SOW Weight Room Flooring Amendment 1.pdf
PDF 313 KB Posted
- Attached to
- Gym Weight Room Flooring Amendment
- Solicitation number
- FA441724Q0178
About this file
This document is a Statement of Work (SOW) for a federal contract opportunity to provide and install 798 square feet of rubber flooring in a weight room at Hurlburt Field, FL. The key details are:
The contractor shall disassemble and move existing equipment, remove and dispose of the existing rubber flooring, prep the subfloor, and install new 18mm rolled rubber flooring with an EPDM logo. The contractor shall reassemble and reinstall the existing equipment after the new flooring is installed. The work is to be completed within 7 business days. The contractor must be an authorized distributor/reseller of the proposed products. There are specific base access and security requirements, including prohibitions on bringing firearms or drugs onto the military installation. The solicitation closes on July 15, 2024 at 2:00 PM CDT.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Performance Rolled Rubber Flooring
Amendment 1 15 Jul 24
1 DESCRIPTION OF SERVICES. The contractor shall provide all management, tools, supplies, equipment, and labor necessary to provide and install 798 square feet (21’Wx38’L) of rubber flooring in Building 90209, Hurlburt Field, FL. The rubber flooring will be installed in a Weight Room that is climate controlled.
1.1 BASIC SERVICES.
1.1.1 The contractor shall disassemble and move the equipment (to be stored in another location on Hurlburt Field identified by Government in a weatherproof storage container supplied by the contractor) on the existing rubber flooring and remove the existing rubber flooring and dispose of at an off-base location IAW local disposal laws.
1.1.1.1 List of equipment to be moved:
1.1.1.1.1 Three weight racks with weighted plates
1.1.1.1.2 Dumbbell rack with weights
1.1.1.1.3 Reverse hyper machine
1.1.1.1.4 Treadmill
1.1.1.1.5 Sprinter treadmill
1.1.1.1.6 2 Echo Bikes
1.1.1.1.7 Gym locker Free standing
1.1.1.1.8 2 Kettlebell racks with Kettlebells
1.1.1.1.9 Rower
1.1.1.1.10 Scale
1.1.2 After existing rubber flooring removal, the contractor shall prep the subfloor to prepare for rubber flooring installation. Treatment shall comply with manufacturer’s specifications for the product being installed to ensure proper adhesion.
1.1.3 Products shall meet the salient characteristics detailed below:
1.1.3.1 Rubber Flooring: The rubber flooring shall be gray and 18mm Rolled Rubber Flooring comprising of 15.5mm underlayment with a 2.5mm wear layer fused in manufacturing process to prevent separation in the field. The contractor shall supply and install custom rubber EPDM logo, permanently inlaid flush to the rubber flooring.
The contractor shall install waterproof adhesive, tolerant to 99% relative humidity, IAW manufacturer’s specifications. The contractor shall install two (2) black doorway transitions and rubber base at base of walls. The contractor shall reassemble and re-install existing equipment listed in paragraphs 1.1.1.1.1 thru 1.1.1.1.10 that was removed at the beginning of the installation in the preinstallation configuration.
1.1.3 Flooring shall be installed in accordance with the manufacturer’s specifications, ADA federal regulations and in accordance with user/installation manuals as to not void any warranties.
2 GOVERNMENT FURNISHED PROPERTY AND SERVICES. There will be no Government Furnished Property or Services provided for this effort.
2.1 Normal Hours of Operation. The contractor shall perform the services required under this contract during the following hours: Mon-Fri 7:00AM to 4:00PM, except for federal holidays. The contractor may work, with prior approval of the Contracting Officer, extended hours to ensure timely completion of work at no additional cost to the government.
2.2 Recognized Holidays. The contractor is not required to provide service on the following days:
New Year’s Day, Martin Luther King Day, Presidents Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Days, Thanksgiving Day and Christmas Day. If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.
2.3 The installation shall not last more than 7 business days from start of the project. The contractor will not be permitted to finish any work after the 7-day period and the Contracting Officer will terminate the contract for cause for any work not acceptably accomplished during this period. The contractor shall uncrate/unpack all new items and perform required assembly in accordance with the manufacturer’s instructions. Contractor shall remove and dispose of packing material at an off-base location. The Contractor is responsible for securing the disposal site.
Additionally, the Government does not have a dumpster available for use for this project. If an onsite dumpster is required, the contractor is responsible for providing.
2.4 The contractor shall have a designated Project Manager that will remain onsite for the duration of the contract and ensure work is being completed correctly and in an acceptable manner. The Project Manager’s name and contact information shall be provided to the government representatives onsite prior to contract installation.
3 SPECIAL QUALIFICATIONS. The contractor shall be an authorized and/ or certified as a distributor/reseller of the project being offered as well as any subcontractors.
4 BASE ACCESS
4.1 Contractor, Employee Base Pass and Identification, Special Clearances, and Vehicle Passes. The contractor shall obtain base identification and vehicle passes, if required, for all Contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor employees are required to wear or prominently display installation identification badges or contractor-furnished contractor identification badges while visiting or performing work on the installation. The contractor shall submit the employee listing the Contracting Officer no less than 3 days prior to the performance start date and at least one day prior as changes occurs. Employees with active warrants or felonies will not be granted access to the base. Additionally, drugs of any nature are not authorized on federal installations. If found with any drug, persons will not be granted access to the base and will be banned from accessing in the future. This includes Medical Marijuana where a Medical ID is present.
4.2 The Contractor Employee List. This form shall list every employee requiring base access.
Every time employees change; it shall be updated to reflect additions and/or deletions. Identify those individuals you wish to have escort authority by including the word “escort” or “E” next to their names. Limit the number of individuals designated as escorts to a reasonable number (i.e.
one or two). For work locations use building numbers or specify as base wide if applicable. Once completed, email the list to the Contracting Office representative in EXCEL format. The Contracting Officer will then prepare, attach a cover letter, and forward the Employee List to the Visitor Control Center.
4.3 Upon notification of the employee listing being forwarded to the Visitor Control Center (VCC), all contractor employees shall report to the VCC to complete the required documentation for base access. Contractor employees shall be required to provide two (2) forms of identification.
If an employee will be driving on Hurlburt Field they are required to provide a valid driver’s license, vehicle registration, and proof of insurance. NOTE: The section of Commercial gate Control Center administrating this function is closed after 1800 (6:00 p.m.), therefore, employees must arrive prior to this time in order for their documentation to be processed.
4.4 During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.
4.5 FIREARMS & ILLICIT DRUGS MAY NOT BE BROUGHT ON BASE UNDER ANY
CIRCUMSTANCES. Individuals with criminal records are not allowed on base. Contractor employees are prohibited from possessing weapons, firearms or ammunition on themselves or within their contractor-owned or privately owned vehicle while on Hurlburt Field, FL.
4.6 DRIVING LICENSE/ON-BASE REQUIREMENTS. The contractor and employees shall comply with base traffic regulations at all sites. The contractor shall ensure employees have a current and valid state/country driver’s license for the type of vehicle being driven before allowing the employee to operate a personal vehicle on Hurlburt Field, Florida.
| 1 DESCRIPTION OF SERVICES. The contractor shall provide all management, tools, supplies, equipment, and labor necessary to provide and install 798 square feet (21’Wx38’L) of rubber flooring in Building 90209, Hurlburt Field, FL. The rubber flooring wi... |
| 1.1 BASIC SERVICES. |
| 1.1.1 The contractor shall disassemble and move the equipment (to be stored in another location on Hurlburt Field identified by Government in a weatherproof storage container supplied by the contractor) on the existing rubber flooring and remove the e... |
| 1.1.1.1 List of equipment to be moved: |
| 1.1.1.1.1 Three weight racks with weighted plates |
| 1.1.1.1.2 Dumbbell rack with weights |
| 1.1.1.1.3 Reverse hyper machine |
| 1.1.1.1.4 Treadmill |
| 1.1.1.1.5 Sprinter treadmill |
| 1.1.1.1.6 2 Echo Bikes |
| 1.1.1.1.7 Gym locker Free standing |
| 1.1.1.1.8 2 Kettlebell racks with Kettlebells |
| 1.1.1.1.9 Rower |
| 1.1.1.1.10 Scale |
| 1.1.2 After existing rubber flooring removal, the contractor shall prep the subfloor to prepare for rubber flooring installation. Treatment shall comply with manufacturer’s specifications for the product being installed to ensure proper adhesion. |
| 1.1.3 Products shall meet the salient characteristics detailed below: |
| 1.1.3.1 Rubber Flooring: The rubber flooring shall be gray and 18mm Rolled Rubber Flooring comprising of 15.5mm underlayment with a 2.5mm wear layer fused in manufacturing process to prevent separation in the field. The contractor shall supply and in... |
| 2 GOVERNMENT FURNISHED PROPERTY AND SERVICES. There will be no |
| 2.1 Normal Hours of Operation. The contractor shall perform the services required under this contract during the following hours: Mon-Fri 7:00AM to 4:00PM, except for federal holidays. The contractor may work, with prior approval of the Contracting Of... |
| 2.2 Recognized Holidays. The contractor is not required to provide service on the following days: New Year’s Day, Martin Luther King Day, Presidents Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Days, Thanksgiving... |
| 3 SPECIAL QUALIFICATIONS. The contractor shall be an authorized and/ or certified as a distributor/reseller of the project being offered as well as any subcontractors. |
| 4 BASE ACCESS |
| 4.5 FIREARMS & ILLICIT DRUGS MAY NOT BE BROUGHT ON BASE UNDER ANY |
File details come from the government source that posted it. Updated .