| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
IDC -Requirements - Base Roof Repair
FFP
BASIC PERIOD 01 MAY 2011 OR DATE OF AWARD thru 30 APR 2012. Delivery/Task Orders will be placed utilizing Price Book Items 0001 through 0034 to identify work required. Contractor to furnish and install all materials, equipment, labor, transportation and supervision in accordance with specifications (Atch #1) dated 30 JUN 2010 and List of Tasking Descriptions (Atch #5) dated 10 JAN 2011.
FOB: Destination
NSN: Z299-10-IDC-ROOF
SIGNAL CODE: A
ESTIMATED
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| OPTION |
| IDC -Requirements - Base Roof Repair |
FFP
OPTION PERIOD ONE 01 MAY 2012 thru 30 APR 2013. Delivery/Task Orders will be placed utilizing Price Book Items 1001 through 1034 to identify work required. Contractor to furnish and install all materials, equipment, labor, transportation and supervision in accordance with specifications (Atch #1) dated 30 JUN 2010 and List of Tasking Descriptions (Atch #5) dated 10 JAN 2011.
FOB: Destination
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| OPTION |
| IDC -Requirements - Base Roof Repair |
FFP
OPTION PERIOD TWO 01 MAY 2013 thru 30 APR 2014. Delivery/Task Orders will be placed utilizing Price Book Items 2001 through 2034 to identify work required. Contractor to furnish and install all materials, equipment, labor, transportation and supervision in accordance with specifications (Atch #1) dated 30 JUN 2010 and List of Tasking Descriptions (Atch #5) dated 10 JAN 2011.
FOB: Destination
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| OPTION |
| IDC -Requirements - Base Roof Repair |
FFP
OPTION PERIOD THREE 01 MAY 2014 thru 30 APR 2015. Delivery/Task Orders will be placed utilizing Price Book Items 3001 through 3034 to identify work required. Contractor to furnish and install all materials, equipment, labor, transportation and supervision in accordance with specifications (Atch #1) dated 30 JUN 2010 and List of Tasking Descriptions (Atch #5) dated 10 JAN 2011.
FOB: Destination
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| OPTION |
| IDC -Requirements - Base Roof Repair |
FFP
OPTION PERIOD FOUR 01 MAY 2015 thru 30 APR 2016. Delivery/Task Orders will be placed utilizing Price Book Items 4001 through 4034 to identify work required. Contractor to furnish and install all materials, equipment, labor, transportation and supervision in accordance with specifications (Atch #1) dated 30 JUN 2010 and List of Tasking Descriptions (Atch #5) dated 10 JAN 2011.
FOB: Destination
ESTIMATED
PRICE BOOK
BASIC PERIOD PRICE BOOK ITEMS FOR CLIN 0001 - 01 MAY 2011 OR DATE OF AWARD THRU 30 APR 2012
Furnish and install all materials, labor, supervision, transportation and equipment necessary to complete roof repairs as identified for each project in strict accordance with the specifications and NCRA roofing and waterproofing manual (latest edition), including painting all exposed wood and sheet metal to match existing for tasks 0001 - 0034.
| ITEM Nos |
| TASK IDENTIFICATION |
| QTY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 0001 |
| Remove existing BUR and provide new 4-ply BUR |
| 0001AA |
| For bldg less than 30 feet high |
| 60 |
| SQ |
| 0001AB |
| For bldg between 30 feet to 60 feet high |
| 30 |
| SQ |
| 0001AC |
| For bldg over 60 feet high |
| 30 |
| SQ |
| 0002 |
| Remove and replace standing seam metal roof (24 GA) with minimum roof slope of 1/2" per foot |
| 0002AA |
| For bldg less than 30 feet high |
| 60 |
| SQ |
| 0002AB |
| For bldg between 30 feet to 60 feet high |
| 30 |
| SQ |
| 0002AC |
| For bldg above 60 feet high |
| 30 |
| SQ |
| 0003 |
| Remove BUR. Replace with modified bituminous roofing |
| 0003AA |
| For bldg less than 30 feet high |
| 60 |
| SQ |
| 0003AB |
| For bldg between 30 feet to 60 feet high |
| 30 |
| SQ |
| 0003AC |
| For bldg above 60 feet high |
| 30 |
| SQ |
| 0004 |
| Remove BUR replace with PVC roofing |
| 0004AA |
| For bldg less than 30 feet high |
| 60 |
| SQ |
| 0004AB |
| For bldg between 30 feet to 60 feet high |
| 30 |
| SQ |
| 0004AC |
| For bldg above 60 feet high |
| 30 |
| SQ |
| 0005 |
| Remove existing, provide new 1-1/2" insulation (two layers of 3/4") over the following substrates: |
| 0006 |
| Remove existing, provide new 2" insulation (two layers of 1") over the following substrates: |
| ITEM Nos |
| TASK IDENTIFICATION |
| QTY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 0007 |
| Remove existing and provide new 4" x 6" galvanized gutter |
| 300 |
| LF |
| 0008 |
| Remove existing and provide new 3" x 4" downspout |
| 300 |
| LF |
| 0009 |
| Remove and replace deteriorated plywood sheathing |
| 0009AA |
| 5/16" to 1/2" |
| 500 |
| SF |
| 0009AB |
| 5/8" to 3/4" |
| 500 |
| SF |
| 0010 |
| Remove and replace gravel stop with cont cleat |
| 600 |
| LF |
| 0011 |
| Remove and replace deteriorated fascia board |
| 600 |
| BF |
| 0012 |
| Raise evaporative cooler and provide new curbs meeting NRCA standard |
| 10 |
| EA |
| 0013 |
| Repair roof drain and provide new strainer, clamping ring and new metal flashing complete |
| 40 |
| EA |
| 0014 |
| Provide new asphalt impregnated walkpad (3’ x 6’ x 1/2”) |
| 300 |
| SF |
| 0015 |
| Provide new expansion joint (up to 8") complete |
| 250 |
| LF |
| 0016 |
| Provide new surface mount metal counter flashing |
| 250 |
| LF |
| 0017 |
| Provide new reglet mounted counter flashing |
| 200 |
| LF |
| 0018 |
| Provide new parapet coping with continue cleat and tapered wood nailer |
| 200 |
| LF |
| 0019 |
| Provide new 18” wide base flashing and cant |
| 600 |
| LF |
| 0020 |
| Extra cost for non-friable asbestos roofing removal |
| 100 |
| SQ |
| 0021 |
| Provide tapered insulation. |
| 2,000 |
| BF |
| 0022 |
| Provide new tubular penetration flashing with hood and draw band |
| 50 |
| EA |
| 0023 |
| Provide new sanitary vent pipe flashing |
| 50 |
| EA |
| 0024 |
| Provide new pitch pan assembly. |
| 40 |
| EA |
| 0025 |
| Remove and replace T&G wood deck |
| 200 |
| BF |
| 0026 |
| Remove and provide 8” high equipment curb |
| 200 |
| LF |
| 0027 |
| Disconnect ducts, pipings and wires to A/C unit; raise A/C unit for BUR installation; provide 8" high wood curb and flashing; reconnect ducts, pipings and wires to A/C unit; provide extension of ducts, piping or wires if necessary to complete the installtion IAW NRCA details, test for proper operation |
| 1000 |
| CF |
| 0028 |
| Remove existing and provide new wood nailer at edge of roof perimeter |
| 400 |
| LF |
| ITEM Nos |
| TASK IDENTIFICATION |
| QTY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 0029 |
| Install plywood decking over the abandoned opening |
| 100 |
| SF |
| 0030 |
| Remove existing Shingle and provide new Shingle roofing |
| 60 |
| SQ |
| 0031 |
| Additional cost for the removal and disposal of the following materials containing lead based paint: |
| 0031AA |
| Gravel Stop |
| 400 |
| LF |
| 0031AD |
| Fascia Board |
| 400 |
| LF |
| 0033 |
| Asbestos Testing |
| 5 |
| EA |
| 0034 |
| Remove and replace metal deck with load capacity of 35 PSF in 5'-0" span |
| 100 |
| SF |
TOTAL ESTIMATED AMOUNT BASIC PERIOD ITEMS 0001 – 0034
(Transfer estimated amount to CONTRACT LINE ITEM NUMBER (CLIN) 0001
PRICE BOOK OPTION 1
OPTION PERIOD ONE (1) PRICE BOOK FOR CLIN 1001 - 01 MAY 2012 THRU 30 APR 2013
Furnish and install all materials, labor, supervision, transportation and equipment necessary to complete roof repairs as identified for each project in strict accordance with the specifications and NCRA roofing and waterproofing manual (latest edition), including painting all exposed wood and sheet metal to match existing for tasks 1001 - 1034.
| ITEM Nos |
| TASK IDENTIFICATION |
| QTY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 1001 |
| Remove existing BUR and provide new 4-ply BUR |
| 1001AA |
| For bldg less than 30 feet high |
| 60 |
| SQ |
| 1001AB |
| For bldg between 30 feet to 60 feet high |
| 30 |
| SQ |
| 1001AC |
| For bldg over 60 feet high |
| 30 |
| SQ |
| 1002 |
| Remove and replace standing seam metal roof (24 GA) with minimum roof slope of 1/2" per foot |
| 1002AA |
| For bldg less than 30 feet high |
| 60 |
| SQ |
| 1002AB |
| For bldg between 30 feet to 60 feet high |
| 30 |
| SQ |
| 1002AC |
| For bldg above 60 feet high |
| 30 |
| SQ |
| 1003 |
| Remove BUR. Replace with modified bituminous roofing |
| 1003AA |
| For bldg less than 30 feet high |
| 60 |
| SQ |
| 1003AB |
| For bldg between 30 feet to 60 feet high |
| 30 |
| SQ |
| 1003AC |
| For bldg above 60 feet high |
| 30 |
| SQ |
| 1004 |
| Remove BUR replace with PVC roofing |
| 1004AA |
| For bldg less than 30 feet high |
| 60 |
| SQ |
| 1004AB |
| For bldg between 30 feet to 60 feet high |
| 30 |
| SQ |
| 1004AC |
| For bldg above 60 feet high |
| 30 |
| SQ |
| 1005 |
| Remove existing, provide new 1-1/2" insulation (two layers of 3/4") over the following substrates: |
| 1006 |
| Remove existing, provide new 2" insulation (two layers of 1") over the following substrates: |
| ITEM Nos |
| TASK IDENTIFICATION |
| QTY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 1007 |
| Remove existing and provide new 4" x 6" galvanized gutter |
| 300 |
| LF |
| 1008 |
| Remove existing and provide new 3" x 4" downspout |
| 300 |
| LF |
| 1009 |
| Remove and replace deteriorated plywood sheathing |
| 1009AA |
| 5/16" to 1/2" |
| 500 |
| SF |
| 1009AB |
| 5/8" to 3/4" |
| 500 |
| SF |
| 1010 |
| Remove and replace gravel stop with cont cleat |
| 600 |
| LF |
| 1011 |
| Remove and replace deteriorated fascia board |
| 600 |
| BF |
| 1012 |
| Raise evaporative cooler and provide new curbs meeting NRCA standard |
| 10 |
| EA |
| 1013 |
| Repair roof drain and provide new strainer, clamping ring and new metal flashing complete |
| 40 |
| EA |
| 1014 |
| Provide new asphalt impregnated walkpad (3’ x 6’ x 1/2”) |
| 300 |
| SF |
| 1015 |
| Provide new expansion joint (up to 8") complete |
| 250 |
| LF |
| 1016 |
| Provide new surface mount metal counter flashing |
| 250 |
| LF |
| 1017 |
| Provide new reglet mounted counter flashing |
| 200 |
| LF |
| 1018 |
| Provide new parapet coping with continue cleat and tapered wood nailer |
| 200 |
| LF |
| 1019 |
| Provide new 18” wide base flashing and cant |
| 600 |
| LF |
| 1020 |
| Extra cost for non-friable asbestos roofing removal |
| 100 |
| SQ |
| 1021 |
| Provide tapered insulation. |
| 2,000 |
| BF |
| 1022 |
| Provide new tubular penetration flashing with hood and draw band |
| 50 |
| EA |
| 1023 |
| Provide new sanitary vent pipe flashing |
| 50 |
| EA |
| 1024 |
| Provide new pitch pan assembly. |
| 40 |
| EA |
| 1025 |
| Remove and replace T&G wood deck |
| 200 |
| BF |
| 1026 |
| Remove and provide 8” high equipment curb |
| 200 |
| LF |
| 1027 |
| Disconnect ducts, pipings and wires to A/C unit; raise A/C unit for BUR installation; provide 8" high wood curb and flashing; reconnect ducts, pipings and wires to A/C unit; provide extension of ducts, piping or wires if necessary to complete the installtion IAW NRCA details, test for proper operation |
| 1,000 |
| CF |
| 1028 |
| Remove existing and provide new wood nailer at edge of roof perimeter |
| 400 |
| LF |
| ITEM Nos |
| TASK IDENTIFICATION |
| QTY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 1029 |
| Install plywood decking over the abandoned opening |
| 100 |
| SF |
| 1030 |
| Remove existing Shingle and provide new Shingle roofing |
| 60 |
| SQ |
| 1031 |
| Additional cost for the removal and disposal of the following materials containing lead based paint: |
| 1031AA |
| Gravel Stop |
| 400 |
| LF |
| 1031AD |
| Fascia Board |
| 400 |
| LF |
| 1033 |
| Asbestos Testing |
| 5 |
| EA |
| 1034 |
| Remove and replace metal deck with load capacity of 35 PSF in 5'-0" span |
| 100 |
| SF |
TOTAL ESTIMATED AMOUNT OPTION YEAR ONE ITEMS 1001 THRU 1034
(Transfer total estimated amount to Contract Line Item Number (CLIN) 1001
PRICE BOOK OPTION 2
OPTION PERIOD TWO (2) PRICE BOOK FOR CLIN 2001 - 01 MAY 2011 THRU 31 MAR 2012
Furnish and install all materials, labor, supervision, transportation and equipment necessary to complete roof repairs as identified for each project in strict accordance with the specifications and NCRA roofing and waterproofing manual (latest edition), including painting all exposed wood and sheet metal to match existing for tasks 2001 - 2034.
| ITEM Nos |
| TASK IDENTIFICATION |
| QTY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 2001 |
| Remove existing BUR and provide new 4-ply BUR |
| 2001AA |
| For bldg less than 30 feet high |
| 60 |
| SQ |
| 2001AB |
| For bldg between 30 feet to 60 feet high |
| 30 |
| SQ |
| 2001AC |
| For bldg over 60 feet high |
| 30 |
| SQ |
| 2002 |
| Remove and replace standing seam metal roof (24 GA) with minimum roof slope of 1/2" per foot |
| 2002AA |
| For bldg less than 30 feet high |
| 60 |
| SQ |
| 2002AB |
| For bldg between 30 feet to 60 feet high |
| 30 |
| SQ |
| 2002AC |
| For bldg above 60 feet high |
| 30 |
| SQ |
| 2003 |
| Remove BUR. Replace with modified bituminous roofing |
| 2003AA |
| For bldg less than 30 feet high |
| 60 |
| SQ |
| 2003AB |
| For bldg between 30 feet to 60 feet high |
| 30 |
| SQ |
| 2003AC |
| For bldg above 60 feet high |
| 30 |
| SQ |
| 2004 |
| Remove BUR replace with PVC roofing |
| 2004AA |
| For bldg less than 30 feet high |
| 60 |
| SQ |
| 2004AB |
| For bldg between 30 feet to 60 feet high |
| 30 |
| SQ |
| 2004AC |
| For bldg above 60 feet high |
| 30 |
| SQ |
| 2005 |
| Remove existing, provide new 1-1/2" insulation (two layers of 3/4") over the following substrates: |
| 2006 |
| Remove existing, provide new 2" insulation (two layers of 1") over the following substrates: |
| ITEM Nos |
| TASK IDENTIFICATION |
| QTY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 2007 |
| Remove existing and provide new 4" x 6" galvanized gutter |
| 300 |
| LF |
| 2008 |
| Remove existing and provide new 3" x 4" downspout |
| 300 |
| LF |
| 2009 |
| Remove and replace deteriorated plywood sheathing |
| 2009AA |
| 5/16" to 1/2" |
| 500 |
| SF |
| 2009AB |
| 5/8" to 3/4" |
| 500 |
| SF |
| 2010 |
| Remove and replace gravel stop with cont cleat |
| 600 |
| LF |
| 2011 |
| Remove and replace deteriorated fascia board |
| 600 |
| BF |
| 2012 |
| Raise evaporative cooler and provide new curbs meeting NRCA standard |
| 10 |
| EA |
| 2013 |
| Repair roof drain and provide new strainer, clamping ring and new metal flashing complete |
| 40 |
| EA |
| 2014 |
| Provide new asphalt impregnated walkpad (3’ x 6’ x 1/2”) |
| 300 |
| SF |
| 2015 |
| Provide new expansion joint (up to 8") complete |
| 250 |
| LF |
| 2016 |
| Provide new surface mount metal counter flashing |
| 250 |
| LF |
| 2017 |
| Provide new reglet mounted counter flashing |
| 200 |
| LF |
| 2018 |
| Provide new parapet coping with continue cleat and tapered wood nailer |
| 200 |
| LF |
| 2019 |
| Provide new 18” wide base flashing and cant |
| 600 |
| LF |
| 2020 |
| Extra cost for non-friable asbestos roofing removal |
| 100 |
| SQ |
| 2021 |
| Provide tapered insulation. |
| 2,000 |
| BF |
| 2022 |
| Provide new tubular penetration flashing with hood and draw band |
| 50 |
| EA |
| 2023 |
| Provide new sanitary vent pipe flashing |
| 50 |
| EA |
| 2024 |
| Provide new pitch pan assembly. |
| 40 |
| EA |
| 2025 |
| Remove and replace T&G wood deck |
| 200 |
| BF |
| 2026 |
| Remove and provide 8” high equipment curb |
| 200 |
| LF |
| 2027 |
| Disconnect ducts, pipings and wires to A/C unit; raise A/C unit for BUR installation; provide 8" high wood curb and flashing; reconnect ducts, pipings and wires to A/C unit; provide extension of ducts, piping or wires if necessary to complete the installtion IAW NRCA details, test for proper operation |
| 1000 |
| CF |
| 2028 |
| Remove existing and provide new wood nailer at edge of roof perimeter |
| 400 |
| LF |
| ITEM Nos |
| TASK IDENTIFICATION |
| QTY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 2029 |
| Install plywood decking over the abandoned opening |
| 100 |
| SF |
| 2030 |
| Remove existing Shingle and provide new Shingle roofing |
| 60 |
| SQ |
| 2031 |
| Additional cost for the removal and disposal of the following materials containing lead based paint: |
| 2031AA |
| Gravel Stop |
| 400 |
| LF |
| 2031AD |
| Fascia Board |
| 400 |
| LF |
| 2033 |
| Asbestos Testing |
| 5 |
| EA |
| 2034 |
| Remove and replace metal deck with load capacity of 35 PSF in 5'-0" span |
| 100 |
| SF |
TOTAL ESTIMATED AMOUNT OPTION PERIOD TWO ITEM Nos 2001 THRU 2034 (Transfer total estimated amount to Contract Line Item Number (CLIN) 2001
PRICE BOOK OPTION 3
OPTION PERIOD THREE (3) PRICE BOOK FOR CLIN 3001 - 01 MAY 2013 THRU 30 APR 2014
Furnish and install all materials, labor, supervision, transportation and equipment necessary to complete roof repairs as identified for each project in strict accordance with the specifications and NCRA roofing and waterproofing manual (latest edition), including painting all exposed wood and sheet metal to match existing for tasks 3001 - 3034.
| ITEM Nos |
| TASK IDENTIFICATION |
| QTY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 3001 |
| Remove existing BUR and provide new 4-ply BUR |
| 3001AA |
| For bldg less than 30 feet high |
| 60 |
| SQ |
| 3001AB |
| For bldg between 30 feet to 60 feet high |
| 30 |
| SQ |
| 3001AC |
| For bldg over 60 feet high |
| 30 |
| SQ |
| 3002 |
| Remove and replace standing seam metal roof (24 GA) with minimum roof slope of 1/2" per foot |
| 3002AA |
| For bldg less than 30 feet high |
| 60 |
| SQ |
| 3002AB |
| For bldg between 30 feet to 60 feet high |
| 30 |
| SQ |
| 3002AC |
| For bldg above 60 feet high |
| 30 |
| SQ |
| 3003 |
| Remove BUR. Replace with modified bituminous roofing |
| 3003AA |
| For bldg less than 30 feet high |
| 60 |
| SQ |
| 3003AB |
| For bldg between 30 feet to 60 feet high |
| 30 |
| SQ |
| 3003AC |
| For bldg above 60 feet high |
| 30 |
| SQ |
| 3004 |
| Remove BUR replace with PVC roofing |
| 3004AA |
| For bldg less than 30 feet high |
| 60 |
| SQ |
| 3004AB |
| For bldg between 30 feet to 60 feet high |
| 30 |
| SQ |
| 3004AC |
| For bldg above 60 feet high |
| 30 |
| SQ |
| 3005 |
| Remove existing, provide new 1-1/2" insulation (two layers of 3/4") over the following substrates: |
| 3006 |
| Remove existing, provide new 2" insulation (two layers of 1") over the following substrates: |
| ITEM Nos |
| TASK IDENTIFICATION |
| QTY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 3007 |
| Remove existing and provide new 4" x 6" galvanized gutter |
| 300 |
| LF |
| 3008 |
| Remove existing and provide new 3" x 4" downspout |
| 300 |
| LF |
| 3009 |
| Remove and replace deteriorated plywood sheathing |
| 3009AA |
| 5/16" to 1/2" |
| 500 |
| SF |
| 3009AB |
| 5/8" to 3/4" |
| 500 |
| SF |
| 3010 |
| Remove and replace gravel stop with cont cleat |
| 600 |
| LF |
| 3011 |
| Remove and replace deteriorated fascia board |
| 600 |
| BF |
| 3012 |
| Raise evaporative cooler and provide new curbs meeting NRCA standard |
| 10 |
| EA |
| 3013 |
| Repair roof drain and provide new strainer, clamping ring and new metal flashing complete |
| 40 |
| EA |
| 3014 |
| Provide new asphalt impregnated walkpad (3’ x 6’ x 1/2”) |
| 300 |
| SF |
| 3015 |
| Provide new expansion joint (up to 8") complete |
| 250 |
| LF |
| 3016 |
| Provide new surface mount metal counter flashing |
| 250 |
| LF |
| 3017 |
| Provide new reglet mounted counter flashing |
| 200 |
| LF |
| 3018 |
| Provide new parapet coping with continue cleat and tapered wood nailer |
| 200 |
| LF |
| 3019 |
| Provide new 18” wide base flashing and cant |
| 600 |
| LF |
| 3020 |
| Extra cost for non-friable asbestos roofing removal |
| 100 |
| SQ |
| 3021 |
| Provide tapered insulation. |
| 2,000 |
| BF |
| 3022 |
| Provide new tubular penetration flashing with hood and draw band |
| 50 |
| EA |
| 3023 |
| Provide new sanitary vent pipe flashing |
| 50 |
| EA |
| 3024 |
| Provide new pitch pan assembly. |
| 40 |
| EA |
| 3025 |
| Remove and replace T&G wood deck |
| 200 |
| BF |
| 3026 |
| Remove and provide 8” high equipment curb |
| 200 |
| LF |
| 3027 |
| Disconnect ducts, pipings and wires to A/C unit; raise A/C unit for BUR installation; provide 8" high wood curb and flashing; reconnect ducts, pipings and wires to A/C unit; provide extension of ducts, piping or wires if necessary to complete the installtion IAW NRCA details, test for proper operation |
| 1000 |
| CF |
| 3028 |
| Remove existing and provide new wood nailer at edge of roof perimeter |
| 400 |
| LF |
| ITEM Nos |
| TASK IDENTIFICATION |
| QTY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 3029 |
| Install plywood decking over the abandoned opening |
| 100 |
| SF |
| 3030 |
| Remove existing Shingle and provide new Shingle roofing |
| 60 |
| SQ |
| 3031 |
| Additional cost for the removal and disposal of the following materials containing lead based paint: |
| 3031AA |
| Gravel Stop |
| 400 |
| LF |
| 3031AD |
| Fascia Board |
| 400 |
| LF |
| 3033 |
| Asbestos Testing |
| 5 |
| EA |
| 3034 |
| Remove and replace metal deck with load capacity of 35 PSF in 5'-0" span |
| 100 |
| SF |
TOTAL ESTIMATED AMOUNT OPTION PERIOD THREE ITEM Nos 3001 THRU 3034 (Transfer total estimated amount to Contract Line Item Number (CLIN) 3001
PRICE BOOK OPTION 4
OPTION PERIOD FOUR (4) PRICE BOOK ITEMS FOR CLIN 4001 - 01 MAY 2014 THRU 30 APR 2015
Furnish and install all materials, labor, supervision, transportation and equipment necessary to complete roof repairs as identified for each project in strict accordance with the specifications and NCRA roofing and waterproofing manual (latest edition), including painting all exposed wood and sheet metal to match existing for tasks 4001 - 4034.
| ITEM Nos |
| TASK IDENTIFICATION |
| QTY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 4001 |
| Remove existing BUR and provide new 4-ply BUR |
| 4001AA |
| For bldg less than 30 feet high |
| 60 |
| SQ |
| 4001AB |
| For bldg between 30 feet to 60 feet high |
| 30 |
| SQ |
| 4001AC |
| For bldg over 60 feet high |
| 30 |
| SQ |
| 4002 |
| Remove and replace standing seam metal roof (24 GA) with minimum roof slope of 1/2" per foot |
| 4002AA |
| For bldg less than 30 feet high |
| 60 |
| SQ |
| 4002AB |
| For bldg between 30 feet to 60 feet high |
| 30 |
| SQ |
| 4002AC |
| For bldg above 60 feet high |
| 30 |
| SQ |
| 4003 |
| Remove BUR. Replace with modified bituminous roofing |
| 4003AA |
| For bldg less than 30 feet high |
| 60 |
| SQ |
| 4003AB |
| For bldg between 30 feet to 60 feet high |
| 30 |
| SQ |
| 4003AC |
| For bldg above 60 feet high |
| 30 |
| SQ |
| 4004 |
| Remove BUR replace with PVC roofing |
| 4004AA |
| For bldg less than 30 feet high |
| 60 |
| SQ |
| 4004AB |
| For bldg between 30 feet to 60 feet high |
| 30 |
| SQ |
| 4004AC |
| For bldg above 60 feet high |
| 30 |
| SQ |
| 4005 |
| Remove existing, provide new 1-1/2" insulation (two layers of 3/4") over the following substrates: |
| 4006 |
| Remove existing, provide new 2" insulation (two layers of 1") over the following substrates: |
| ITEM Nos |
| TASK IDENTIFICATION |
| QTY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 4007 |
| Remove existing and provide new 4" x 6" galvanized gutter |
| 300 |
| LF |
| 4008 |
| Remove existing and provide new 3" x 4" downspout |
| 300 |
| LF |
| 4009 |
| Remove and replace deteriorated plywood sheathing |
| 4009AA |
| 5/16" to 1/2" |
| 500 |
| SF |
| 4009AB |
| 5/8" to 3/4" |
| 500 |
| SF |
| 4010 |
| Remove and replace gravel stop with cont cleat |
| 600 |
| LF |
| 4011 |
| Remove and replace deteriorated fascia board |
| 600 |
| BF |
| 4012 |
| Raise evaporative cooler and provide new curbs meeting NRCA standard |
| 10 |
| EA |
| 4013 |
| Repair roof drain and provide new strainer, clamping ring and new metal flashing complete |
| 40 |
| EA |
| 4014 |
| Provide new asphalt impregnated walkpad (3’ x 6’ x 1/2”) |
| 300 |
| SF |
| 4015 |
| Provide new expansion joint (up to 8") complete |
| 250 |
| LF |
| 4016 |
| Provide new surface mount metal counter flashing |
| 250 |
| LF |
| 4017 |
| Provide new reglet mounted counter flashing |
| 200 |
| LF |
| 4018 |
| Provide new parapet coping with continue cleat and tapered wood nailer |
| 200 |
| LF |
| 4019 |
| Provide new 18” wide base flashing and cant |
| 600 |
| LF |
| 4020 |
| Extra cost for non-friable asbestos roofing removal |
| 100 |
| SQ |
| 4021 |
| Provide tapered insulation. |
| 2,000 |
| BF |
| 4022 |
| Provide new tubular penetration flashing with hood and draw band |
| 50 |
| EA |
| 4023 |
| Provide new sanitary vent pipe flashing |
| 50 |
| EA |
| 4024 |
| Provide new pitch pan assembly. |
| 40 |
| EA |
| 4025 |
| Remove and replace T&G wood deck |
| 200 |
| BF |
| 4026 |
| Remove and provide 8” high equipment curb |
| 200 |
| LF |
| 4027 |
| Disconnect ducts, pipings and wires to A/C unit; raise A/C unit for BUR installation; provide 8" high wood curb and flashing; reconnect ducts, pipings and wires to A/C unit; provide extension of ducts, piping or wires if necessary to complete the installtion IAW NRCA details, test for proper operation |
| 1000 |
| CF |
| 4028 |
| Remove existing and provide new wood nailer at edge of roof perimeter |
| 400 |
| LF |
| ITEM Nos |
| TASK IDENTIFICATION |
| QTY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 4029 |
| Install plywood decking over the abandoned opening |
| 100 |
| SF |
| 4030 |
| Remove existing Shingle and provide new Shingle roofing |
| 60 |
| SQ |
| 4031 |
| Additional cost for the removal and disposal of the following materials containing lead based paint: |
| 4031AA |
| Gravel Stop |
| 400 |
| LF |
| 4031AD |
| Fascia Board |
| 400 |
| LF |
| 4033 |
| Asbestos Testing |
| 5 |
| EA |
| 4034 |
| Remove and replace metal deck with load capacity of 35 PSF in 5'-0" span |
| 100 |
| SF |
TOTAL ESTIMATED AMOUNT OPTION YEAR FOUR ITEM Nos 4001 THRU 4034 (Transfer total amount to Contract Line Item Number (CLIN) 4001
TOTAL SUMMARY OF CLINS
SUMMARY OF TOTAL FOR CLINS
| TOTAL BASIC PERIOD CLIN 0001 (PRICE BOOK ITEMS 0001-0034 |
| $ |
| TOTAL OPTION PERIOD ONE CLIN 1001 (PRICE BOOK ITEMS 1001-1034 |
| $ |
| TOTAL OPTION PERIOD TWO CLIN 2001 (PRICE BOOK ITEMS 2001-2034 |
| $ |
| TOTAL OPTION PERIOD THREE CLIN 3001 (PRICE BOOK ITEMS 3001-3034 |
| $ |
| TOTAL OPTION PERIOD FOUR CLIN 4001 (PRICE BOOK ITEMS 4001-4034 |
| $ |
| GRAND TOTAL CLINS 0001 THRU 4034 |
| $ |
NOTE 1: All extensions of the unit prices shown in the Price Book Items will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to the proposal.
Section G - Contract Administration Data
CLAUSES INCORPORATED BY FULL TEXT
Section G - Contract Administration Data
1.1
ADMINISTRATIVE MATTERS
The address and telephone number for Construction Flight:
60th Contracting Squadron
60CONS/LGCA
350 Hangar Ave Bldg 549
Travis AFB CA 94535-2632
(707) 424-7749
1.2
CONTRACTOR’S CONTRACT ADMINISTRATION
To Be Completed By The Contractor:
Name and Title:
Responsible Office:
Address:
Telephone Number:
Email:
Cage Code:
Duns Number:
Tax Identification Number:
1.3
INDIVIDUAL(S) AUTHORIZED TO NEGOTIATE OR DISCUSS PROPOSAL
Name of Primary:
Name of Alternate:
Telephone #:
Telephone #:
Alternate #:
Alternate #:
Fax No:
Fax No:
Section I - Contract Clauses
CLAUSES INCORPORATED BY FULL TEXT
52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (APR 2009)
(a) Definitions. As used in this clause--
Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.
Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is ``not dominant in its field of operation'' when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.
(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:
(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.
(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.
(3) For long-term contracts--
(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and
(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.
(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code assigned to this contract. The small business size standard corresponding to this NAICS code can be found at http://www.sba.gov/services/contractingopportunities/sizestandardstopics/.
(d) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is 500 employees.
(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the rerepresentation required by paragraph (b) of this clause by validating or updating all its representations in the Online Representations and Certifications Application and its data in the Central Contractor Registration, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause that the data have been validated or updated, and provide the date of the validation or update.
(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.
(g) If the Contractor does not have representations and certifications in ORCA, or does not have a representation in ORCA for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
The Contractor represents that it ( ) is, ( ) is not a small business concern under NAICS Code 238160- assigned to contract number FA4427- (to be completed at time of award).
(Contractor’s Name ) (Signature of Individual Authorized to Sign and Title) (Date)
(End of clause)
52.225-9 BUY AMERICAN ACT—CONSTRUCTION MATERIALS (FEB 2009)
(a) Definitions. As used in this clause--
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is--
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C. App. 1702), such as agricultural products and petroleum products.
Component means an article, material, or supply incorporated directly into a construction material.
Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Domestic construction material means--
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if--
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
Foreign construction material means a construction material other than a domestic construction material.
United States means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the Buy American Act (41 U.S.C. 10a-10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to the construction material or components listed by the Government as follows: NONE
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction material description Unit of measure Quantity Price (dollars) \1\
Item 1
Foreign construction material
Domestic construction material
Item 2
Foreign construction material
Domestic construction material
Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).
List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.
Include other applicable supporting information.
(End of clause)
Section K - Representations, Certifications and Other Statements of Offerors
CLAUSES INCORPORATED BY FULL TEXT
52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2010)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is ----238160.
(2) The small business size standard is ----$14 Million.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)(1) If the clause at 52.204-7, Central Contractor Registration, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the clause at 52.204-7 is not included in this solicitation, and the offeror is currently registered in CCR, and has completed the ORCA electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:
(__) Paragraph (d) applies.
(__) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c)(1) The following representations or certifications in ORCA are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless--
(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the clause at 52.204-7, Central Contractor Registration.
(iv) 52.204-5, Women-Owned Business (Other Than Small Business).This provision applies to solicitations that--
(A) Are not set aside for small business concerns;
(B) Exceed the simplified acquisition threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(v) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(vi) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.
(vii) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(viii) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.
(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.
(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.
(ix) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.
(x) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.
(xi) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.
(xii) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.
(xiii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
(xiv) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA-designated items.
(xv) 52.225-2, Buy American Act Certificate. This provision applies to solicitations containing the clause at 52.225-1.
(xvi) 52.225-4, Buy American Act--Free Trade Agreements—Israeli Trade Act Certificate. (Basic, Alternate I, and Alternate II) This provision applies to solicitations containing the clause at 52.225-3.
(A) If the acquisition value is less than $25,000, the basic provision applies.
(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.
(C) If the acquisition value is $50,000 or more but is less than $67,826, the provision with its Alternate II applies.
(xvii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.
(xviii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.
(xix) 52.225-25, Prohibition on Engaging in Sanctioned Activities Relating to Iran--Certification. This provision applies to all solicitations.
(xx) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to--
(A) Solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions; and
(B) For DoD, NASA, and Coast Guard acquisitions, solicitations that contain the clause at 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns.
(2) The following certifications are applicable as indicated by the Contracting Officer:
(Contracting Officer check as appropriate.)
----(i) 52.219-19, Small Business Concern Representation for the Small Business Competitiveness Demonstration Program.
------(ii) 52.219-21, Small Business Size Representation for Targeted Industry Categories Under the Small Business Competitiveness Demonstration Program.
------(iii) 52.219-22, Small Disadvantaged Business Status.
------(A) Basic.
------(B) Alternate I.
------(iv) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.
------(v) 52.222-48, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment Certification.
------(vi) 52.222-52 Exemption from Application of the Service Contract Act to Contracts for Certain Services--Certification.
------(vii) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA-Designated Products (Alternate I only).
------(viii) 52.223-13, Certification of Toxic Chemical Release Reporting.
------(ix) 52.227-6, Royalty Information.
------ (A) Basic.
------ (B) Alternate I.
------(x) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.
(d) The offeror has completed the annual representations and certifications electronically via the Online Representations and Certifications Application (ORCA) website at http://orca.bpn.gov. After reviewing the ORCA database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below (offeror to insert changes, identifyingchange by clause number, title, date). These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.
FAR Clause Title Date Change
Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on ORCA.
(End of Provision)
252.247-7022 REPRESENTATION OF EXTENT OF TRANSPORTATION BY SEA (AUG 1992)
(a) The Offeror shall indicate by checking the appropriate blank in paragraph (b) of this provision whether transportation of supplies by sea is anticipated under the resultant contract. The term supplies is defined in the Transportation of Supplies by Sea clause of this solicitation.
(b) Representation. The Offeror represents that it:
____ (1) Does anticipate that supplies will be transported by sea in the performance of any contract or subcontract resulting from this solicitation.
____ (2) Does not anticipate that supplies will be transported by sea in the performance of any contract or subcontract resulting from this solicitation.
(c) Any contract resulting from this solicitation will include the Transportation of Supplies by Sea clause. If the Offeror represents that it will not use ocean transportation, the resulting contract will also include the Defense FAR Supplement clause at 252.247-7024, Notification of Transportation of Supplies by Sea.
(End of provision)