This submittal register outlines 281 items required from a contractor to repair a child development center at Joint Base Charleston. The contractor must provide preconstruction submittals within 45 days of the notice to proceed, including an accident prevention plan, activity hazard analyses, and qualifications. Shop drawings, product data, samples, design data, test reports, and manufacturer's instructions are also required at various stages for items like sealants, access panels, backflow preventers, ductwork, and mechanical, electrical, and plumbing systems. Closeout submittals like as-built drawings, warranties, and operation and maintenance manuals are due prior to final inspection. The solicitation number for the project is FA441815D0006/FA441819FA053 to improve building systems and reduce temperatures at the 34,400 square foot facility constructed in 2010 at Air Force Mobility Command.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Repair Child Development Center, Bldg.227 at
Joint Base Charleston – Air Base North Charleston, South Carolina
Charleston County
AF Form 66
November 21, 2019 100% Design Submittal
Project Manager: Greg Jones, P.E.
gregj@adcengineering.com JBC Project No. DKFX 18-1073030 ADC Project No. 19070
11/21/2019
PROJECT NUMBER
DKFX 18-1073030
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
01 11 00, Para 1.6.2, "Outage Requests"; G
01 11 00, Para 1.6.2, "Road
Closure Requests"; G
01 11 00, Para 1.6, "Work
Clearance"; G
01 14 00, Para 1.2.1.1, "List of Contact Personnel"; G
01 30 00, Para 1.2, "View
Location Map"; G
01 30 00, Para 1.3, "Progress and Completion
Pictures"; G
01 30 00, Para 1.6.2, "Resume for the proposed
Superintendent"; G
01 32 16.00 20, Para 1.2, "Qualifications"; G
01 32 16.00 20, Para 1.3, "Project Schedule"; G
01 32 16.00 20, Para 1.4.1, "Initial Contract Progress
Report (AF IMT 3065)"; G
01 32 16.00 20, Para 1.4.2, "Initial Contract Progress
Schedule (AF IMT 3064)"; G
01 32 16.00 20, Para 1.3.3, "Project Schedule Updates";
G
01 32 16.00 20, Para 1.4.1, "Monthly Contract Progress
Reports (AF IMT 3065)"; G
01 32 16.00 20, Para 1.4.2, "Monthly Contract Progress
Schedules (AF IMT 3064)";
G
01 33 00, Para 1.6, "Submittal Register"; G
PROJECT TITLE
Repair Child Development Center, B.227
SOLICITATION/CONTRACT NO. FA441815D0006 /
FA441819FA053
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N C
E
D A
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
L
R
P O
R T
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
'S
IN
S
T R
U C
T
IO
N S
L
I
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
IO
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
DKFX 18-1073030
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
Repair Child Development Center, B.227
SOLICITATION/CONTRACT NO. FA441815D0006 /
FA441819FA053
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
L
I
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
01 35 26, Para 1.6, "Accident
Prevention Plan (APP)"; G
01 35 26, Para 1.7, "Activity
Hazard Analysis (AHA)"; G
01 35 26, Para 1.6.1.1, "Critical Lift Plan"; G
01 35 26, Para 1.5.1.3, "Crane Operators"; G
01 35 26, Para 1.11, "Notifications and Reports"
01 35 26, Para 1.11.2, "Accident Reports"; G
01 35 26, Para 1.11.3, "Crane Reports"
01 35 26, Para 1.8.1, "Confined Space Entry
Permit"
01 35 26, Para 1.8.1, "Hot
Work Permit"
01 35 26, Para 1.13, "License Certificates"
01 45 00, Para 1.6, "QC
Plan"; G
01 50 00, Para 1.3, "Construction Site Plan"; G
01 50 00, Para 3.4.1, "Traffic
Control Plan"; G
01 50 00, Para 1.4, "Backflow Preventers"
01 50 00, Para 2.2.5, "Backflow Preventer Tests"
01 50 00, Para 1.4.1, "Backflow Tester"
01 50 00, Para 1.4, "Backflow Preventers"
01 54 00.00 31, Para 1.5.2.1, "Affirmative Procurement
Reporting Form"; G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 18-1073030
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
Repair Child Development Center, B.227
SOLICITATION/CONTRACT NO. FA441815D0006 /
FA441819FA053
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
L
I
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
01 57 19.00 31, Para 1.7.1, "Preconstruction Survey"; G
01 57 19.00 31, Para 1.8.3, "Regulatory Notifications"; G
01 57 19.00 31, Para 1.5, "Environmental Protection
Plan"; G
01 57 19.00 31, Para 1.6, "Dirt and Dust Control Plan";
G
01 57 19.00 31, Para 3.9.2, "Disposal Requirements"
01 57 19.00 31, Para 1.8.4, "Erosion and Sediment
Control Inspection Reports"
01 57 19.00 31, Para 3.4, "Erosion and Sediment
Control Inspection Reports"
01 57 19.00 31, Para 3.4, "Storm Water Inspection
Reports for General Permit"
01 57 19.00 31, Para 1.8.5, "Solid Waste Disposal
Report"; G
01 57 19.00 31, Para 1.8.2, "Contractor 40 CFR employee training records";
G
01 57 19.00 31, Para 3.4.2, "Storm Water Pollution
Prevention Plan compliance notebook"; G
01 57 19.00 31, Para 1.8, "Waste Determination
Documentation"
01 57 19.00 31, Para 3.7.2, "Waste Determination
Documentation"
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 18-1073030
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
Repair Child Development Center, B.227
SOLICITATION/CONTRACT NO. FA441815D0006 /
FA441819FA053
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
L
I
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
01 57 19.00 31, Para 1.8.1, "Disposal Documentation for
Hazardous and Regulated
Waste"
01 57 19.00 31, Para 1.8.2, "Contractor 40 CFR
Employee Training Records"
01 57 19.00 31, Para 1.7.2, "Solid Waste Disposal
Permit"
01 57 19.00 31, Para 1.8.5, "Solid Waste Disposal
Report"
01 57 19.00 31, Para 3.7.2, "Hazardous Waste/Debris
Management"
01 57 19.00 31, Para 1.8.3, "Regulatory Notifications"
01 57 20.00 31, Para , "Material Safety Data Sheets
(MSDS)"
01 57 20.00 31, Para 1.8, "Green Procurement"
01 57 20.00 31, Para 1.8, "Green Procurement"
01 57 20.00 31, Para 1.3, "Recycling Report"
01 57 20.00 31, Para 1.3, "Recycling Report"
01 74 19.00 31, Para 1.3.3, "Construction Waste
Management Plan"; G
01 78 00, Para 1.5.1, "Warranty Management
Plan"
01 78 00, Para 1.5.4, "Warranty Tags"
01 78 00, Para 1.4, "Spare
Parts Data"
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 18-1073030
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
Repair Child Development Center, B.227
SOLICITATION/CONTRACT NO. FA441815D0006 /
FA441819FA053
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
L
I
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
01 78 00, Para 3.9, "Preventative Maintenance"
01 78 00, Para 3.9, "Condition Monitoring"
01 78 00, Para 3.9, "Inspection"
01 78 00, Para 1.5.1, "Instructions"
01 78 00, Para 3.7, "Operation and Maintenance
Manuals"; G
01 78 00, Para 3.1, "As-Built
Drawings"; G
01 78 00, Para 3.3, "Record
Drawings"; G
01 78 00, Para 3.6, "As-Built
Record of Equipment and
Materials"
01 78 00, Para 3.4, "Final
Approved Shop Drawings"
01 78 00, Para 3.5, "Construction Contract
Specifications"
01 78 00, Para 3.1, "Interim
DD FORM 1354"; G
01 78 00, Para 3.1, "Checklist for DD FORM
1354"; G
02 41 00, Para 1.2.1, "Demolition Plan"; G
02 41 00, Para 1.1, "Existing
Conditions"
02 41 00, Para 1.6, "Notification"; G
02 41 00, Para 3.2.2, "Receipts"
78 05 40 00, Para 2.1, "Studs
05 40 00, Para 2.1, "Recycled Content of Steel
Products"
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 18-1073030
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
Repair Child Development Center, B.227
SOLICITATION/CONTRACT NO. FA441815D0006 /
FA441819FA053
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
L
I
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
05 40 00, Para 1.4, "Load-
Bearing Cold-Formed Metal
Framing"
06 10 00, Para 1.5, "Fire-retardant Treatment"
06 10 00, Para 1.4.2, "Structural-use and OSB
Panels"
06 10 00, Para 2.2, "Oriented
Strand Board"
07 92 00, Para 2.1, "Sealants"; G
07 92 00, Para 2.2, "Primers"; G
07 92 00, Para 2.3, "Bond
Breakers"; G
07 92 00, Para 2.4, "Backstops"; G
08 31 00, Para 1.3, "Access
Panels"; G
08 31 00, Para 1.3, "Access
Panels"; G
08 31 00, Para 1.3.2, "Hardware"; G
08 31 00, Para 2.1.6, "Accessories"; G
08 31 00, Para 2.4, "Finishes"; G
08 31 00, Para 1.3.1, "Fire-rating(s) of Assemblies"; G
09 22 00, Para 2.1, "Metal support systems"; G
09 29 00, Para 1.3, "Certifications"; G
09 29 00, Para 2.2.1, "Gypsum Board"; G
09 29 00, Para 2.2, "Asbestos Free Materials"; G
09 29 00, Para 1.3.1, "Indoor
Air Quality"; G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 18-1073030
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
Repair Child Development Center, B.227
SOLICITATION/CONTRACT NO. FA441815D0006 /
FA441819FA053
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
L
I
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
09 29 00, Para 2.2.1, "Indoor
Air Quality for Gypsum
Board"; G
09 29 00, Para 2.2.2, "VOC
Content of Joint Compound";
G
09 51 00, Para 2.1, "Approved Detail Drawings";
G
09 51 00, Para 2.1, "Acoustical Ceiling Systems";
G
09 51 00, Para 2.2, "Acoustical Units"; G
09 51 00, Para 2.2.1.1, "Acoustical Ceiling Tiles"; G
09 90 00, Para 3.1, "Piping identification"
106 09 90 00, Para 3.1, "stencil" 5
09 90 00, Para 2.1, "Coating"; G
09 90 00, Para 2.1, "Manufacturer's Technical
Data Sheets"
09 90 00, Para 1.9, "Color";
G
09 90 00, Para 1.3, "Applicator's qualifications"
09 90 00, Para 1.4.1.2, "Qualification Testing"; G
09 90 00, Para 3.6.1, "Application instructions"
09 90 00, Para 3.6.2, "Mixing"
09 90 00, Para 1.7.2, "Manufacturer's Material
Safety Data Sheets"
09 90 00, Para 2.1, "Coatings:"; G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 18-1073030
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
Repair Child Development Center, B.227
SOLICITATION/CONTRACT NO. FA441815D0006 /
FA441819FA053
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
L
I
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
22 00 00, Para 3.5.1.1, "Backflow Prevention
Assemblies"; G
117 22 00 00, Para 3.5, "Tests
22 00 00, Para 3.5.1.1, "Test of Backflow Prevention
Assemblies"; G
22 00 00, Para 1.3, "Materials and Equipment"
120 22 00 00, Para 2.1.1, "Bolts" 5
22 00 00, Para 3.5.1, "Plumbing System"; G
23 00 00, Para 2.8.1.1, "Metallic Flexible Duct"
23 00 00, Para 2.8.1.2, "Duct
Connectors"
124 23 05 15, Para 1.2, "Material
23 05 15, Para 1.2, "Record
Drawings"
23 05 15, Para 1.2, "Connection Diagrams"
23 05 15, Para 3.1, "Installation Drawings"; G
23 05 15, Para 2.1, "Pipe and Fittings"
23 05 15, Para 2.2, "Piping
Specialties"
130 23 05 15, Para 2.3, "Valves" 5
23 05 15, Para 2.4, "Miscellaneous Materials"
23 05 15, Para 2.5, "Supporting Elements"
23 05 15, Para 2.1, "Pipe and Fittings"
23 05 15, Para 2.2, "Piping
Specialties"
135 23 05 15, Para 2.3, "Valves" 5
23 05 15, Para 3.1, "Hydrostatic Tests"
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 18-1073030
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
Repair Child Development Center, B.227
SOLICITATION/CONTRACT NO. FA441815D0006 /
FA441819FA053
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
L
I
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
23 05 15, Para 3.1, "Air
Tests"
23 05 15, Para 3.1, "Valve-
Operating Tests"
23 05 15, Para 3.1, "Drainage Tests"
23 05 15, Para 3.1, "Pneumatic Tests"
23 05 15, Para 3.1, "Non-
Destructive Electric Tests"
23 05 15, Para 3.1, "System
Operation Tests"
23 05 15, Para 1.4.2, "Record of Satisfactory Field
Operation"
23 05 15, Para 1.4.3, "List of
Qualified Permanent Service
Organizations"
23 05 15, Para 1.2, "Records of Existing Conditions"
23 05 15, Para 3.1, "Surface
Resistance"
23 05 15, Para 3.1, "Shear and Tensile Strengths"
23 05 15, Para 3.1, "Temperature Ratings"
23 05 15, Para 3.1, "Bending
Tests"
23 05 15, Para 3.1, "Flattening Tests"
23 05 15, Para 3.1, "Transverse Guided Weld
Bend Tests"
23 05 15, Para 3.1, "Operation and Maintenance
Manuals"
23 05 48.00 40, Para 1.2, "Installation Drawings"
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 18-1073030
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
Repair Child Development Center, B.227
SOLICITATION/CONTRACT NO. FA441815D0006 /
FA441819FA053
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
L
I
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
23 05 48.00 40, Para 1.2, "Outline Drawings"
23 05 48.00 40, Para 1.2, "Equipment and
Performance Data"
23 05 48.00 40, Para 2.2.6, "Isolators"
23 05 48.00 40, Para 2.4, "Type of Isolator"
23 05 48.00 40, Para 2.4, "Type of Base"
23 05 48.00 40, Para 2.4, "Allowable Deflection"
23 05 48.00 40, Para 2.4, "Measured Deflection"
23 05 93, Para 1.3, "Records of Existing Conditions"; G
23 05 93, Para 1.3.3, "TAB
Schematic Drawings and
Report Forms"; G
23 05 93, Para 1.3, "Equipment and
Performance Data"; G
23 05 93, Para 1.5.1, "Independent TAB Agency and Personnel
Qualifications"; G
23 05 93, Para 3.3.2, "TAB
Pre-Field Engineering
Report"; G
23 07 00, Para 3.2.2.4, "MICA Plates"; G
23 07 00, Para 2.3, "Pipe
Insulation Systems"
23 07 00, Para 3.2, "Pipe
Insulation Systems"
23 07 00, Para 3.3, "Duct
Insulation Systems"
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 18-1073030
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
Repair Child Development Center, B.227
SOLICITATION/CONTRACT NO. FA441815D0006 /
FA441819FA053
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
L
I
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
23 07 00, Para 3.4, "Equipment Insulation
Systems"
23 07 00, Para 2.3, "Pipe
Insulation Systems"; G
23 07 00, Para 3.2, "Pipe
Insulation Systems"; G
23 07 00, Para 3.3, "Duct
Insulation Systems"; G
23 07 00, Para 3.4, "Equipment Insulation
Systems"; G
23 07 00, Para 2.2.1.3, "Thermal Insulation"; G
23 07 00, Para 3.1.1, "Display Samples"; G
23 07 00, Para 2.3, "Pipe
Insulation Systems"; G
23 07 00, Para 3.2, "Pipe
Insulation Systems"; G
23 07 00, Para 3.3, "Duct
Insulation Systems"; G
23 07 00, Para 3.4, "Equipment Insulation
Systems"; G
23 09 23.13 20, Para 1.4.1.1, "Control system drawings title sheet"; G
23 09 23.13 20, Para 1.4.1.2, "List of I/O Points"; G
23 09 23.13 20, Para 1.4.1.3, "Control System
Components List"; G
23 09 23.13 20, Para 1.4.1.4, "Control system schematics";
G
23 09 23.13 20, Para 1.4.1.5, "HVAC Equipment Electrical
Ladder diagrams"; G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 18-1073030
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
Repair Child Development Center, B.227
SOLICITATION/CONTRACT NO. FA441815D0006 /
FA441819FA053
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
L
I
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
23 09 23.13 20, Para 1.4.1.6, "Component wiring diagrams"; G
23 09 23.13 20, Para 1.4.1.7, "Terminal strip diagrams"; G
23 09 23.13 20, Para 1.4.1.8, "BACnet communication architecture schematic"; G
23 09 23.13 20, Para 2.1.1, "Direct Digital Controllers"; G
23 09 23.13 20, Para
2.1.1.13, "BACnet
Gateways"; G
23 09 23.13 20, Para 2.1.3, "BACnet Protocol Analyzer";
G
23 09 23.13 20, Para 2.1.2, "DDC Software"; G
23 09 23.13 20, Para 2.2, "Sensors and Input
Hardware"; G
23 09 23.13 20, Para 2.2.6, "Air Flow Monitoring Station";
G
23 09 23.13 20, Para 2.3, "Output Hardware"; G
23 09 23.13 20, Para 2.4.2, "Surge and transient protection"; G
23 09 23.13 20, Para 2.6, "Indicators"; G
23 09 23.13 20, Para 2.5.1, "Duct smoke detectors"; G
23 09 23.13 20, Para 2.7, "Variable frequency (motor) drives"; G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 18-1073030
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
Repair Child Development Center, B.227
SOLICITATION/CONTRACT NO. FA441815D0006 /
FA441819FA053
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
L
I
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
23 09 23.13 20, Para 3.4.2, "Performance Verification
Testing Plan"; G
23 09 23.13 20, Para 3.4.4, "Pre-Performance
Verification Testing
Checklist"; G
23 09 23.13 20, Para 3.4.11, "Performance Verification
Testing Report"; G
23 09 23.13 20, Para 1.6.6, "Contractor's Qualifications";
G
23 09 23.13 20, Para 3.4.1, "Pre-PVT Checklist"; G
23 09 23.13 20, Para 1.4, "BACnet Direct Digital
Control Systems"; G
23 09 23.13 20, Para 3.3, "Controls System Operators
Manuals"; G
23 09 23.13 20, Para 2.7.2, "VFD Service Manuals"; G
23 09 23.13 20, Para 3.5.1, "Training documentation"; G
23 21 23, Para 2.1.2, "System Coordination"; G
23 21 23, Para 2.2.2, "Instructions"; G
23 21 23, Para 2.2.5, "Equipment Data"; G
23 21 23, Para 3.5.2, "Training Period"; G
23 21 23, Para 2.8, "Factory
Tests"
23 21 23, Para 3.3, "Field
Quality Control"
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 18-1073030
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
Repair Child Development Center, B.227
SOLICITATION/CONTRACT NO. FA441815D0006 /
FA441819FA053
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
L
I
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
23 21 23, Para 1.3.1, "Manufacturer's
Representative"
23 21 23, Para 3.5.1, "Operation and Maintenance
Manuals"; G
23 21 23, Para 3.5.2, "Training"; G
23 23 00, Para 2.3, "Refrigerant Piping System";
G
23 23 00, Para 2.3, "Refrigerant Piping System"
23 23 00, Para 1.5.2, "Spare
Parts"
23 23 00, Para 1.3.1, "Qualifications"
23 23 00, Para 3.5, "Refrigerant Piping Tests"
23 23 00, Para 3.1, "Verification of Dimensions"
23 23 00, Para 3.5, "Refrigerant Piping Tests"
23 23 00, Para 2.1, "Service
Organization"
23 23 00, Para 1.5, "Maintenance"; G
23 23 00, Para 3.4, "Operation and Maintenance
Manuals"; G
23 23 00, Para 3.4, "Demonstrations"; G
23 65 00, Para 2.5, "Cooling
Towers"; G
23 65 00, Para 3.1, "Demonstrations"; G
23 65 00, Para 1.5.1, "Verification of Dimensions";
G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 18-1073030
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
Repair Child Development Center, B.227
SOLICITATION/CONTRACT NO. FA441815D0006 /
FA441819FA053
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
L
I
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
23 65 00, Para 3.2, "Packaged Cooling Tower -
Installation Instructions"; G
23 65 00, Para 3.3.1, "Packaged Cooling Tower -
Field Acceptance Test Plan";
G
23 65 00, Para 3.4, "Packaged Cooling Tower -
Field Acceptance Test
Report"; G
23 65 00, Para 2.1, "Service
Organization"
23 65 00, Para 2.5.1.11, "Cooling Tower"
23 65 00, Para 3.2, "Packaged Cooling Tower -
Installation Instructions"
23 65 00, Para 3.1, "Operation and Maintenance
Manuals"
23 81 00, Para 3.7.1, "Spare
Parts"
23 81 00, Para 3.4, "Posted
Instructions"
23 81 00, Para 2.5.1, "Coil
Corrosion Protection"
23 81 00, Para 3.6, "System
Performance Tests"
23 81 00, Para 3.4, "Training"; G
23 81 00, Para 1.5, "Inventory"
23 81 00, Para 2.1, "Supplied Products"
23 81 00, Para 2.2, "Manufacturer's Standard
Catalog Data"
23 81 00, Para 3.5, "Refrigerant Tests
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 18-1073030
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
Repair Child Development Center, B.227
SOLICITATION/CONTRACT NO. FA441815D0006 /
FA441819FA053
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
L
I
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
23 81 00, Para 3.6, "System
Performance Tests"; G
23 81 00, Para 3.7.2, "Service Organizations"
23 81 00, Para 3.4, "Operation and Maintenance
Manuals"; G
26 20 00, Para 2.1, "Panelboards"; G
26 20 00, Para 2.16, "Wireways"; G
26 20 00, Para 3.1.5.1, "Marking strips"; G
26 20 00, Para 2.10.1, "Circuit breakers"; G
26 20 00, Para 2.9, "Switches"; G
26 20 00, Para 3.5.2, "600-volt wiring test"; G
26 20 00, Para 3.5.3, "Grounding system test"; G
26 51 00, Para 1.5.1, "Luminaire Drawings"; G
26 51 00, Para 1.5.2, "Occupancy/Vacancy Sensor
Coverage Layout"; G
26 51 00, Para 2.2, "Luminaires"; G
26 51 00, Para 2.4, "Light
Sources"; G
262 26 51 00, Para 2.3, "Drivers
26 51 00, Para 1.6.1, "LED
Luminaire Warranty"; G
26 51 00, Para 1.5.4, "Luminaire Design Data"; G
26 51 00, Para 2.5.1, "Exit
Signs"; G
26 51 00, Para 2.5.2, "LED
Emergency Drivers"; G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 18-1073030
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
Repair Child Development Center, B.227
SOLICITATION/CONTRACT NO. FA441815D0006 /
FA441819FA053
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
L
I
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
26 51 00, Para 1.5.5, "LED
Luminaire - IES LM-79 Test
Report"; G
26 51 00, Para 1.5.6, "LED
Light Source - IES LM-80
Test Report"; G
26 51 00, Para 1.5.7, "LED
Light Source - IES TM-21
Test Report"; G
26 51 00, Para 1.5.8, "Occupancy/Vacancy Sensor
Verification Tests"; G
26 51 00, Para 1.5.11.3, "Energy Efficiency"; G
26 51 00, Para 1.6.1.1, "Luminaire Useful Life
Certificate"; G
26 51 00, Para 1.5.3, "LED
Driver and Dimming Switch
Compatibility Certificate"; G
32 31 13, Para 2.1, "Fence
Assembly"; G
32 31 13, Para 3.2.1.1, "Location of Gate
32 31 13, Para 2.1, "Gate
Assembly"; G
32 31 13, Para 2.2.14, "Gate
Hardware and Accessories";
G
32 31 13, Para Part 3, "Erection/Installation
Drawings"; G
32 31 13, Para 2.1, "Fence
Assembly"; G
32 31 13, Para 2.1, "Gate
Assembly"; G
32 31 13, Para 2.2.14, "Gate
Hardware and Accessories";
G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 18-1073030
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
Repair Child Development Center, B.227
SOLICITATION/CONTRACT NO. FA441815D0006 /
FA441819FA053
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
L
I
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
32 31 13, Para 2.3.1, "Zinc
Coating"; G
32 31 13, Para 2.1, "PVC
Coating"; G
32 31 13, Para 2.2.1, "Fabric"; G
32 31 13, Para 2.2.9, "Stretcher Bars"; G
32 31 13, Para 2.3.3, "Concrete"; G
32 31 13, Para 1.3.1, "Certificates of Compliance"
32 31 13, Para 2.1, "Fence
Assembly"
32 31 13, Para 2.1, "Gate
Assembly"
32 31 13, Para 2.1, "Hardware Assembly"
32 31 13, Para 2.1, "Accessories"
32 31 13, Para 3.3, "Recycled Material Content"
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
File details come from the government source that posted it. Updated .