STATEMENT OF WORK Advanced SemiPrep.pdf

PDF 88 KB Posted

Attached to
Advanced Semi-Prep Training Federal contract opportunity
Solicitation number
FA441721QMF02
Issued by
Department of the Air Force Special Operations Command

View the file

Other files for this federal contract opportunity

Other files attached to Advanced Semi-Prep Training, newest first.
File Type Posted
FA441721QMF02001 - ComboSol - Advanced Semi-Prep Training.docx DOCX document
QA Advanced Semi-Prep v1.2.docx DOCX document
QA Advanced Semi-Prep.docx DOCX document
STATEMENT OF WORK 319 Advanced SemiPrep.docx DOCX document
WD 2015-4531_Rev15_22Apr21.pdf PDF
FA441721QMF02 - ComboSol - Advanced Semi-Prep Training.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

Advanced Semi-Prep and Water Training

1. DESCRIPTION OF SERVICES. Contractor shall provide all airplanes, AVGAS, equipment, tools, materials, personnel, supervision, quality control, and ground training necessary for safe and legal operation and maintenance of aircraft. Training shall be for three pilots to receive advanced semi-prep for two weeks between 22 Aug & 15 Sep 2021. Training must include extensive low-level flying through and landing in high altitude mountainous terrain, to include: unprepared-surface landings on sloped terrain, landings on completely unprepared surfaces, identification of suitable landing surfaces in mountainous terrain, and canyon escape maneuvers with engine-out and partial power loss scenarios. Additional training should include water landing training, to prepare aircrews for ditching scenarios. At least half of the flight time needs to be in a single engine aircraft.

1.1. Specific requirements for the two-week course must include:

1.1.1. 15 hours Supercub or equal for off-field unprepared surface landings and site selection

1.1.2. 4 hours float plane for water ditching exposure and threat identification during water operations

1.1.3. 4 hours King Air 100 / Cessna Caravan or similar type aircraft for unimproved surface operations and low level mountain flying

1.1.4. 15 hours ground time

2. GENERAL INFORMATION.

2.1. Contractor Personnel. The contractor must validate that the employees assigned to this requirement are certified to perform this level of training and possess the required experience to safely and effectively provide this training.

2.2. Contract Manager. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate or alternates, who shall act for the contractor when the manager is absent, shall be designated in writing to the contracting officer prior to the contract start date. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.

2.3. Contractor Employees. Contractor personnel shall be easily recognized as contractor employees.

2.4. Aircraft. The contractor shall ensure all aircraft used to conduct training are registered and maintained per FAA regulations.

File details come from the government source that posted it. Updated .