Compiled Q and A Form.pdf
PDF 186 KB Posted
- Attached to
- Repair Child Development Center, B227
- Solicitation number
- FA441822R0002
About this file
This document contains questions and answers regarding a solicitation for repair work at a child development center building. The solicitation seeks a contractor to provide labor, equipment, materials, and testing to improve the building's HVAC system efficiency and create new mechanical platform and walkway access in the attic. Key details include allowing work during daylight hours for exterior tasks, clarifying temporary cooling or heating requirements if outages extend into occupied periods, confirming responsibility for removing items from storage rooms, and addressing questions about project schedules, equipment lead times, and past performance evaluation.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JB Charleston Offeror Question and Answer Form
Specification Reference (Section & Paragraph
Reference, i.e. 23 00 00, para 1.3)
Drawing Reference (Sheet and Detail or Note Reference, i.e.
M‐101, Detail 2)
Solicitation Reference (Section, paragraph, sub‐ paragraph Reference, i.e.
Section M, Paragraph 2.3)
Attachments or Other (i.e. Submittal Register, Wage Determination, Site Visit Note, etc.)
Sections L & M
05 00 00 A561, S301, S302, S303
M100 (gen notes 1 and 2) M101 (gen note 5)
G001, Project Duration Chart
The galvanized steel ladders, mounting brackets, and ship ladders call out "refer to specificatios", however a section for misc. metals or metal fabrications does not seem to be included in the specifications. Can specifications for these items/division be provided? (CES/DOR)
See attached specification section 05 51 33 for ladders & stairs.
Question
There is concern that not enough time is included within the schedule to allow for the equipment lead times. Will additional time be added to the contract to allow for extended lead times for equipment?
Answer
Solicitation Number:
Project Name:
Answer
Will there be a need for temporary cooling/conditioning? The drawings say that outage work shall be scheduled between November and March (and over the weekend) to mitigate impact on the users. (CES)
Question
Question
Answer
Will the government consider past performance of 50% complete or more similar from the Prime KTR as relevant?
Additionally can Key Members of the Prime KTR’s organization Past Performance be utilized as construction experience and past performance requirements for this solicitation? (CONS)
FA4418‐22‐R‐0002
Repair Child Development Center, Bldg 227
NOTICE TO OFFERORS
Any offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all offerors before the submission of their proposals. Oral explanations or instructions given before the award of a contract will not be binding. Answers to offeror questoins concerning a solicitation will be posted to sam.gov, if that information is necessary in preparing proposals or if the lack of it would be prejudicial to others.
3 DC‐/CT‐1 Outage: Ignore reference to November‐March work. Temporary conditioning will be required only if outside temperatures drop below 68°F (heating), or rise above 78°F (cooling), and the outage continues into occupied hours.
OAU‐1 Outage: Ignore reference to November‐March work. The OAU provides neutral air (no temperature control), so the outage will mean the building is without ventilation air and dehumidification. This outage shall take place entirely during the weekend if possible, and will not require temporary conditioning. Per the drawing note 5 on M101, the work shall take no longer than 10 days.
Answer
Past performance of 50% complete or more similar from the Prime Ktr would be considered recent if performed within the last five years from the issue date of this solicitation. Please see Section L, page 54 of the solicitation.
Relevancy is evaluated based on the scope and magnitude of effort and complexities this solicitation requires. Please see Section M, page 63 of the solicitation for the “primary efforts required for this solicitation” and Section M, page 64 for the
“Past Performance Relevancy Ratings.”
Per Section L, page 55 of the solicitation “The evaluation of past performance information will take into consideration past performance information regarding predecessor companies, key personnel who have relevant experience, or subcontractors that will perform major or critical aspects of the requirement when such information is relevant to the instant acquisition.” However, per Section M, page 64, “Past performance regarding predecessor companies, key personnel who have relevant experience, or subcontractors that will perform major or critical aspects of the requirement will not be considered as highly as past performance information for the principal offeror.”
Question
Specification Reference (Section & Paragraph
Reference, i.e. 23 00 00, para 1.3)
Drawing Reference (Sheet and Detail or Note Reference, i.e.
M‐101, Detail 2)
Solicitation Reference (Section, paragraph, sub‐ paragraph Reference, i.e.
Section M, Paragraph 2.3)
Attachments or Other (i.e. Submittal Register, Wage Determination, Site Visit Note, etc.)
Solicitation Number:
Project Name:
FA4418‐22‐R‐0002
Repair Child Development Center, Bldg 227
NOTICE TO OFFERORS
Any offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all offerors before the submission of their proposals. Oral explanations or instructions given before the award of a contract will not be binding. Answers to offeror questoins concerning a solicitation will be posted to sam.gov, if that information is necessary in preparing proposals or if the lack of it would be prejudicial to others.
A120A ‐ A120C, note 9.02
M001, General HVAC Notes
01 14 00, 1.2.2
01 14 00, 1.2.2 G001
01 78 00, 3.2, 3.3
01 78 00, 3.3.1
01 14 00 Work Restrictions / para. 1.2.2
Question
Please confirm whether contractor will be responsible for producing CAD files as part of the as‐built record drawings.
Answer
Yes, the final record drawing package shall include PDF and CAD files, per para. 3.3.1.
Question Working hours are specifically designated in 1.2.2; however there was discussion during the pre‐bid meeting that work would be allowed on the exterior of the building and in the mechanical and electrical rooms during normal working hours.
Please provide clarification to M‐F work hours from 0700 and 1600.
Question
Note 2, General HVAC Notes, states that contractor is to obtain permits from AHJ. Please confirm that the AHJ is the public works office and there are no permits needed, other than those listed in specification 01 14 00, 1.3.7.
Answer
Correct. The 628 CES is the AHJ, and permits shall be aquired as needed according to section 01 14 00, para. 1.3.7.
Question
Will the exterior work be allowed to proceed during daylight hours if desired? This will minimize the safety concerns of outdoor work at night.
Answer
Yes, daylight hours will be permitted for exterior work (Construction Work Zone 4). To further clarify:
G001/ACCESS/OCCUPANCY/Note 2: Disregard. Working hours shall be 1830 (6:30 pm) to 0600 (6:00 am) per section 01 14
00, para 1.2.2.
G001/COORDINATION/CONSTRUCTION WORK ZONES/Note 2: ELEC. 131 shall also be considered Work Zone 4.
Additional time will be considered to allow for extended equipment lead times if the Contractor provides letters from at least 3 approved (specified) manufacturers stating that equipment lead times are unusually long (i.e., supply chain issues).
Question Drawings state to paint all wall in room to match existing color. There are numerous photos, bulletin boards, etc hung on the walls of the cooridors. Who will be responsible for removing all of these items? Will the patching of the walls from the holes created by those items be the responsibility of the contractor?
Answer
In the 3 storage rooms where ladders are being installed (STORAGE 124, STOR. 149, and STOR. 150), the Government will be responsible for removing all contents (stored items), and the Contractor shall be responsible for removal and reinstallation of anything attached to the walls in order to paint (shelving/brackets). The Contractor shall be responsible to patch the walls as needed where brackets won't be reinstalled (i.e., where the ladders are installed.
In the corridors, the Government will remove all pictures, artwork, posters, etc. Most of these items are taped or stapled to the walls. Large bulletin boards and room number signs will remain and the Contractor will protect and paint around them. Wall repair of small holes and peeling paint shall be the responsibility of the Contractor.
Specification Reference (Section & Paragraph
Reference, i.e. 23 00 00, para 1.3)
Drawing Reference (Sheet and Detail or Note Reference, i.e.
M‐101, Detail 2)
Solicitation Reference (Section, paragraph, sub‐ paragraph Reference, i.e.
Section M, Paragraph 2.3)
Attachments or Other (i.e. Submittal Register, Wage Determination, Site Visit Note, etc.)
Solicitation Number:
Project Name:
FA4418‐22‐R‐0002
Repair Child Development Center, Bldg 227
NOTICE TO OFFERORS
Any offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all offerors before the submission of their proposals. Oral explanations or instructions given before the award of a contract will not be binding. Answers to offeror questoins concerning a solicitation will be posted to sam.gov, if that information is necessary in preparing proposals or if the lack of it would be prejudicial to others.
A120 detail 1
M100
E200
E002
Section M ‐ Evaulation Criteria
Question
Question
As per DWG E200 Equipment connection Schedule CU‐1 which is specified as Desert Air Model RCS021C is to be provided with a 30A 3phase Disconnect switch with #12 conductors in conduit, the same unit is shown on Panel MDP connected to
15A trip. Do this need a Disconnect with setting of 15A trip. please clarify
Answer
No, the equipment connection schedule calls for a 30A Non‐Fused Nema 4X Disconnect.
Question
When the Government initially ranks the offers described in FACTOR 1 PRICE EVALUATION ‐ will the evaluators whom are evaluating FACTOR II PAST PERFORMANCE/EXPERIENCE‐ have knowledge of whose proposals are the lowest priced? If so, then what would prevent the Evaluators from rating a firm as SUBSTANTIAL CONFIDENCE knowing they have the lowest price? Will the Technical evaluators be independent from the Price Evaluators?
Answer
At the time of price evaluation, the company/vendor names are not provided to the evaluation team. Proposals are labeled, "A, B, C, etc." The proposals will be evaluated on price and past performance with past performance being significantly more important than price. There are no technical factors to be evaluated for this solicitation.
Question
Will the Govt./Facility remove all materials from rooms 124, 149 and 150?
Answer
Refer to answer #5.
Question
As per Key note 6 modifications are needed to be performed at underground HDPE piping & exsiting piping arrangements need to be renovated for energy efficieny. Please provide as constructed plans for the system so as to study and propose most efficient system arrangement.
Answer
The keynote is describing the modification that has been drawn. The plans show the designer's best understanding of the existing system based on as‐built drawing MS101. MS101 has been attached for reference. Price assuming the existing system arrangement is generally true to the design drawing. The awarded Contractor will be required field verify the existing piping arrangement (per Note 6) and, if necessary, notify the Government of differing site conditions, per FAR
Clause 52.236‐2.
Answer
Refer to answer #7.
Specification Reference (Section & Paragraph
Reference, i.e. 23 00 00, para 1.3)
Drawing Reference (Sheet and Detail or Note Reference, i.e.
M‐101, Detail 2)
Solicitation Reference (Section, paragraph, sub‐ paragraph Reference, i.e.
Section M, Paragraph 2.3)
Attachments or Other (i.e. Submittal Register, Wage Determination, Site Visit Note, etc.)
Solicitation Number:
Project Name:
FA4418‐22‐R‐0002
Repair Child Development Center, Bldg 227
NOTICE TO OFFERORS
Any offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all offerors before the submission of their proposals. Oral explanations or instructions given before the award of a contract will not be binding. Answers to offeror questoins concerning a solicitation will be posted to sam.gov, if that information is necessary in preparing proposals or if the lack of it would be prejudicial to others.
Section M ‐ Evaulation Criteria
Section M ‐ Evaulation Criteria
General Solicitation
M002 (Notes 2 & 3) E002 (equipment schedule)
01 30 00, para 1.5.1 23 09 23.13 20, para1.2.10
Question We kindly request an bid submittal extension of at least one week after all RFI responses are issued. This will allow contractors time to review answered questions and provide an updated proposal that results in the best overall value to the government and taxpayer?
Answer
See amendment for updated proposal deadline.
Question
Answer
Correct. The controls Contractor provides the VFDs only; pumps and fans are to be provided by the mechanical Contractor (installed by the electrical Contractor).
Yes. See question for answer.
Question
Please confirm the controls contractor is only providing the VFDs for these devices, and not the pumps or the fans themselves, as the notes on M‐002 indicate.
Answer
Question
Spec section 1.5.1 in Section 01 30 00 requires controls to bid to first tier contractors and spec section 1.2.10 in Section 23 09 23.13 20 requires connection to Trane system. Can you please include contact information for Peter Green, Trane Controls, peter.green@trane.com, (843) 693‐4499 so any first tier bidders will know who to contact for this portion of work?
Although FACTOR II paragraph D ( should be E) discusses all of the possible ratings from Substantial Confidence to No Confidence it is apparent by the language in paragraph (f) that ONLY Substantial Confidence is eligible to receive the
AWARD? Is that the correct assumption? In the unlikely event that NO offers have been rated SUBSTANTIAL CONFIDENCE will the process restart and the Government will go to the Next Level which is SATISFACTORY CONFIDENCE and award to the Lowest Price SATISFACTORY CONFIDENCE? Or will the process stop and no award made?
Answer
Yes, the Government will go to the next level of SATISFACTORY CONFIDENCE if SUBSTANTIAL CONFIDENCE is not reached.
The process will not stop.
Question
Can we assume the firms whose price was determined to be unreasonable or unrealistic in FACTOR I will be notified immediately that they were eliminated from competition and their TECHNICAL PROPOSAL will not be evaluated?
Answer
Technical proposals are not required for this solicitation. The proposals will be evaluated on price and past performance with past performance being significantly more important than price.
Specification Reference (Section & Paragraph
Reference, i.e. 23 00 00, para 1.3)
Drawing Reference (Sheet and Detail or Note Reference, i.e.
M‐101, Detail 2)
Solicitation Reference (Section, paragraph, sub‐ paragraph Reference, i.e.
Section M, Paragraph 2.3)
Attachments or Other (i.e. Submittal Register, Wage Determination, Site Visit Note, etc.)
Solicitation Number:
Project Name:
FA4418‐22‐R‐0002
Repair Child Development Center, Bldg 227
NOTICE TO OFFERORS
Any offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all offerors before the submission of their proposals. Oral explanations or instructions given before the award of a contract will not be binding. Answers to offeror questoins concerning a solicitation will be posted to sam.gov, if that information is necessary in preparing proposals or if the lack of it would be prejudicial to others.
E‐101, E‐103, E‐103
01 14 00, para 1.2.2 Section H
23 05 15.3.9
SOW
SOW
M101, General Note No. 624
Question
Confirm that we don’t have to perform any pre‐testing of the air and water systems serving any of the existing equipment.
The only pre‐test to be performed is for the existing OAU per Sheet M101, General Note No. 6
Answer
Question
Confirm that we are not required to clean existing duct.
Answer
There is no requirement to clean existing ductwork.
Question
Confirm that we are not to replace existing flex duct to the grilles/diffusers.
Answer
New flex duct is only required where a new duct run and diffuser is shown. Where existing diffusers are being removed, cleaned, and reinstalled, existing flex duct can be reused.
Question Section H states that regular working hours are between 1830 and 0600 Monday ‐ Friday, excluding government holidays.
Will the contractor be allowed to work during normal working hours for areas outside of the CDC that won't interfere with the staff and children?
Answer
Refer to answer #7.
Question
The water in the closed loop from the cooling tower to the building will need to be flushed per Spec Section 23 05 15.3.9 – Disinfection. It our experience that the pipe systems should be flushed and chemical treated with rust inhibitors. The specifications do not require any chemical flush or treatment. Confirm that we are only to flush the system with clean water and no other chemicals are to be introduced into the system.
Answer
Flush the system only as indicated in the specifications. The underground piping is HDPE and will not need rust inhibitors.
The Keynotes on drawings E‐101, 102, 103 indicate that the existing 2' x 2' Troffer lights and Exit sign lights are to be removed and replaced. Since the ceiling grid will also be removed and the ceiling left open while the new platforms and
HVAC work is being done will temporary lighting and exit signage be required?
Answer
Yes. The corridors need to be completely lit, clean and clear of construction equipment/debris, and provided with safety signs/devices during occupied hours. How the Contractor decides to sequence ceiling/device removal with above ceiling work is means and methods and is not dictated by the drawings and specifications.
Specification Reference (Section & Paragraph
Reference, i.e. 23 00 00, para 1.3)
Drawing Reference (Sheet and Detail or Note Reference, i.e.
M‐101, Detail 2)
Solicitation Reference (Section, paragraph, sub‐ paragraph Reference, i.e.
Section M, Paragraph 2.3)
Attachments or Other (i.e. Submittal Register, Wage Determination, Site Visit Note, etc.)
Solicitation Number:
Project Name:
FA4418‐22‐R‐0002
Repair Child Development Center, Bldg 227
NOTICE TO OFFERORS
Any offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all offerors before the submission of their proposals. Oral explanations or instructions given before the award of a contract will not be binding. Answers to offeror questoins concerning a solicitation will be posted to sam.gov, if that information is necessary in preparing proposals or if the lack of it would be prejudicial to others.
23 05 93, para 1.3 M101 (General Note
6)
23 05 48.00 40, para 2.1.1.2 M002, Detail 1
SOW
M001, General HVAC Note No. 17
M001
M001, General HVAC Note No. 16
SOW
Question
Question
General HVAC Note No. 17: Are there any existing roof mounted equipment/duct that will require seismic restraints and wind load protection per Note No. 17? Or is this note intended for new equipment only?
Answer
Note applies to new work only.
Question
Provide the control vendor that services this system currently.
Answer
Refer to Question #18.
Question
Confirm that we are to fire seal new penetrations only. Confirm that we will not be required to correct deficiencies in existing penetrations. If we are required to seal existing penetrations, and since we don’t know if or the extent of these deficiencies, should we include an allowance for corrections or will they be added to our contract through modification.
Answer The Contractor shall only be responsible for firestopping penetrations associated with this scope of work. That includes penetrations left empty if piping/ductwork/conduit is removed, as well as new penetrations. The Contractor will not be responsible for deficiencies unrelated to this work. If out‐of‐scope deficiencies are found, during construction, the Contractor should notify the Government.
Question
Per Sheet M001, General HVAC Note No. 17 states “that all exposed piping & ductwork shall be painted.” Confirm if this statement applies to new AND existing duct/pipe of just new duct/pipe.
Answer
There is no exposed ductwork or piping (new or existing). Disregard this note.
Correct. Pre‐test is only required for the OAU.
Question
Sheet M002, Detail 1 shows an enlarged housekeeping pad for the pumps (P‐1 & P‐2). Spec Section 23 05 48.00.2.1.1.2 – Bases states to “ensure pumps with flexible couplings do not have inertia bases less than 8” thick.” Confirm that the pumps will be set on housekeeping pads (per the drawings) and NOT on inertia bases (per the specifications).
Correct. Pumps shall be set on housekeeping pads per the drawings. Inertia bases are not required.
Specification Reference (Section & Paragraph
Reference, i.e. 23 00 00, para 1.3)
Drawing Reference (Sheet and Detail or Note Reference, i.e.
M‐101, Detail 2)
Solicitation Reference (Section, paragraph, sub‐ paragraph Reference, i.e.
Section M, Paragraph 2.3)
Attachments or Other (i.e. Submittal Register, Wage Determination, Site Visit Note, etc.)
Solicitation Number:
Project Name:
FA4418‐22‐R‐0002
Repair Child Development Center, Bldg 227
NOTICE TO OFFERORS
Any offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all offerors before the submission of their proposals. Oral explanations or instructions given before the award of a contract will not be binding. Answers to offeror questoins concerning a solicitation will be posted to sam.gov, if that information is necessary in preparing proposals or if the lack of it would be prejudicial to others.
Sheet M103, General Note No. 2
01 30 00, para 1.2 Sheet M103, General
Note No. 2
Sheet M201, General Note No. 1
SOW
Sheet E103, General Note No. 1
SOW
Question Is the extent of the seismic restraint installation requirements limited to NEW installations or are we required to add restraints to EXISTING devices and assemblies as well? If we are to add restraints to existing devices and the extent of this work is not shown in the drawings, should any restraints to existing devices/assemblies be treated as a contract modification after award?
Answer
Question
Are we allowed to demo the entire reflected ceiling in each zone at one time or will we required to demo smaller sections and replace?
Answer
Refer to answer #19. To expand on that answer, ceiling demo must be confined to a single Construction Work Zone at a time, per G001 Project Duration Chart and Construction Work Zones.
Question
Sheet E103, General Note No. 1 states to relamp the existing lighting fixtures. During our visit, the lights in the attic were not operating. Has the facility confirmed that all (30) fixtures are in operable condition? Should be include an allowance in case find defective lighting fixtures or will replacement of these devices be treated as a contract modification after award?
Answer
Assume all fixtures are operable and only need to be relamped. Defective fixtures would be treated as a contract modification after award.
Sheet M103, General Note No. 2 states to “Clean and reinstall existing diffusers in corridors….” It is our experience that cleaning existing diffusers have mixed success. Results vary and in some cases the end‐result is less than satisfactory.
Confirm that the intent is to clean and reinstall the air distribution devices.
Answer
Yes, the intent is to clean and reinstall existing diffusers per the note. It is unclear from the question why results may be less than satisfactory, but if it is a matter of devices being damaged during removal, cleaning, and reinstallation, please reference section 01 30 00, para 1.2 regarding a preconstruction survey. If, upon project commencement, there is reason to believe existing devices should not be reused, the Contractor shall bring those specific concerns with the Government.
Question
Sheet M201, General Note No. 1 states that this sheet is for reference only. Note Nos 2 & 3 state that the “existing conditions may have changed,” and that “not all utilities are modeled.” We were not allowed to inspect all attic spaces for existing obstructions or added utilities. Should we include an allowance to correct unforeseen issues or should that be addressed as contract modifications after the contract is awarded? These comments are typical in Sheet Nos. M202 and
M203
Answer
No changes have been made to the existing conditions through the attic since these images were taken. Do not include an allowance, all changes shall be addressed as a contract modification IAW FAR 52.236‐2 Differing Site Conditions.
Specification Reference (Section & Paragraph
Reference, i.e. 23 00 00, para 1.3)
Drawing Reference (Sheet and Detail or Note Reference, i.e.
M‐101, Detail 2)
Solicitation Reference (Section, paragraph, sub‐ paragraph Reference, i.e.
Section M, Paragraph 2.3)
Attachments or Other (i.e. Submittal Register, Wage Determination, Site Visit Note, etc.)
Solicitation Number:
Project Name:
FA4418‐22‐R‐0002
Repair Child Development Center, Bldg 227
NOTICE TO OFFERORS
Any offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all offerors before the submission of their proposals. Oral explanations or instructions given before the award of a contract will not be binding. Answers to offeror questoins concerning a solicitation will be posted to sam.gov, if that information is necessary in preparing proposals or if the lack of it would be prejudicial to others.
AD120
A120 A120A A120B A120C
G001 "Occupancy" Note 5
G001 "Project Duration Chart"
SOW
M100 Gen. Note 2
Question
Note 2 references requirements for outages as a result from demolition of DC‐1 and installing CT‐1 shall occur during the months of Nov.‐ Mar., yet the project will occur during the warm summer months.
Answer
Refer to answer #3.
Question
Question
Recently, the construction industry has been experiencing unpredictable lead times and delays when ordering equipment and materials. These conditions along with the requirement for HVAC turnovers to be conducted in the winter months may cause the project schedule to shift/extend past the "Project Duration Chart." Please confirm the government's expectation for changes in schedule. Will time extension modifications be awarded if the project is reasonable delayed due to supply chain issues?
Answer
Refer to answers #3 and #4.
Question
What is the user's expectation/requirement for temporary lighting between when the existing hallway lights are demolished (beginning of project) and when new lights are installed (end of project)?
Answer
Refer to answer #19.
Seismic restraint installation requirements apply to new and existing work within the scope of this project. Refer to Architectural drawings AD120 through A120C for annotated floor plans with "AREA NOT IN SCOPE OF WORK" to clearly see what is in and out of scope. Seismic restraint installation requirements shall include existing devices if they are a part of the scope (i.e., remove, clean, and reinstall), but shall not include existing devices that are not affected by this work.
Question
Per the note, the contractor is to relocate the existing cameras and ensure they are all working throughout the project.
Please provide any companies currently servicing/monitoring the cameras.
Answer
The servicing company is KBR. Contact Info: Brian Callahan (brian.callahan@us.kbr.com; 843‐274‐7518).
Ref. Dwg. E101 (Keynote 2), E102 (Keynote 1), E103 (Keynote 1) ‐ All ceiling mounted security devices (cameras) shown are existing to remain. All ceiling mounted cameras are to be supported in place and protected during renovation then reinstalled in new ceiling.
The Contractor shall be responsible for removing and reinstalling the cameras in the new ceiling tile. As part of their service contract (no additional cost), KBR will assist with training/direction, and final alignment/adjustment if needed.
Specification Reference (Section & Paragraph
Reference, i.e. 23 00 00, para 1.3)
Drawing Reference (Sheet and Detail or Note Reference, i.e.
M‐101, Detail 2)
Solicitation Reference (Section, paragraph, sub‐ paragraph Reference, i.e.
Section M, Paragraph 2.3)
Attachments or Other (i.e. Submittal Register, Wage Determination, Site Visit Note, etc.)
Solicitation Number:
Project Name:
FA4418‐22‐R‐0002
Repair Child Development Center, Bldg 227
NOTICE TO OFFERORS
Any offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all offerors before the submission of their proposals. Oral explanations or instructions given before the award of a contract will not be binding. Answers to offeror questoins concerning a solicitation will be posted to sam.gov, if that information is necessary in preparing proposals or if the lack of it would be prejudicial to others.
M100 General Notes
Section M, Paragraph 3 Section M, FACTOR II, (a)
G001
A120A44
Question
On sheet A120A it mentions having to remove and reinstall shelving. Will the governemtn be removing all the items off of these shevles and storing them outside the work area?
Answer
Refer to answer #5.
Question
Question
With current material delivery timelines, 180‐day duration is tight. Is the government open to issuing additional time to offset material delays?
Answer
Refer to answer #4.
Question
On Sheet G001, it shows the haul route, however, the Hual rroute notes (note 4 and 5) mention that the government could require a traffic control plan and/or flagman at no additional cost to the government. Being that the haul route has been defined, will they be requiring a TCP and Flagman for this defined haul route?
Answer
No. There is no reason to expect a TCP or flagmen will be needed for this project.
Question
To clarify, will the Government accept Past Performance Questionnaire's (PPQ's) that include the evaluation of past performance information as shown in Section L, Part II, 3., b., on recent, relevant past performances that have not yet received the CPARS rating from the government?
Answer
Yes.
Question
For past performance requirements, will the Government accept a “recent” fully designed project where the construction is at least 50% complete (measured by performance period days) as of the solicitation issue date?
Answer
Yes.
If HVAC outages are necessary during installation of new equipment, will temporary cooling be required? Should this be carried in the bid?
Refer to answer #3.
Specification Reference (Section & Paragraph
Reference, i.e. 23 00 00, para 1.3)
Drawing Reference (Sheet and Detail or Note Reference, i.e.
M‐101, Detail 2)
Solicitation Reference (Section, paragraph, sub‐ paragraph Reference, i.e.
Section M, Paragraph 2.3)
Attachments or Other (i.e. Submittal Register, Wage Determination, Site Visit Note, etc.)
Solicitation Number:
Project Name:
FA4418‐22‐R‐0002
Repair Child Development Center, Bldg 227
NOTICE TO OFFERORS
Any offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all offerors before the submission of their proposals. Oral explanations or instructions given before the award of a contract will not be binding. Answers to offeror questoins concerning a solicitation will be posted to sam.gov, if that information is necessary in preparing proposals or if the lack of it would be prejudicial to others.
01 50 00
AD120; Note D01 & D10
01 11 00; para 1.1.1 Project Description
Sheet C400
01 57 19.00 31
Question
Sheet C400 calls for new water and sewer line to be excavated and installed; however, there is no silt fence or erosion contorl measures shown. Will any erosion control be required?
Answer
No Land disturbance permit or approved storm water pollution prevention plan required for this project.
Question
Sheet AD120 Shows Keynote D01 & D10 in one room in wing A, Those notes are not inculded in the rooms of wing B, and C. Will the same work be required in those areas?
Answer
No. Ladders are attached to CMU wall at wings B & C.
Question
Specification Section 01 10 00, Para 1.1.1 Project Description states contractor shall not work duting normal operating hours, and the facility shall be fully clear of any materials and tools before reopening the next day. What are the normal operating hours for the facility? Can the exterior work be done during normal hours?
Answer
Refer to answer #7.
Question
Will a Revised schedule be sent out confirming what items will require night and weekend work, i.e. Ladder install, Mechanical/electrical room work and cooling tower installation? It was mentioned during the site visit that some of the work may be perfromed during the day during the week.
Answer
Refer to answer #7.
Question
There is not a section requesting that lamdscaping be done after the installation of the cooling tower. Will the GC be responsible for this or is the governemnt going to take care of this?
Answer
There is no landscaping requirement beyond maintenance of grass/grounds during construction, and restoration of the site after construction is complete.
Does the Governemtn have an idea as to when the project may be funded since funds are not currently available? This could cause issues with continuing cost escalations of Steel and HVAC/Electrical Equipment.
Answer
Per the Solicitation Page 1, Box 13.d, the Government intends for funds to be availabile within 90 calendar days of receipt of proposals.
Specification Reference (Section & Paragraph
Reference, i.e. 23 00 00, para 1.3)
Drawing Reference (Sheet and Detail or Note Reference, i.e.
M‐101, Detail 2)
Solicitation Reference (Section, paragraph, sub‐ paragraph Reference, i.e.
Section M, Paragraph 2.3)
Attachments or Other (i.e. Submittal Register, Wage Determination, Site Visit Note, etc.)
Solicitation Number:
Project Name:
FA4418‐22‐R‐0002
Repair Child Development Center, Bldg 227
NOTICE TO OFFERORS
Any offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all offerors before the submission of their proposals. Oral explanations or instructions given before the award of a contract will not be binding. Answers to offeror questoins concerning a solicitation will be posted to sam.gov, if that information is necessary in preparing proposals or if the lack of it would be prejudicial to others.
01 45 00 Para3.2.4 b.
01 57 19.00 31 Para3.4.1
M100 General Note 2
Question
Will Negative air be expected to minimize dust while working in each wing overhead corridors?
Answer
Question
The contract documents states that work effecting the Heating and cooling should be done between Nov & Mar. Since this is Feb and this soliciation requires the contractor to hold his price for 180 days, this puts the potential for award in Aug or
Sept. Shoud the contractor plan to meet this HVAC performance requirement, or would the government consider an option on this bid for temporary A/C or Heat as would be required for work outside of that window of time?
Answer
Refer to answer #3.
Question Since this project is a CDC what would be an acceptable fluctuation in Outside Air Temp be if replacement of key units on this project were to be down for a week or two? If completed in winter months as required, who will decide when the temp is acceptabel to start work?
Answer
Refer to answer #3.
Question
Spec 3.2.4 b. Contractor licenses states "A list of responsible license holders and license numbers of the following trades:
Air Conditioning, Electrical, Heating, and Plumbing." Is the General Contractor required to be licensed in Sout Carolina?
Answer
No.
Question Spec 01 57 19.00 31 Para 3.4.1 Storm Water Pollution Prevention Plan states" The Contracting officer has obtained a Land Distrurbance Permit from SCDHEC and an approved Storm Water Pollution Prevention Plan." Is this a requirement for this project?
Answer
No Land disturbance permit or approved storm water pollution prevention plan required for this project.
Question
Specs say the building will be occupied during construction. Is there any requirement for temporary heating or A/C during construction?
Refer to answer #3.
Specification Reference (Section & Paragraph
Reference, i.e. 23 00 00, para 1.3)
Drawing Reference (Sheet and Detail or Note Reference, i.e.
M‐101, Detail 2)
Solicitation Reference (Section, paragraph, sub‐ paragraph Reference, i.e.
Section M, Paragraph 2.3)
Attachments or Other (i.e. Submittal Register, Wage Determination, Site Visit Note, etc.)
Solicitation Number:
Project Name:
FA4418‐22‐R‐0002
Repair Child Development Center, Bldg 227
NOTICE TO OFFERORS
Any offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all offerors before the submission of their proposals. Oral explanations or instructions given before the award of a contract will not be binding. Answers to offeror questoins concerning a solicitation will be posted to sam.gov, if that information is necessary in preparing proposals or if the lack of it would be prejudicial to others.
02 41 00, para. 1.6.1
G001
23 05 93, para. 1.3 M101, Gen. Note 7
Section L, 3.a , page 54
Section L,3.b, page 54
23 09 23.13 20, para 1.2.10 M101, Keynote 6 Question
Question
In addition to the 3‐page limit for the project information, does the Government require a PPQ for each of the five projects requrested in Section L, 3.a?
Answer
PPQ are not required, however, please see paragraph 3a, Part II ‐ Past Performance Information, Section L of the solicitation for types of information that can be submitted.
Question
Is the existing equipment governed by DDC controls? Who is the preferred manufacturer, JCI or Simmens?
Answer
Yes. Trane is the BAS Owner. Replacement controller shall be Trane SC+.
Question
Are the letters, metrics, and independent surveys included in the 3 pages per contract limit?
Answer
No.
TAB is required on new and existing equipment. There is no requirement to recommission existing heat pumps.
Question
Is there any requirement to recommission the existing heat pump units? Once the new system controller is in place, we may find that some of the existing and remaining heat pump unit controllers are either not communicating or not functioning properly. Please clarify what the responsibilities of the controls provider will be to straighten those out.
Answer
Per Specification Section 02 41 00 Demolition, paragraph 1.3.1 Existing Construction Limits and Protection, The Contractor is responsible to provide protective measures to control accumulation and migration of dust and dirt in all work areas. Remove dust, dirt, and debris from work areas daily.
Question
Will each wings ceilings need to be covered at the end of each working period or will the ceilings be allowed to be left open until the work in each wing is complete?
Yes. See G001/OCCUPANCY/Note 3.
Specification Reference (Section & Paragraph
Reference, i.e. 23 00 00, para 1.3)
Drawing Reference (Sheet and Detail or Note Reference, i.e.
M‐101, Detail 2)
Solicitation Reference (Section, paragraph, sub‐ paragraph Reference, i.e.
Section M, Paragraph 2.3)
Attachments or Other (i.e. Submittal Register, Wage Determination, Site Visit Note, etc.)
Solicitation Number:
Project Name:
FA4418‐22‐R‐0002
Repair Child Development Center, Bldg 227
NOTICE TO OFFERORS
Any offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all offerors before the submission of their proposals. Oral explanations or instructions given before the award of a contract will not be binding. Answers to offeror questoins concerning a solicitation will be posted to sam.gov, if that information is necessary in preparing proposals or if the lack of it would be prejudicial to others.
What are the working hours?
Answer
Refer to answer #7.
Question
What are the emergency protocols for a lockdown situation?
Answer
This will be addressed at the Pre‐Construction Conference.
Question
How would you like proposals delivered?
Answer
Per Section L, Instructions, Conditions, and Notices to Offerors or Quoters, "Offerors shall submit proposals via DoD SAFE at https://safe.apps.mil. Please contact the Contracting Specialist to confirm your email address. Once your email address is confirmed you will receive an email request drop off password to upload your files. Contractors are cautioned to request a DoD SAFE drop off password from the Contracting Specialist well in advance; a drop‐off request is valid for 14 days. The Government will not be responsible for interruptions in communications, which cause delays. Late proposals will be processed in accordance with the provisions of FAR 52.215‐1(c)(3), "Submission, modification, revision, and withdrawal of proposals." The Contracting Officer will accept modifications and revisions via DoD SAFE as well."