Questions and Answer.pdf

PDF 61 KB Posted

Attached to
C-17 Engine Maintenance Platforms Federal contract opportunity
Solicitation number
FA441820Q0009
Issued by
Department of the Air Force Air Mobility Command

View the file

Other files for this federal contract opportunity

Other files attached to C-17 Engine Maintenance Platforms, newest first.
File Type Posted
Amendment 07.pdf PDF
Questions and Answer.pdf PDF
C17 Engine Platforms PWS Updated 19 May 2020.pdf PDF
RFQ - C17 Engine Maintenance Platforms.pdf PDF
Amendment 06.pdf PDF
Questions and Answer.pdf PDF
Amendment 05.pdf PDF
Amendment 04.pdf PDF
Questions and Answer.pdf PDF
Amendment 03.pdf PDF
C-17 Engine Maintenance Platform Manual.pdf PDF
Questions and Answer.pdf PDF
Amendment 02.pdf PDF
Pictures C17 MX STAND.pptx PPTX presentation
Amendment 01.pdf PDF
Questions and Answer.pdf PDF
COMBO - C17 Engine Maintenance Platforms 2020.pdf PDF
C17 Engine Platforms PWS.pdf PDF
RFQ - C17 Engine Maintenance Platforms.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions Answers For clarification; we would ship the stands directly from Dover to Charleston, or from Dover, to our facility for refurb then to Charleston for set up and training?

The contractor, would determine the best way to do this and provide their solution in their Technical Narrative. However, the Government can provide an area at Joint Base Charleston to allow the contractor to refurbish on‐site.

Will there be a site walk through to assess the stand’s current condition and size?

Due to the COVID‐19 pandemic there will be no site visit.

Is there a maintenance or operator’s manual available for us to review of the stands?

No.

Do you have a list of items that are known in need of repair?

1. The damage requiring repair ‐ Locking t‐pins, Main electrical lines, and bellows covering the lifting pistons will need to be evaluated for replacement. We didn't see damage on the bellows but it was identified these are a common failure part due to dry rot.

2. All hardware holding main platform will need to be replaced as the nuts and bolts are single use nylon. When/if removed to break down the stand they must be discarded and replaced with new nylon hardware.

3. Sealant may be needed on some of the deck connections to seal all fuels/oils from leaking past the deck joints, this has to be removed, and new sealant reinstalled when reassembling the stands.

4. Check the weld points for cracks. There may be a need to repair a few weld points.

5. All 4 maintenance stands will need to have their main electrical cable replaced due to dry rot.

Are construction prints available for reference on these stands?

No.

What are the dimensions and weight of the stand?

Approximate Dimensions:

1x Outboard Stand – 30 Feet Long x 20 Feet Wide x 8 Feet High

1x Inboard Stand – 24 Feet Long x 20 Feet Wide x 8 Feet Hign

2x Inlet Stand – 5 Feet Long x 20 Feet Wide x 8 Feet Hign

Approximate Weight 17,000 lbs.