Attachment 3
PERFORMANCE WORK STATEMENT
FOR
PAINTING OF WHARF ALPHA PORTAL CRANE
628th LOGISTICS READINESS SQUADRON
4 MAY 2018
04 May 2018
PERFORMANCE WORK STATEMENT
TABLE OF CONTENTS
SECTION PAGE
1. DESCRIPTION OF SERVICES
1.1. BASIC SERVICES
1.2. DESCRIPTION OF SERVICES/OBJECTIVES
1.3. BACKGROUND
1.4. PERIOD OF PERFORMANCE. ........................................ Error! Bookmark not defined.
2. SPECIFIC TASKS
2.1. WORK AREA PREPARATION
2.2. HAZARDOUS WATER COLLECTION, TESTING & DISPOSAL
2.3. PAINT
2.4. CORROSION REPAIR, SURFACE PREPARATION AND PAINTING
2.5. WORK AREA CLEAN UP
3. GOVERNMENT QUALITY ASSURANCE
3.1. GOVERNMENT INSPECTION. ....................................... Error! Bookmark not defined.
3.2. PROGRESS MEETINGS. .................................................. Error! Bookmark not defined.
3.3. QUALITY CONTROL PROGRAM. ................................. Error! Bookmark not defined.
3.4. FIELD INSPECTION. ........................................................ Error! Bookmark not defined.
4. GOVERNMENT FURNISHED PROPERTY AND SERVICES
4.1. GOVERNMENT FURNISHED PROPERTY AND SERVICES. ... Error! Bookmark not defined.
4.2. GOVERNMENT FURNISHED SERVICES (BASE SUPPORT)
4.2. CONTRACTOR FURNISHED PROPERTY AND SERVICES
5. GENERAL INFORMATION
5.1. HOURS OF OPERATION
5.2. CONTRACTOR PERSONNEL
5.3. RECORDS
5.4. SECURITY REQUIREMENTS
5.5. PHYSICAL SECURITY
5.6. FORCE PROTECTION CONDITIONS
5.7. ENVIRONMENTAL CONTROLS
5.8. SAFETY REQUIREMENTS
6. APPENDICES
6.1. DELIVERABLES
6.2. DEFINITIONS
6.3. GLOSSARY AND ACRONYMS
6.4. PUBLICATIONS/FORMS
6.8. APPLICABLE DOCUMENTS & REFERENCES
1. DESCRIPTION OF SERVICES.
1.1. BASIC SERVICES.
This is a non-personnel services contract to provide protective coating maintenance for a 45T
Washington Iron Works Portal Crane located on Wharf Alpha for the 628th Logistics
Readiness Squadron at Joint Base Charleston, Naval Weapons Station (JB CHS NWS) in Goose
Creek, South Carolina. The government shall not exercise any supervision or control over the contract service providers performing the services herein.
1.2. DESCRIPTION OF SERVICES/OBJECTIVES.
The contractor shall provide all management, personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to remove/control lead-based paint and perform protective coating maintenance as defined in this
Performance Work Statement (PWS) except for those items specified as Government Furnished
Property and services. The Contractor is responsible for and required to implement, and maintain management control systems necessary to plan, organize, direct, and control all activities under this contract. The Contractor shall be responsible for maintaining communication with the Contracting Officer (CO), and to immediately notify the CO of any problems preventing timely performance of this contract.
1.3. BACKGROUND.
The Portal Crane was manufactured in 1969. The base structure of the Crane is approximately
40 feet in length, 48 feet in width and 104 feet in height. The boom is approximately 111 feet in length. The interior mechanical house is approximately 45 feet in length, 35 feet in width and 20 feet in height. No records of past protective coating maintenance services exist. A lead-based paint assessment was conducted in 2017. For the purpose of this assessment, painted surfaces with lead concentrations exceeding the SCDHEC limit (0.7 mg/cm2) are considered lead-based paint. Based on the 2017 assessment(s), the painted surfaces on the crane exhibited lead concentrations meeting or exceeding the SCDHEC disposal limit. The Contractor will be required to take environmental precautions when removing, collecting, containerizing and disposing of all paint waste materials. Destructive actions to paint containing any amount of lead
(component removal, demolition, sanding, grinding, welding, paint preparation, etc.), require compliance with the standards of OSHA 29 CFR 1926.62, including, but not limited to training, initial exposure monitoring, the use of personal protective equipment, and medical surveillance, unless objective airborne exposure monitoring indicates otherwise.
1.4. PERIOD OF PERFORMANCE.
Desired duration of work is 60 calendar days or less. Upon receipt of a notice-to-proceed (NTP), the Contractor shall begin work within 14 days. No work shall commence until full coordination is accomplished and the CO issues an NTP to the Contractor. The performance period shall be calculated from the NTP date. The Contractor shall submit a project schedule in sufficient detail that identifies each task required to complete the project and the expected completion date(s).
The pre-performance meeting will be held no sooner than 10 days after award.
0001: Required Submittal - Progress Schedule
2. SPECIFIC TASKS.
The performance of the contract includes but is not limited to work area preparation, clean and paint exterior & interior crane structure, collect, test & dispose lead based paint waste, and work area clean-up.
2.1. WORK AREA PREPARATION.
Work areas, including equipment, ground surfaces, gravel, grass, plants, shrubs, plaques, and other real property or any items not to be painted shall be protected by the Contractor to ensure no environmental exposure, damage, or paint splatter occurs. The Contractor shall cover all electrical equipment within the interior of the structure on the entry-door side of machinery house. The Contractor shall cover drains and line the wharf deck with an acceptable fabric barrier below the areas of blasting, scraping, or surface prep to collect all possible paint waste debris from entering the waterways. The Contractor shall prevent ruts in ground surfaces caused by Contractor equipment. All damage by the Contractor to landscaping shall be repaired or replaced prior to final acceptance. Any moving of equipment or other items shall be the
Government’s responsibility. The Contractor shall take necessary steps to collect all lead bearing paint residue caused by water blasting and scraping of existing surfaces.
Projects that involve cutting, sawing, sanding, scraping, needle gunning, abrasive blasting, high temperature removal, etc., of lead-based paint (LBP)/paint with lead materials may result in lead exposures in excess of OSHA limits. Therefore, personal protective equipment shall be used and controls implemented. The Contractor shall institute worker protection controls as indicated in
29 CFR 1926.62 and herein. Also, some work practices are prohibited for LBP/LBP hazard abatement (e.g., machine sanding, abrasive blasting) unless used with HEPA exhaust controls
(see 40 CFR 745.227).
2.2. HAZARDOUS WATER COLLECTION, TESTING & DISPOSAL.
2.2.1. The Contractor shall refer to UFGS 02-82-33.13 and 29 CFR 1926.62 for the removal, control, and disposal of paint with lead.
2.2.2. Collection. The Contractor shall collect and dispose all lead-contaminated waste, scrap, debris, bags, containers, equipment, and lead-contaminated clothing that may produce airborne concentrations of lead particles. The Contractor shall label containers IAW 29 CFR 1926.62 and
40 CFR 262. The contractor is required to dispose lead-contaminated waste material at an EPA or State approved hazardous waste treatment, storage, or disposal facility off Government
Property. The contractor will place waste materials in a U.S. Department of Transportation (49
CFR 178) approved 208 liter 55 gallon drum and properly label each drum to identify the type of waste (49 CFR 172) and the date the drum was filled. For hazardous waste, the collection drum requires marking/labeling IAW 40 CFR 262 during the accumulation/collection timeframe. The
CO or an authorized representative will assign an area for interim storage of the waste-containing drums. Do not store hazardous waste drums in interim storage longer than 90 calendar days from the date affixed to each drum.
2.2.3. Lead Waste Management. The Contractor shall provide a Lead Waste Management Plan that shall comply with applicable requirements of 29 CFR 1926.62 federal, state, and local hazardous waste regulations and address:
a. Identification and classification of hazardous wastes associated with the work.
b. Estimated quantities of wastes to be generated and disposed of.
c. Names and qualifications of each contractor that will be transporting, storing, treating, and disposing of the wastes. Include the facility location [and operator] and a 24-hour point of contact. Furnish two copies of proof of [EPA] [State] [and] [local] hazardous waste [permit applications] [permits] [manifests] [and] [EPA Identification numbers]
[Transporter Number].
d. Names and qualifications (experience and training) of personnel who will be working on-site with hazardous wastes.
e. List of waste handling equipment to be used in performing the work, to include cleaning, volume reduction, and transport equipment.
f. Spill prevention, containment, and cleanup contingency measures including a health and safety plan to be implemented in accordance with 29 CFR 1926.65.
g. Work plan and schedule for waste containment, removal and disposal. Wastes shall be cleaned up and containerized daily. Proper containment of the waste includes using acceptable waste containers (e.g., 55-gallon drums) as well as proper marking/labeling of the containers.
h. Unit cost for waste disposal according to this plan.
Along with the 628 CES/ (CP), the Contractor must meet with the CO to discuss in detail the lead waste management plan and the lead-based paint/paint with lead removal/control plan, including work procedures and precautions for the removal plan.
0002: Required Submittal – Lead Waste Management Plan; Health and Safety
Plan
2.2.4. Labels. The Contractor shall use the following information in the appropriate spaces on the label for the drums:
Proper DOT Shipping Name: Hazardous Waste, Solid, N. O. S. (D008), RQ
UN or NA #: NA 3077
Generator Name: Joint Base Charleston
Address: 628CES/CEIE
City State: Charleston, SC 29404
EPA ID #: SC3570024460
EPA Waste #: D008
In addition, the Contractor shall fill and attach a Material Pending Analysis Sheet to the drums.
Refer to Appendices 6.1.2. for an example of the form. The Contractor shall stencil the words
“WATER BLASING RESIDUE AND PAINT” and the name of the Contractor on the drums in
2” letters. Once test samples have been analyzed and a determination has been made of the nature of the material, appropriate labels shall be affixed to the drums.
0003: Required Submittal – Material Pending Analysis sheet
2.2.4. Disposal. If the Total Metal & Toxicity Characteristic Leaching Procedure (TCLP) results are below regulatory limits for metals, then a non-hazardous label shall be used. If the TCLP results are above regulatory limits for metals, the Contractor shall provide and use standard hazardous waste labels which meet requirements of the EPA and SCDHEC. Labels shall be vinyl or a similar weatherproof material with an adhesive backing. The Contractor shall add required information, accumulation start date etc. at the time the label is used.
2.2.5. Testing. The Contractor shall take representative samples of water blasting paint residue for TCLP testing. The Contractor will provide all testing/analysis data, waste profiles, and SC
Authorization Request Forms (when applicable) to 628CES/CEIE for review and signature The
Contractor shall submit name, address, telephone number, FAX number, and e-mail address of the independent third party laboratory selected to perform materials/residue testing. Submit documentation that laboratory has experience in testing residue samples for conformance with specifications, and that persons performing analyses are qualified.
0004: Required Submittal – Total Metals and TCLP Metals report
2.2.6. Testing/Analysis. The Contractor will provide copies, for approval by (628CES/CEIE) at
963-4976, of permits for transporters and treatment, storage, disposal facilities the Contractor intends to use, or as an alternative, the Contractor will utilize only those transporters/facilities listed on the Joint Base Charleston list of approved transporters/facilities. The Contractor shall coordinate with 628CES/CEIE on the non-hazardous and hazardous waste manifests for shipment of non-hazardous wastes. The Contractor shall not be permitted to store hazardous wastes, including empty containers, for longer than 90 days. The Contractor shall submit manifests and records of the quantity and type of hazardous wastes removed from the base to the
Environmental Flight.
0005: Required Submittal –Testing/analysis data, waste profiles, and SC
Authorization Request Forms
2.3. PAINT.
2.3.1. Material. The Contractor shall submit color charts with dark blue shades identifying the intended paint color for the crane boom for acceptance to the CO. The Contractor shall submit color charts with dark blue shades identifying the intended color of the Crane Mechanical House
Interior floor and guard rails to the CO for acceptance. The walls within the Crane Mechanical
House Interior shall be painted white. The Contractor shall use a Carboline Carboguard
Rustbond type paint, or equivalent. Contractor shall submit a list of all materials to be used in performance of this contract at the pre-performance conference (e.g., paint, thinner, solvent, cleaner, etc.). All Safety Data Sheets, Manufacturer’s Instructions, Product Description, Specification Data, and Warranty Information for each product proposed shall also be submitted.
Paint materials shall be from a single manufacturer.
0006: Required Submittal – Paint Samples
2.3.2. Packaging and Labeling. Paints shall be in sealed containers that legibly show the designated name, formula or specification number, batch number, color quantity date of manufacture, manufacturer’s formulation number, manufacturer’s directions including any warnings and special precautions, and name of manufacturer. Pigmented paints shall be furnished in containers not larger than five gallons. Emulsion paints shall be stored to prevent freezing.
2.3.3. Testing. All Contractor-furnished paint shall be subject to testing by the Government at the option of the Government.
2.3.4. Certificates of Compliance. The Contractor shall furnish a certificate of compliance attesting that all paints proposed for use contain no more than 0.06 percent lead.
0007: Required Submittal – Paint Certification
2.3.5. Manufacturer’s Instructions. Detailed mixing, thinning and application instructions, minimum and maximum application temperature, curing time and drying time between coats shall be furnished for epoxy, polyester-epoxy, moisture-cure polyurethane, and liquid glaze coatings, to the CO for acceptance. For the liquid glaze coatings, the instructions shall also include surface preparation requirements and the number and types of coats required for each surface. Detailed application instructions shall be furnished for textured coatings.
0008: Required Submittal – Detailed Manufacturer Instructions
2.3.6. Substitution. The Contractor shall submit substitute materials for acceptance to the CO.
Substitute materials must be accepted prior to their use.
2.3.7. Test Reports. The Contractor shall furnish either one of the following reports for batches in excess of 25 gallons. A test report showing that the batch meets all specification requirements. A test report showing that previous batches of the same formulation as the batch to be used met all specification requirements, and a report of test results for properties of weight per gallon, viscosity, fineness of grind, drying time, color, and gloss. Testing procedures and reports shall be as specified in Fed. Std. 141, Method 10J1.Z Paragraph 5.
2.3.8. Quality Assurance. Materials tested will be approved based on test reports furnished, except where samples are tested. Approval will be based on tests of samples in this case.
2.3.9. Warranty. The Contractor shall guarantee work for 1 year after acceptance by the
Contracting Officer.
2.4. CORROSION REPAIR, SURFACE PREPARATION AND PAINTING.
2.4.1. Ref. The contractor shall meet specifications outlined in UFGS 09-97-13.26 and 29 CFR
1926.59 for corrosion repair, surface preparation, and painting.
2.4.2. Ref. The contractor shall meet specifications outlined in UFGS 09-97-13.26 and 29 CFR
1926.59 for corrosion repair, surface preparation, and painting.
2.4.3. Corrosion Repair. During surface preparation of the crane, each area to be painted shall be inspected for damage, corrosion and composite damage by the Contractor. Any required repair shall produce a smooth, flush appearance similar to the original surface.
2.4.4. Surface Preparation. The crane will be thoroughly cleaned before applying any coating maintenance. The Contractor shall spot clean any areas of bare steel with power tools to SSPC
SP3 standard. Edges of peeling paint shall be feathered by adequate sanding prior to painting.
Appropriate masking with tape and barrier materials shall be applied prior to painting, paint touch-up, or clear coat application.
2.4.5. Painting. The Contractor shall provide all equipment necessary for cleaning, de-glossing, paint touch-up and application of a new clear coat. The Contractor is responsible for paint preparation as necessary, i.e. scraping, sanding, surface washing, and priming, de-glossing.
Painted finished surfaces shall be uniform, free from runs, bubbles, drips, ridges, waves, sags, laps, brush marks, orange peel and variations in color. If any marking is obliterated, unreadable, or color scheme is undetermined, the Contractor shall contact the CO to determine correct marking or color. The paint used must be compatible with the existing coating and shall have an expected lifespan of at least five years.
2.4.4.1. Exterior. Protective Coating Application; Prime coat of Carboline Rustbond @ 1.0-2.0 mils DFT to boom; Intermediate coat of Carboline Carboguard 60 @ 2.0-5.0 mils DFT; and
Topcoat of Carboline Carbothane 134HB @ 2.0-5.9 mils DFT. Or equal products may be submitted for approval.
2.4.4.2. Interior. The Contractor shall manually clean all heavy oil & grease and provide high pressure washing of all handrails, walls and floors. Interior cab painting does not include mechanical equipment, overhead structure, or ceiling.
2.4.6. Slip Resistant. The Contractor shall provide Slip Resistant materials to all walking surfaces.
2.4.7. Coating Work Plan. The Contractor shall provide and submit a coating work plan to the
CO to include a pre-work determination of the existing surface profile. The Coating Work Plan shall address the following:
a. Mobilization, set-up, surface preparation, coating application and curing, inspection, documentation, demobilization, and any other process that impacts work progression.
b. Provide procedures for determining the existing surface profile under paint, and procedures for ensuring that the profile is not increased beyond the maximum profile specified herein.
c. Provide procedures for correcting non-compliant work. Detailed procedures are required in advance to avoid delays in meeting overcoat windows as well as to avoid delays in production. Provide procedures for repairing defects in the coating film, such as runs, drips, sags, holidays, overspray, as well as how to correct coating thickness non-compliance, any other areas of repair or rework that might be adversely affected by delays in preparing and approving new procedures.
d. If a procedure is based on a proposed or approved request for deviation, the deviation must be referenced. Changes to procedures must be noted by submittal number and date approved, clearly delineating old requirements and new requirements, so that the records provide a continuous log of requirements and procedures.
0008: Required Submittal – Coating Work Plan; Quality Control Plan
2.5. WORK AREA CLEAN UP.
The Contractor shall at all times keep the work area, including storage areas, used by the
Contractor, free from accumulations of waste material and trash. All tools, scaffolding, equipment, and materials not the property of the Government shall also be removed upon completion of the contract. The Contractor shall keep the work areas in a clean and neat condition and all equipment returned to a safe location each day. Paint spots, oil and stains upon adjacent surfaces shall be removed and the entire job left clean and acceptable. Material disposal shall be the responsibility of the Contractor and performed in accordance with Federal, State, and local regulations. If waste material is not removed daily, the Contractor shall provide a covered and secured waste container at their expense.
3. GOVERNMENT QUALITY ASSURANCE
3.1 GOVERNMENT INSPECTION/OBSERVATION
3.1.1. Government Observations. Government personnel, other than COs, may observe contractor operations. These personnel may not interfere with contractor performance or make any changes to contract.
3.2 PROGRESS MEETINGS
3.2.1. Progress Meetings. The CO, Contract Administrator (CA), Requirement Owner (RO), or the Contractor may request a progress meeting as necessary. Written minutes of any such meetings shall be recorded by the CA in the contract file and signed by the PM and the CO or
CA. If the contractor does not concur with any portion of the minutes, such nonoccurrence shall be provided in writing to the CO within 10 calendar days following receipt of the minutes.
Progress meeting will at a minimum discuss:
Opportunities to improve the contract, Any modifications required of the contract, Unsatisfactory inspection results, Steps taken by the contractor to prevent occurrences in the future.
3.2.2. Meeting Minutes. Meeting Minutes will be reduced to writing, signed by the CO and any other signatures as deemed appropriate, distributed to the functional area and the contractor.
Should the contractor not concur with the minutes, the contractor will provide a written notification within 5 working days to the CO identifying areas of non-concurrence for resolution.
3.3. QUALITY CONTROL PROGRAM.
3.3.1. Quality Control Plan (QCP). The Contractor’s QCP shall be submitted to the CO within
Five (5) days after issuance of an NTP, or upon request. The CO will notify the Contractor of acceptance or required modifications to the plan. The Contractor shall make appropriate modifications and obtain acceptance of the plan by the CO within 10 days. After acceptance of the quality control plan the Contractor shall receive the CO’s acceptance in writing of any proposed change to his QCP. The Contractor’s QCP shall contain, at a minimum, the following descriptive items:
Cover all services and include areas to be inspected on a scheduled and unscheduled basis, inspection frequency, and the title and organizational placement of the inspector(s).
The methods to be used for identifying and preventing defects.
Record Content and Retention
3.3.2. Contractor’s Performance. The Government will assesses the Contractor’s performance on an on-going basis, both positive and negative, and provide a record on a given contract during a specified period of time.
3.3.3. Past Performance Information (PPI). PPI can be provided to other government agencies, as requested.
3.3.4. Contractor Performance Assessment Report (CPARS). Contractor performance may be documented in the CPARS system. The contractor will be provided a copy of their assessment. The contractor shall have 60 days to review and respond to assessment comments before the assessment is made final. Past Performance assessment reports will be protected by all parties and treated by government personnel as “For Official Use Only/Source Selection
Information in accordance with FAR 2.101 and 3.104”.
3.4. FIELD INSPECTION
3.4.1 Coating Inspector. THE CONTRACTOR SHALL PROVIDE THE SERVICES OF A
THIRD PARTY COATINGS INSPECTOR. The coating inspector must be considered a QC
Specialist and report to the CO. The Coating Inspector must be present during all pre-preparation testing, surface preparation, coating application, initial cure of the coating system, during all coating repair work, and during completion activities as specified in UFGS 01 45
00.00 10, 01 45 00.00 20, and 01 45 00.00 40 QUALITY CONTROL. The Coating Inspector must provide complete documentation of conditions and occurrences on the job site, and be aware of conditions and occurrences that are potentially detrimental to the coating system. The requirements for inspection listed in this Section are in addition to the QC inspection and reporting requirements specified in UFGS 01 45 00.00 10, 01 45 00.00 20, and 01 45 00.00 40
QUALITY CONTROL.
3.4.2 Inspection and Documentation Requirements. The Coatings Inspector shall submit a daily inspection report when performing work under this Section, to the CO. All non-compliance issues, and all issues that were reported for rework shall be noted in accordance with
QC procedures in UFGS 01 45 00.00 10, 01 45 00.00 20, and 01 45 00.00 40 QUALITY
CONTROL. Each report must be signed by the coating inspector and the QC Manager. Submit report within 24 hours of date recorded on the report.
3.4.3 Inspection and Documentation Requirements. The Coating Inspector shall address the following in their field inspection report:
a. Perform field inspection in accordance with ASTM D3276 and the approved Coating
Work Plan. Document Contractor's compliance with the approved Coating Work Plan.
b. Provide all tools and instruments required to perform the required testing, as well as any tools or instruments that the inspector considers necessary to perform the required inspections and tests. Document each inspection and test, including required hold points and other required inspections and tests, as well as those inspections and tests deemed prudent from on-site evaluation to document a particular process or condition, as follows:
(1) Location or area;
(2) Purpose (required or special);
(3) Method;
(4) Criteria for evaluation;
(5) Results;
(6) Determination of compliance;
(7) List of required rework;
(8) Observations.
c. Collect and record Environmental Conditions as described in ASTM D3276 on a 24 hour basis, as follows:
(1) During surface preparation, every hour or when changes occur;
(2) During coating application and the first four days of initial cure, every hour or when changes occur;
(3) Note location, time, and temperature of the highest and lowest surface temperatures each day;
(4) Use a non-contact thermometer to locate temperature extremes, then verify with contact thermometers.
d. NOTE: Data collected on Environmental conditions may be used for overnight data, however, the data must be constantly verified as to location of sensors and validity of data with respect to the coating work being accomplished.
0009: Required Submittal – Third Party Coating Inspector Qualifications
4. GOVERNMENT FURNISHED PROPERTY AND SERVICES.
4.1. Government Furnished Property and Services will not be provided to contractors, contractors’ management and subcontractor for this requirement as prescribes under FAR Part
45. All Government property that is provided will be considered as incidental to the place of performance and will remain accountable by the Government.
4.2. Government Furnished Services (Base Support). The Government will provide a 120 foot by 120 foot lay-down area for Contractor material and equipment staging. Available utilities include a 110 VAC located at the latrine location. There are no water faucets on the
Wharf to tap into. Additionally, there is a Port-a-Jon on the premises.
4.2.1. Security Police and Fire Protection. Phone number for Security Forces Squadron, [843-963-3600]; Fire Protection, 911.
4.2.2. Utilities. The Government will provide all electricity, water and sewage at no additional cost to the Contractor. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for utilities conservation.
4.3. Contractor Furnished Properties and Service. Except for those items or services specifically stated to be government-furnished under Section 4 and any appendixes, the contractor shall furnish everything required to perform this contract in accordance with all of its terms. The Contractor shall provide all construction support equipment items to control and secure the work-site and any materials and equipment used in the performance of this contract.
These include but are not limited to, sanitary facilities, dumpsters, barriers, barricades, scaffolding, powered high-lift vehicles, cleaning materials, paint, de-glossing, paint touch-up and application of a new clear coat. The Contractor is responsible for the erection and safe application of all equipment. All painting under this contract shall be protected by the multiple and frequent use of signs indicating “Painting-In-Progress.” Signs shall be furnished by the
Contactor and displayed from the beginning to completion of the contract. Signs shall be of commercially printed type, firmly mounted and kept clean. There shall be no advertising matter on the signs.
5. GENERAL INFORMATION.
5.1. HOURS OF OPERATION.
5.1.1. Normal Hours of Operation. The Contractor shall perform the services required under this contract during the following hours: MON - FRI, 0730-1630, EXCEPT FEDERAL
HOLIDAYS. The Contractor may work, with prior approval of the CO, extended hours to ensure timely completion of work at no additional cost to the Government. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons.
5.1.2. Recognized Holidays. The Contractor is not required to perform services on Federal
Holidays. A list of all Federal holidays can be found at the opm.gov website.
5.1.3. Inclement Weather. If the base closes due to inclement weather, the Contractor will be notified by the CO. The Contractor will follow local procedures for reporting in inclement weather as advertised on local television and radio stations.
5.2. CONTRACTOR PERSONNEL.
5.2.1. Non-Personal Services. The Government will neither supervise Contractor employees nor control the method by which the Contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual
Contractor employees. The Contractor shall be responsible to manage employees to guard against actions perceived to be personal services. If the Contractor perceives an action is a personal service, they shall notify the CO immediately. The work performed shall not include any policy/decision making or management of any nature, i.e., inherently Governmental functions.
5.2.2. Contract Manager (CM). The Contractor shall provide a contract manager and alternate(s) who are knowledgeable of contract operations. The contractor shall submit the name, address, telephone number of the CM to the CO within 2 days of contract start date. The list shall be kept current throughout the life of the contract. The CM or alternate(s) shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM or alternate(s) shall be available to meet on the installation with government personnel designated by the CO to discuss problem areas.
5.2.2.1 Electronic Mail (E-Mail). Email correspondence shall allow use of Microsoft, Adobe
Acrobat, and similar formats. Within 10 days after contract award, the Contractor shall provide the CO all e-mail addresses for communications related to this contract including, but not limited to contract documents, invoice information, request for proposals, and other correspondence. The
CO may also use email to notify the Contractor of base access conditions when emergency conditions warrant, such as hurricanes, terrorist threats, etc. It is the Contractor's responsibility https://www.opm.gov/policy-data-oversight/snow-dismissal-procedures/federal-holidays/#url=2017 to make timely distribution of all CO initiated e-mail within their organization including field office(s). The Contractor shall promptly notify the CO of any email address changes.
5.2.3. Personnel Roster. The contractor may be required to provide a personnel roster consisting of names and other pertinent personnel data to the requiring activity for the purposes of accountability. The personnel roster shall be updated as individuals are removed and added.
5.2.4. English Language. Employees interacting with Government personnel are required to communicate clearly and concisely in English.
5.2.5. Appearance. Contractor personnel must present a clean and neat appearance.
Contractor’s uniforms must be easily recognized. This may be accomplished by wearing distinctive clothing bearing the name of the company and/or by wearing badges with the company name and employee name.
5.2.6. Certifications. Contractor employees shall have current and valid professional certifications and licenses required to perform task within this PWS, prior to contract award. All certification and licensing requirements by Federal, State, and local agencies shall be complied with at the contractor's expense. The Contractor shall be certified with the Society of Protective
Coatings (SSPC) for The Coating of Complex Structures (QP1) and Hazardous Coating Removal
(QP2) IAW UFGS 02 83 33.13 and UFGS 09 97 13.26. Contractor personnel are required to possess the skills necessary to support their company’s minimum requirements of the labor category under which they are performing. The Contractor shall ensure a sufficient number of personnel are trained to use EESOH-MIS. The Contractor shall ensure all employees receive
HAZCOM training within 7 days of employment. HAZCOM training must be documented in employee training records. Training necessary to meet minimum requirements will not be paid for by the Government or charged to the contract by contractors.
0010: Required Submittal – Contractor Qualifications
5.2.7. Use of Government Employees. The Contractor shall not employ any person who is an employee of the U.S. Government if employing that person would create a conflict of interest.
In addition, the Contractor shall not employ any person who is an employee of the Department of the Defense if such employment would be contrary to the policies contained in AFI 64-106, Chapter 1, Industrial Labor Relations Activities.
5.2.8. Employment of Spouses/Dependents. The Contractor shall not employ any person who is a spouse or dependent child of a Department of Defense employee (either military or civilian) when such employee would be placed in a conflict of interest or appearance of a conflict of interest by virtue of such employment.
5.2.8. Off-duty Military Personnel. The Contractor is cautioned off-duty active military personnel may be subject to permanent change of station, change in duty hours, or deployment.
Military Reservists and National Guard members may be called to active duty. Absence caused by these employees shall not constitute an excuse for nonperformance.
5.2.9. Conduct/Removal. The Government reserves the right to remove or restrict access to the installation, under this contract, of any contractor employee, or prospective contract employee identified as a threat to health, safety, security, general wellbeing, or the operational mission of the installation and its population. Removal does not relieve the contractor of the responsibility to perform contract requirements.
5.2.10. Privately Owned Vehicles. Each Contractor employee driving a privately owned vehicle on the installation must carry minimum liability insurance as required by the state.
Contractor employees shall adhere to all posted speed limits and shall not use hand-held cellular telephones while driving on the installation for phone calls or texting. Use of seatbelts is mandatory. Any contractor employee cited for driving under the influence will have their driving privileges revoked.
5.2.11. Labor Disruptions. The Government reserves the right to take over performance of this contract in the event of a labor strike, bankruptcy, default or period of non-performance by the contractor’s employees. In such events, the services will be performed exclusively by
Government personnel and not a mix of government and non-striking contractor employees. At the direction of the CO, the Contractor agrees to remove its non-striking work force from the performance site and not interfere in any way with government performance. The Contractor further agrees, under such circumstances, to permit the government to use any essential contractor-furnished property. The Government will not compensate the Contractor for performance during this period.
5.2.12. Subcontract Management. The Contractor shall be responsible for subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance. The prime Contractor will manage work distribution to ensure there are no Organizational Conflict of Interest (OCI) considerations. The
Contractor shall be responsible for ensuring Sub-Contractors satisfy the requirements set forth in the contract. The Contractor shall include a provision in all subcontracts that requires the subcontractors to comply with terms and conditions of this contract.
5.3. RECORDS.
The Contractor shall be responsible for creating, maintaining, and disposing of only those
Government required records specifically cited in this PWS or required by the provisions of law.
If requested by the Government, the Contractor shall provide the original record, or a copy within five working days of the request.
5.3.1. Freedom of Information Act (FOIA). All official Government records affected by this contract are subject to FOIA (5 U.S.C. 552/DoD 5400.7-R/AF Supplement) requirements. Any request received by the Contractor for access/release of information from these records to the public (including government/contractor employees acting as private citizens), whether oral or in writing, shall be immediately brought to the attention of the CO for forwarding to the Base FOIA
Manager to ensure proper processing and compliance with the Act.
5.3.2. For Official Use Only (FOUO). The Contractor shall comply with DoD 5400-7-R, Chapter 4, DoD Freedom of Information Act (FOIA) Program requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.
5.3.3. Notification of Debarment/Suspension Status. The Contractor shall immediately notify the CO in the event of suspension, debarment, or upon being declared ineligible to receive federal contracts.
5.3.4. Correspondence. The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The Government issued contract number is to be referenced on all official communication starting upon notice of award.
5.3.5. Post Award Conference. The Contractor agrees to attend any post award conference convened by the CO IAW FAR Part 42.5. These meetings shall be at no additional cost to the
Government.
5.4. SECURITY REQUIREMENTS.
5.4.1. Legal Authority for Entry. Authority to enter Joint Base Charleston (JB CHS) is granted by the Joint Base Charleston Installation Commander. Under authority of the Internal
Security Act of 1950, Section 21, contractors are subject to lawful search-and-seizure procedures upon entry or exit from the installation. The Contractor shall comply with all requirements and procedures IAW FAR 5353.242-9000, AFM31-113 Installation Perimeter Access Control, and
JB CHS 31-6 Joint Base Charleston Instruction 31-6 Contractor Access Control Program
(CACP), Contractor Access to Air Force Installations. Base specific information is provided below. The individual must submit to applicable identity proofing, vetting and fitness determination, and conform to USAF protocol requirements for physical access and credential/screening standards as specified in this instruction and AFMAN 31-113.
5.4.2. Contractor Access to Air Force Installations. All Contractor employees and subcontractors requiring access to the installation shall complete a criminal history check and fingerprinting prior to accessing the installation.
5.4.3. REAL ID Act of 2005. Visitors/contractors with driver’s licenses from ME, MN, MO, MT, and WA (exceptions are EDL-Enhanced driver’s licenses from MN & WA) will not be able to obtain base access without another form of identification as an identity proofing document.
The list of authorized IDs can be found in the REAL ID Act of 2005. Please visit the
Department of Homeland Security’s (DHS) website to get the latest information, https://www.dhs.gov/current-status-states-territories.
5.4.4. Base Access Worksheet. The Contractor shall provide a correctly, completed copy of the
Joint Base Charleston (JB CHS) Base Access worksheet and a copy of their federally recognized photo IDs. All documents must be submitted to the Contract Administrator within seven (7) business days of the required access date. Blank JB CHS Worksheet for Base Access can be obtain by the COR, the CA, or at the Visitor Control Center. The JB CHS Worksheet for Base
Access is good for one year from the date of processing.
5.4.5. Installation Passes. For access to the JB CHS, the Contractor shall possess either a
Defense Biometric Identification System (DBIDS) ID Access Card (badge) or a Temporary
Paper Access Credentials/Passes. The VCC staff will determine if a badge or pass is issued. In addition to the Government issued badges and passes, all contractors must maintain current personal identification such as a driver's license or State ID card on them while they are on the installation. At a minimum, this ID should include a picture, the physical description of the individual, date of birth, and signature.
5.4.6. Lost or Stolen Installation Passes. All personnel must immediately report a stolen or lost access credentials. If a DBIDS Access Card was stolen, the contractor will report to the Base
Defense Operations Center (BDOC) and accomplish an AF Form 1168 (Statement of
Suspect/Witness/Complainant) stating what led to the loss of the card so the card can be updated by the credential issuance office (VCC) as lost/stolen in DBIDS. Contractors that have misplaced their DBID Access Card will need to be sponsored onto the installation by their JB
CHS sponsor. Sponsors must report the misplaced DBID Access Card as lost if misplaced longer than 48 hours.
5.4.7. Turn-in of Access Badges/Passes. The contractor shall be responsible for prompt return of credentials for: 1) any employee who no longer requires access to the work site; 2) upon request by a CO; and 3) upon completion or termination of the contract. The prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.
5.4.8. Weekend/Holidays/Off-Hours Contractor Work. All Contractor work during weekends, holidays and off-hours (1800-0600) will require Contractor weekend/holiday/ after-hours request letter submitted to the requiring agency. The letter will include the following:
location/building# of work being performed, name of each person working, description of work being performed and the date/times work will take place. All employees must have an approved
JB CHS Worksheet for Base Access on file prior to work commencing. The letter will be signed and marked “Approved” by the requiring base sponsor. Approval letter will be submitted to the
Dorchester Gate VCC NLT 1200 hours the Thursday prior to the Weekend/Holiday/Off-Hours work being performed.
5.4.9. Vehicle Entry Access Gates. Listed below are the main access gates that the contactor shall use in performance of this requirement.
The JB-CHS-Air Base Main Gate/Dorchester located at the intersection of Dorchester
Road and Hill Blvd, this gate is open 24 hours a day, seven days a week. No commercial trucks, towing trailers or equipment are authorized thru Dorchester Gate.
JB-CHS-Air Base Arthur Drive/Rivers Gate is located on Arthur drive and is the gate closest to the flight-line, this gate is open 24 hours a day, seven days a week. This is the only entrance to the Air Base for commercial trucks, oversized vehicles, towing trailers or equipment as well as primary entrance for all Contractor and vendor vehicles.
Commercial and oversized vehicles must enter using the search area lane (far right lane).
JBCHS-WS Main Gate is located on Red Bank Rd adjacent to the Red Bank Club, this gate is open 24 hours a day, seven days a week. No commercial trucks with two or more axles are authorized through the Red Bank Main Gate.
JB CHS-WS 1050 Remount Rd, North Charleston gate is open 24 hours a day, seven days a week. This is the only entrance to the Weapon Station for commercial trucks, oversized vehicles, towing trailers or equipment as well as primary entrance for all
Contractor and vendor vehicles. Commercial and oversized vehicles must enter using the search area lane (far right lane). No passes will be issued at any Entry Control Points at
JB CHS-WS.
5.4.10. Contractor’s Company & Privately-Owned Vehicles (POV). If operating a vehicle on JB-CHS, you must have proof of ownership (registration), current company identification, and proof of insurance on all vehicles. Each employee operating a vehicle must have a valid driver's license.
5.4.11. Delivery Vehicles. All delivery vehicles must have a computerized delivery slip, commercial bill of lading, or work order showing JB CHS (building number and/or street address) as the delivery destination. It is advisable to include the COR’s phone number. All delivery vehicles shall use the JB CHS-AB Arthur Drive/Rivers Gate or the JB CHS-WS
Remount Rd gate for vehicle scanning in order to access the installation.
5.4.12. Base Entry Access Gate Vehicle Checks. Entry procedures during periods of increased security maybe changed with little or no notice. Random inbound and outbound vehicle inspections may occur. Failure to consent to these checks may result in barment by the installation commander or suspended or revoked base driving privileges.
5.4.13. Base Exercises. Entry to or exit from the base may be delayed due to gate closures.
Closures are usually for short periods of time. Should you or your employees be stopped at a cordon (exercise perimeter) or are directed to evacuate your work area, you may identify yourself to the cordon guard as a Contractor and state the reason you need to remain in the cordon area.
The guard will request for exemption from there chain of command. If the exemption is approved, only company or properly marked vehicles will be allowed to cross or remain in the exercise cordon area. If the exemption is not, you will remove yourself from cordon until completion of the exercise. If the exercise causes delays or other problems with your contract performance, immediately notify the CO, CA, or COR.
5.4.14. Items Prohibited on JB CHS. Items prohibited in the state of South Carolina are also prohibited on JB-CHS. Prohibited items are subject to confiscation. Administrative or judicial action, to include base debarment, may be initiated against individuals possessing a prohibited item on JB-CHS. Examples of prohibited items are, but not limited to:
Illegal drugs.
Shotguns, handguns, machineguns, firearm silencers, ammunition of any type, blasting caps or similar items of explosive material, starter or flare pistols, pellet or BB guns, dynamite, teargas and their dispensing devices, and other similar devices.
Construction tools that require use of explosive materials are authorized if they are required to perform approved duties. Contractors who require one of the prohibited items listed above may bring the item onto the installation in performance of the contract (i.e., bird control, wild life management, etc.), but only when specified in the contract.
Blades in excess of four inches, switch blade knives, underwater spear guns, bows and arrows, crossbows, slingshots and blowguns, throw blade knives, blackjacks, nightsticks, clubs, brass knuckles, tomahawks, swords, bolas, fighting sticks, throwing discs, chains, and other similar items that can be used as a weapon.
Cameras, camcorders, etc., are not normally permitted on JB-CHS unless vetted and approved through Public Affairs.
Smoking is only permitted in designated areas on JB-CHS. Where smoking is permitted, assure that tobacco products are extinguished and disposed of properly.
5.4.15. Company/Personal Property Protection. The Contractor shall provide a reasonable degree of protection (security) for both personal and company owned property. The Contractor's equipment shall be conspicuously marked for identification. The Government accepts no responsibility for lost or stolen materials, equipment or tools, regardless of the item(s) location.
Should you be a victim or witness to a crime or incident, please report it immediately to the Base
Defense Operations Center (BDOC) at 628SFS.ControlCenter@us.af.mil or 843-963-3600.
5.5. PHYSICAL SECURITY. The Contractor shall be responsible for safeguarding all
Government equipment, information and property provided for contractor use.
5.6. FORCE PROTECTION CONDITIONS. The Contractor shall be familiar with the guidance and procedures for the Air Force Antiterrorism Program Instructions, AFI 10-245. Force
Protection Conditions (FPCON) are implemented on the base to increase protective measures in anticipation of, or in response to the threat of terrorist attack. The DOD FPCON consists of five progressive levels of increasing protective measures. The Contractor shall be familiar with these conditions and act accordingly. See AFI10-245, Attachment 2 for more information on each
FPCON. The Contractor’s employees shall coordinate with the COR to ensure all Level I - AT
Awareness Training is completed within 90 days of employees’ initial assignment to the contract.
5.7. ENVIRONMENTAL CONTROLS.
5.7.1. Environmental Management System (EMS). JB CHS has implemented an EMS in order to become…