Attach 04 - Hurlburt SAMPLE Project SOW.pdf
PDF 73 KB Posted
- Attached to
- SABER IDIQ - Hurlburt Field FL
- Solicitation number
- FA441724RSABER
About this file
This document contains a Statement of Work and related federal contract opportunity notice. The Statement of Work outlines requirements for renovating the Community Park Concession Stand building at Hurlburt Field, Florida, including demolishing and repairing restrooms, concessions areas, stairwells, and a scorekeeper area. The federal contract opportunity is for the Simplified Base Engineering Requirements Indefinite Delivery Indefinite Quantity contract to provide non-complex construction, maintenance, and repair projects at Hurlburt Field on an as-needed basis over the next five years, with a maximum value of $25 million. The North American Industry Classification System code is 236220, with a size standard of $45 million. The solicitation is expected to publish on February 2, 2024, with proposals due in mid-February. The contract will have one base period of six months plus four one-year options and utilize firm-fixed-price task orders. Payment and performance bonds are required within 10 days of each task order award.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
1. GENERAL
1.0 The following Statement of Work is for a SABER task order to be accomplished by the contractor in accordance with the requirements of the Hurlburt Field Base Master Specification (HBMS), and the SABER Contract.
1.1 The contractor shall provide all plant, labor, materials, equipment, design, and supervision necessary to “Renovate Community Park Concession Stand, Bldg. 90381”. All work shall be done in accordance with the requirements contained in the Hurlburt Field Job Order Contract Technical Specifications, SABER Contract and the Statement of Work. Contractor shall provide a projected schedule of all submittals and a project construction schedule upon award of the contract.
1.2 Contractor and all subcontractors must fully comply with specification section 01 00 00, General Requirements. All forms referenced, notarized statements, construction data worksheets, contractor progress reports, contractor compliance statements, etc. must be provided to the contracting officer at the appropriate time as indicated within the specification.
1.3 Contractor should refer to Hurlburt Field Job Order Contract Technical
Specifications, for guidance on the documentation needed to fulfill the requirements of the SABER task order.
1.4 A Cost Estimate shall be accomplished using the 2024 SABER Construction
Task Catalog. Non-pre-priced items should be identified as such on the estimate.
1.5 Contractor shall obtain all necessary permits and work clearances, including underground utilities PRIOR to start of work.
OP 1021240
Title: Renovate Community Park Concession Stand, Bldg. 90381
Date: 20 Oct 2023
1.6 Contractor shall coordinate work closely with Contracting Officer or representative, as well as the CE project manager on all issues pertaining to work phasing, scheduling, planning, and execution.
1.7 The contractor will provide the names of all workers to the building manager and security officials of the building.
1.8 All workers from the contractor and sub-contractors will be informed on the specific security issues and operating practices of the building and will comply.
1.9 Any work done after duty hours, weekends or holidays will be coordinated with requestor and building manager.
1.10 All close out documents (see section 01 78 00) must be submitted to contracting officer prior to final inspection. Government will withhold 3% of contract sum until project is complete and has been accepted by the Government.
2. LOCATION
2.0 The project site is located on Hurlburt Field, Florida at Building 90381 Concession Stand at Community Park.
3. MATERIALS
3.0 Contractor shall refer to the Hurlburt Field Job Order Technical Specifications for guidance in selecting appropriate materials to accomplish the work.
3.1 Contractor to provide submittals for all materials.
3.2 If the Contractor suggests the use of a specific material not listed in the specifications, which the Government might consider to lessen the cost or increase the utility or appearance of the facility, the material should be listed under Alternatives as described in the SABER contract.
4. PROJECT ELEMENTS
4.0 All work shall be completed according with the drawing set dated 16 Oct 2023 provided in Request For Proposal package. Renovations include work in both men’s and women’s restrooms, concessions area, stairwell, and 2nd floor “scorekeeper area” of Community Park Concession Stand building.
4.0.1 Scaled drawings provided by government are to be considered approximate. All dimensions and quantities shown shall be field verified by the contractor.
4.1 Demolition
4.1.1 Contractor is responsible for removing all materials and equipment currently stored in areas of renovation within building 90381, securely storing items during construction, and returning materials and equipment back to space at completion of project unless otherwise noted.
4.1.2 Contractor to provide means of secure storage (e.g., CONEX box). Storage space will not be provided by the government.
4.1.3 Ceilings throughout the construction areas (restrooms, concessions area, stairwell, scorekeeper area) shall not be demolished.
4.2 New Work
4.2.1 All walls in work areas shall be painted in their entirety with one coat primer and two coats interior latex paint. Note: this does not include gypsum board in restroom to be finished with Fiberglass Reinforced Panels (FRP).
4.2.2 Ceilings to be patched/repaired as needed and repainted with one coat primer and two coats paint.
4.2.3 Contractor to coordinate with local Hurlburt Field locksmith to ensure new lever handle lockset cylinders are compatible with base standard keys.
END OF STATEMENT OF WORK