maximum equipment height penetrates any airspace a
―Notice of Proposed Construction‖ will be required. Based upon information provided in the listing, the government will initiate necessary paperwork to obtain clearance from the Federal Aviation Administration prior to the start of construction. No work will be allowed utilizing the equipment that penetrates airspace until written authorization is given by the contracting officer.
e) Construction activities on the airfield, in proximity to, or affecting aircraft operational areas or navigable airspace, shall be coordinated with airfield management prior to initiating such activities. In addition, basic responsibilities and procedures are required to be briefed prior to the start of any project on the airfield by airfield management. Construction areas located within the aircraft movement area require special attention by the contractor and shall be clearly delineated on the project plans. The airfield manager and contract administrator shall closely monitor construction activity throughout its duration to ensure continual compliance with safety requirements.
REQUIRED INSURANCE
SECTION H Special Contract Requirements
REQUIRED INSURANCE
(IAW FAR 28.306(b)
The Contractor shall, at its own expense, procure and thereafter maintain the following kinds of insurance with respect to performance under the contract.
a. Workmen’s Compensation and Employers Liability Insurance as required by law except that if this contract is to be performed in a State which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such State will be satisfactory. The required Workmen’s Compensation insurance shall extend to cover employer’s liability for accidental bodily injury or death and for occupational disease with a minimum liability limit of $100,000.
b. General Liability Insurance. Bodily injury liability insurance, in the minimum limits of $500,000 per occurrence shall be required on the comprehensive form of policy.
c. Automobile Liability Insurance. This insurance shall be required on the comprehensive form of policy and shall provide bodily injury liability and property damage liability covering the operation of all automobiles used in connection with the performance of the contract. At least the minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage shall be requested.
MAGNITUDE OF CONSTRUCTION: Magnitude of construction IAW FAR 36.204 is between $1,000,000 to
$5,000,000.
PREPARATION OF MATERIAL APPROVAL SUBMITTAL: The submittals contemplated by the clause herein entitled ―FAR 52.236-5, Material and Workmanship‖ in accordance with instruction pertaining to AF Form
3000, ―Material Approval Submittal.‖
PREPARATION OF SCHEDULES FOR CONSTRUCTION CONTRACTS: The reports contemplated by
FAR Clause 52.236-15 entitled ―Schedules for Construction Contracts‖ in Section I shall be accomplished in accordance with instructions pertaining to AF Form 3064, ―Contract Progress Schedule,‖ and AF Form 3065, ―Contract Progress Report.‖
BID BOND
PROPOSAL GUARANTEE (BID BOND)
A bid bond is required for this solicitation in the amount of 20% of the proposed price not to exceed $3 Million. Bid
Bond shall be provided with proposal submission on Standard Form 24 (submit scanned copy with proposal then mail original so that it will arrive prior to closing date/time). Failure to provide a Bid Guarantee may result in your proposal being considered Non-Responsive to the solicitation.
BONDS
SECTION H Special Contract Requirements
PERFORMANCE AND PAYMENT BONDS
The contractor shall submit a Payment Bond on a Standard Form 25-A with a good and sufficient surety and sureties or a Letter of Irrevocable Credit to the Government within ten (10) days of contract award. The contractor, prior to commencement of contract performance, will furnish required payment bonds or irrevocable letter of credit.
The penal sum will be as follows:
(1) PERFORMANCE BOND: The penal sum of the performance bond shall equal 100 percent of the contract price.
(2) PAYMENT BOND: The penal sum of the payment bond shall equal 100 percent of the contract price.
(3) ADDITIONAL BOND PROTECTION: The Government requires additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.
QUESTIONS
QUESTIONS FOR SOLICITATION
All questions relating to the solicitation and/or specifications must be submitted in writing by email to john.barron.3@us.af.mil with a CC to marguerite.holbein-stephenson@us.af.mil at lease ten days prior to the closing date of the solicitation.
1. Security Requirements. Travis Air Force Base is designated as a closed base. In order to promote security and safety, all employees desiring access must adhere to installation entry requirements, to include, identity proofing and vetting. This includes a National Crime
Information Center (NCIC) and California Law Enforcement Telecommunication System
(CLETS) check. Identity proofing and vetting is not required for employees if they have a current favorable government security clearance which can be verified through the Joint
Personnel Adjudication System (JPAS).
2. The primary contractor will ensure all employees possess proper credentials allowing them to work in the United States and ensure illegal aliens are not employed and/or transported onto the installation. At least one of the following forms of identification will be required for identity proofing:
United States Passport
Permanent Registration Card/Alien Registration Receipt Card (Form I-1551)
Foreign Passport with a temporary (I-1551) stamp or temporary (I-1551) printed notation on a machine readable immigrant visa.
Employment authorization document that contains a photograph (Form I-766)
Current/valid Driver’s License
Identification card issued by Federal, State or local Government
U.S. Coast Guard Merchant Mariner Legacy Card
U.S. Coast Guard New Merchant Mariner Credential mailto:john.barron.3@us.af.mil mailto:marguerite.holbein-stephenson@us.af.mil
Additional supplemental sources of identity proofing which may be requested during increased FPCONS or Random Antiterrorism Measures (RAMs) include, but are not limited to:
School identification card with photograph
U.S. Military or draft record
Native American Tribal Document
U.S. Social Security Card issued by the Social Security Administration (SSA)
Certification of Birth Abroad issued by the Department of State (Form FS-545 or Form
DS-1350)
Original or certified copy of a birth certificate issued by a state, county, municipal authority or outlying possession of the United States bearing an official seal
U.S. Citizen ID Cared (Form I-197)
ID Card for use of Resident Citizen in the United States (Form I-179)
Unexpired employment authorization document issued by the Department of Homeland
Security (DHS) which includes, a) Form I-94 identifying the holder as an asylee, or b) other documentation issued by DHS or the former Immigration and Naturalization
Service that identifies the holder as an asylee, lawful permanent resident, refugee or other status authorized to work in the United States incident to status
Foreign Military or Government Identification Credentials
Foreign passport with a current arrival-departure record (Form I-94) bearing the same name as the passport and containing an endorsement of the alien’s nonimmigrant status, if that status authorizes the alien to work for the employer
In the case of a nonimmigrant alien authorized to work for a specific employer incident to status, a foreign passport with Form I-94 or Form I-94A bearing the same name as the passport and containing an endorsement of the alien’s nonimmigrant status, as long as the endorsement has not yet expired and the proposed employment is not in conflict with any restrictions or limitations identified on the form.
The contractor shall not be entitled to any compensation for delays or expenses associated with complying with the…