FA4418-17-R-0020-0002.pdf
PDF 101 KB Posted
- Attached to
- Repair Consolidated CES Facility, Bldg 909 Federal contract opportunity
- Solicitation number
- FA4418-17-R-0020
About this file
FA4418-17-R-0020 Amendment 0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4418-17-R-0020-0005.pdf | ||
| FA4418-17-R-0020-0004.pdf | ||
| NWS_bldg5,_36,_71_Sewage_ANSI_A.PDF | ||
| Bldg._909_(Dwg_Set).pdf | ||
| Bldg._71_(Dwg_Set).pdf | ||
| Bldg_71_Asbestos_Survey.pdf | ||
| Q&A_-_DKGV_11-2127_-_Bldg_909.pdf | ||
| NWS_bldg5,_36,_71_Water_ANSI_A.pdf | ||
| Bldg._36_(Dwg_Set).pdf | ||
| Bldg._5_(Current_Floor_Plan).pdf | ||
| Bldg._5_(Dwg_Set).pdf | ||
| Bldg_5_Asbestos_Inspection.pdf | ||
| NWS_bldg5,_36,_71_Electrical_ANSI_A.pdf | ||
| Bldg_5_Asbestos_Survey.pdf | ||
| Bldg_36_Asbestos_Survey.pdf | ||
| FA4418-17-R-0020_PreProposal_Site_Visit_Sign-In_Sheet.pdf | ||
| FA4418-17-R-0020-0001.pdf | ||
| Attachment_4_-_FA4418-17-R-0020_-_Green_Procurement_Form.pdf | ||
| Attachment_3_-_FA4418-17-R-0020_-_Wage_Determination.pdf | ||
| Attachment_2_-_FA4418-17-R-0020_-_Drawings.pdf | ||
| Attachment_1_-_FA4418-17-R-0020_-_Specifications.pdf | ||
| FA4418-17-R-0020_-_Solicitation.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DKGV 11-2127
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Provide questions, answ ers, and supporting documents (i.e. surveys, draw ings, etc.) from the Pre-Proposal Conference & Site Visit.
2. Remove, from Draw ing E100, Note #2 from the Electrical Keyed Notes. A new transformer is not required for Building 909.
3. Remove, from Draw ing C104, "New Painted Cross Walk" crossing W. Old Tom Road. A crossw alk is not required.
SEE SUMMARY OF CHANGES
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Aug-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA441817R0020
X 9B. DATED (SEE ITEM 11)
17-Jul-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Aug-2017
CODE
628 CONTRACTING SQUADRON
101 E HILL BLVD, B503
JOINT BASE CHARLESTON SC 29404 5021
FA4418 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA441817R0020
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
LIST OF ATTACHMENTS
ATTACHMENT DESCRIPTION PAGES DATE
1 Specifications 1433 28 February 2017
2 Drawings 145 10 October 2016
3 Wage Determination 5 6 January 2017
4 Green Procurement Form 2 28 February 2017
ATTACHMENTS FOR FA4418-17-R-0020 AMENDMENT 0002
NWS bldg5, 36, 71_Electrical_ANSI A 1
NWS bldg5, 36, 71_Sewage_ANSI A 1
NWS bldg5, 36, 71_Water_ANSI A 1
Bldg 5 Asbestos Inspection 4
Bldg 5 Asbestos Survey 20
Bldg 36 Asbestos Survey 8
Bldg 71 Asbestos Survey 11
Bldg. 5 (Current Floor Plan) 1
Bldg. 5 (Dwg Set) 128
Bldg. 36 (Dwg Set) 52
Bldg. 71 (Dwg Set) 64
Bldg. 909 (Dwg Set) 63
(End of Summary of Changes)
File details come from the government source that posted it. Updated .