Q&A_-_DKGV_11-2127_-_Bldg_909.pdf
PDF 27 KB Posted
- Attached to
- Repair Consolidated CES Facility, Bldg 909 Federal contract opportunity
- Solicitation number
- FA4418-17-R-0020
About this file
Questions and Answers from Pre-Proposal Conference and Site Visit on 27 Jul 2017.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4418-17-R-0020-0005.pdf | ||
| FA4418-17-R-0020-0004.pdf | ||
| NWS_bldg5,_36,_71_Sewage_ANSI_A.PDF | ||
| Bldg._909_(Dwg_Set).pdf | ||
| Bldg._71_(Dwg_Set).pdf | ||
| Bldg_71_Asbestos_Survey.pdf | ||
| FA4418-17-R-0020-0002.pdf | ||
| NWS_bldg5,_36,_71_Water_ANSI_A.pdf | ||
| Bldg._36_(Dwg_Set).pdf | ||
| Bldg._5_(Current_Floor_Plan).pdf | ||
| Bldg._5_(Dwg_Set).pdf | ||
| Bldg_5_Asbestos_Inspection.pdf | ||
| NWS_bldg5,_36,_71_Electrical_ANSI_A.pdf | ||
| Bldg_5_Asbestos_Survey.pdf | ||
| Bldg_36_Asbestos_Survey.pdf | ||
| FA4418-17-R-0020_PreProposal_Site_Visit_Sign-In_Sheet.pdf | ||
| FA4418-17-R-0020-0001.pdf | ||
| Attachment_4_-_FA4418-17-R-0020_-_Green_Procurement_Form.pdf | ||
| Attachment_3_-_FA4418-17-R-0020_-_Wage_Determination.pdf | ||
| Attachment_2_-_FA4418-17-R-0020_-_Drawings.pdf | ||
| Attachment_1_-_FA4418-17-R-0020_-_Specifications.pdf | ||
| FA4418-17-R-0020_-_Solicitation.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN 0003 requests for pricing to Demolish Bldgs 5, 36, and 71, however the bid documents do not contain any drawings or specifications regarding the existing conditions of these buildings.
Please provide:
a) Drawings detailing the existing conditions to include all utilities connections, mechanical equipment, and electrical connections,
b) Final conditions of the areas where the demolished buildings existed (i.e. is landscaping required, do the sidewalks and parking areas remain, etc.), and
c) Asbestos and Lead Paint assessment for the three buildings to be demolished.
a) See 3 documents titled, 1) NWS bldg5, 36, 71_Electrical_ANSI A, 2) NWS bldg5, 36, 71_Sewage_ANSI A, and 3) NWS bldg5, 36, 71_Water_ANSI A
b) Demolish all foundations and site improvements. Finished grade will be seeded.
c) See 4 documents titled, 1) Bldg 5 Asbestos Inspection, 2) Bldg 5 Asbestos Survey, 3) Bldg 36 Asbestos Survey, and 4) Bldg 71 Asbestos Survey
2 Q In Bldg 909, has a flow test been done for new Sprinkler line?
A No, it has not.
3 Q In Bldg 909, will we need to install a new window cage in lobby?
A No, the plans do not show that.
4 Q How much time do we need to allow after completion of bldg. 909 before demo of bldgs 5, 36 and 71 can begin?
A Approximately 6 weeks.
5 Q Will Bldg 909 be empty of all furniture before starting demo?
A No, the GC will need to dispose of the furniture.
6 Q Will we receive drawings with square footage of Bldgs 5, 36 and 71 to be demolished?
A Yes, drawings will be provided.
7 Q How far is demolition of these bldgs to be completed? Is it to include footers or are the footers to remain?
A Demolish all foundations and site improvements. Finished grade will be seeded.
8 Q Will as-built drawings for Bldgs 5, 36, and 71 be provided?
A Yes, drawings will be provided.
9 Q Will we be given a diagram showing where to cap off utilities for Bldgs 5, 36, and 71?
A See 3 sheets titled, 1) NWS bldg5, 36, 71_Electrical_ANSI A, 2) NWS bldg5, 36, 71_Sewage_ANSI A, and 3) NWS bldg5, 36, 71_Water_ANSI A. Cap off utilities at the main, install valves where required on the water lines.
10 Q Will we be sowing grass or installing sod after completion of demolition of Bldgs 5, 36 and 71?
A Seeding is required.
11 Q Will we be given a survey showing asbestos and lead in Bldgs 5, 36 & 71?
A Yes, a survey of lead and asbestos will be provided.
12 Q Will Bldgs 5, 36 and 71 be empty of furniture and equipment prior to demolition?
A No, the GC will need to remove and dispose of the furniture.
13 Q Is there any salvageable equipment to be turned over to the Government?
A No, there is not.
14 Q Will the drawings indicate trees to be protected or removed around Bldgs 5, 36, and 71?
A Yes, see Civil drawing sheets. In addition, the trees that are to be saved if at all possible will be marked.
15 Q Currently, there is a Trane ESPC Field office in room 122 & 123. Will they be relocated during the course of construction?
Will we be required to keep their field office operational during the renovation?
A No, they will be relocated.
FA4418-17-R-0020 - DKGV 11-2127 - Repair Consolidated CES Facility, Bldg 909 Questions & Answers
1 Q
A
16 Q Are there current (or outdated) Hazardous Materials Reports for B5, B36 & B71? If so – please provide.
A Yes, a survey of lead and asbestos will be provided.
17 Q Are there As-Built Drawings for B5, B36, & B71? If so – please provide.
A Yes, drawings will be provided.
18 Q Will B5, B36, B71 have to be abated prior to demolition? Or will demolishing the materials to a certified landfill to receive hazardous materials be sufficient?
A The buildings will have to be abated prior to demolition.
19 Q What will the post-demolition condition of B5, B36, & B71 be? Are we to demolish the foundation and provide sod, asphalt, or concrete?
A Demolish the foundations, cap the utilities at the main (provide valves in water lines as necessary), grade, and seed.
20 Q Spec 23 05 93 para 1.3 states to Conduct DALT and TAB of the indicated existing systems and equipment. Please provide what systems are indicated these are not shown on the drawings.
A All medium pressure ductwork between the air-handling units and terminal boxes and return duct from the air handling units shall be subject to DALT requirements.
21 Q There is no duct construction leakage schedule on the drawings. Please provide this.
A Appendix D in the specification calls for the system to be constructed to Seal Class A. The ducts shall only be required to be constructed to Seal Class B and the associated leakage tests correlate to medium pressure duct of this seal class as specified in referenced SMACNA guidelines.
22 Q Bid item #003 states that we are to demolish Buildings 5, 36 and 71. Please provide As-builts for each building and an asbestos/lead assessment report for each building.
A As built drawings and asbestos and lead reports are being provided for these buildings.
23 Q It was stated at the walk-thru that Building 909 would have to be completed and accepted prior to starting demo on the buildings. Can you identify how much time it will take to move the occupants from buildings 5,36 and 71 into Building 909 once we receive the CO
A Approximately six weeks.
24 Q The ACM Report that accompanied the specifications for Building 909 does not identify sample results for the roof. Has the roof been sampled? Please provide if it has.
A The roof for Building 909 was negative for asbestos.
25 Q Has the main water line to the building been pressure tested to support new FP riser? If so, please provide information.
A No, it has not.
26 Q
May helical piles be substituted for the micro-piles shown on sheet S101. The helical piles will carry a superior load. The installation process will provide load details at any depth interval. The installation process will not generate spoils, dust, or vibration. The helical piles that we utilize are made by Chance in Centralia Missouri using recycled material. Chance piers have been produced in the US since 1912.
A
27 Q Will building 909 be completely emptied of its furnishings prior to the start of construction? If not, will it need to be salvaged, stored or transported?
A No, the GC will need to remove and dispose of the furniture.