This statement of work and related federal contract opportunity outline requirements for plumbing repair services at dormitories on Hurlburt Field in Florida. The statement of work specifies that the contractor will remove and replace plumbing components including toilets, supply lines, valves and piping behind 144 toilets across three dormitory buildings. The contractor must coordinate work, obtain permits, and adhere to base specifications and security requirements. The federal contract opportunity is an indefinite delivery indefinite quantity contract with a ceiling of $10-25 million to provide maintenance, repair, construction and engineering services at Hurlburt Field over six years. The pre-solicitation will be issued in February 2024 via SAM.gov, with an 8(a) small business set-aside and requirement for payment and performance bonds on task orders.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

1. GENERAL

1.0 The following Statement of Work is for a SABER task order to be accomplished by the contractor in accordance with the requirements of the Hurlburt Field Base

Master Specification (HBMS), and the SABER Contract.

1.1 The contractor shall provide all plant, labor, materials, equipment, design, and supervision necessary to “Repair Dormitory Plumbing 1 SOCES Dorms

B91053, B91054 & B91055”. All work shall be done in accordance with the requirements contained in the Hurlburt Field Job Order Contract Technical

Specifications, SABER Contract and the Statement of Work. Contractor shall provide a projected schedule of all submittals and a project construction schedule upon award of the contract.

1.2 Contractor and all subcontractors must fully comply with specification section 01

00 00, General Requirements. All forms referenced, notarized statements, construction data worksheets, contractor progress reports, contractor compliance statements, etc. must be provided to the contracting officer at the appropriate time as indicated within the specification.

1.3 Contractor should refer to Hurlburt Field Job Order Contract Technical

Specifications, for guidance on the documentation needed to fulfill the requirements of the SABER task order.

1.4 A Cost Estimate shall be accomplished using the 2024 SABER Construction

Task Catalog. Non-pre-priced items should be identified as such on the estimate.

1.5 Contractor shall obtain all necessary permits and work clearances, including underground utilities PRIOR to start of work.

CP 1138409

Title: Repair Dormitory Plumbing 1 SOCES Dorms B91053, B91054 & B91055

Date: 20 Oct 2023

1.6 Contractor shall coordinate work closely with Contracting Officer or representative, as well as the CE project manager on all issues pertaining to work phasing, scheduling, planning, and execution.

1.7 The contractor will provide the names of all workers to the building manager and security officials of the building.

1.8 All workers from the contractor and sub-contractors will be informed on the specific security issues and operating practices of the building and will comply.

1.9 Any work done after duty hours, weekends or holidays will be coordinated with requestor and building manager.

1.10 All close out documents (see section 01 78 00) must be submitted to contracting officer prior to final inspection. Government will withhold 3% of contract sum until project is complete and has been accepted by the

Government.

2. LOCATION

2.0 The project site is located on Hurlburt Field, Florida at Buildings 91053, 91054 &

91055.

3. MATERIALS

3.0 Contractor shall refer to the Hurlburt Field Job Order Technical Specifications for guidance in selecting appropriate materials to accomplish the work.

3.1 Contractor to provide submittals for all materials.

3.2 If the Contractor suggest the use of a specific material not listed in the specifications, which the Government might consider to lessen the cost or increase the utility or appearance of the facility, the material should be listed under Alternatives as described in the SABER contract.

4. PROJECT ELEMENTS

4.0 The project will contain, but is not limited to the following elements:

4.1 Demolition

4.1.1 Remove and save for reinstallation 144 floor mounted toilets. Dispose of existing wax rings.

4.1.2 Cut out and remove 18” x 30” section of drywall behind toilets to provide access to existing water supply piping.

4.1.3 Cut, remove and dispose of existing 1/2” angle stop and flexible braided supply line to toilet.

4.1.4 Cut, remove and dispose of existing 1/2”, 90-degree elbows at this location. Cut, remove and dispose of existing 1/2” copper tubing necessary to complete required work.

4.2 New Work

4.2.1 Provide and install new ½” brass ball isolation valve, 1/2” Type K copper elbows, any additional 1/2” Type K copper tubing required, 1/2” angle stop, escutcheon for 1/2" diameter tubing and 1/2” flexible braided supply line from angle stop to toilet.

4.2.2 Patch, tape, mud, sand, prime and paint 18” x 30” section of drywall behind toilet.

4.2.3 Frame 18” x 18” opening between top of toilet and bottom of overhead cabinet with 16-gauge metal stud framing.

4.2.4 Provide and install a metal 18” x 18” access door in this framed opening.

4.2.5 Reinstall existing floor mounted toilets using new wax rings.

4.2.6 For estimating purposes, plan on having access to 4 toilets at a time.

END OF STATEMENT OF WORK