MS0114

PROJECT NO: CP1018486 DATE: May 9, 2018 (100% Submittal) Specifications

DEPARTMENT OF THE AIR FORCE

SPECIAL OPERATIONS COMMAND

1 SPECIAL OPERATIONS WING

Renovate Community Commons, Bldg 90337

HURLBURT FIELD, FLORIDA

Project No: CP1018486 100% Submittal

Renovate Community Commons, Bldg 90337 Hurlburt Field, FL

PROJECT TABLE OF CONTENTS Page 1

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 33 00 SUBMITTAL PROCEDURES

01 35 13 SPECIAL PROJECT PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 PROJECT IDENTIFICATION

01 78 00 CLOSEOUT SUBMITTAL

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 82 16.00 20 ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS

DIVISION 03 - CONCRETE

03 20 00.00 10 CONCRETE REINFORCING

03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 00 ROOF AND DECK INSULATION

07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS

07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 60 00 FLASHING AND SHEET METAL

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 33 13 COILING COUNTER DOORS

08 33 23 OVERHEAD COILING GRILLES

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

Project No: CP1018486 100% Submittal

Renovate Community Commons, Bldg 90337 Hurlburt Field, FL

PROJECT TABLE OF CONTENTS Page 2

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 13 CERAMIC TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 67 23.13 STANDARD RESINOUS FLOORING

09 68 00 CARPETING

09 77 20 DECORATIVE FIBERGLASS REINFORCED WALL PANELS

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.20 INTERIOR SIGNAGE

10 26 13 WALL AND CORNER GUARDS

DIVISION 12 - FURNISHINGS

12 24 13 ROLLER WINDOW SHADES

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 23 DIRECT DIGITAL CONTROL SYSTEM FOR HVAC

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

23 73 13.00 40 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS

DIVISION 26 - ELECTRICAL

26 20 00 INTERIOR DISTRIBUTION SYSTEM

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 31 00 FIRE DETECTION AND ALARM SYSTEMS

ASBESTOS SURVEYS

AB1 Model 11x17 Asbestos LBP Survey 20 Oct 2014 Landing Zone Asbestos Final Report Landing Zone Asbestos Removal Drawing

-- End of Project Table of Contents --

Pr oj ect No: CP1018486 Renovat e Communi t y Commons, Bl dg 90337 100% Submi t t al Hur l bur t Fi el d, FL

SECTI ON 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1. 1 WORK COVERED BY CONTRACT DOCUMENTS

1. 1. 1 Pr oj ect Descr i pt i on

Ar chi t ect ur e: Thi s pr oj ect f ocuses pr i mar i l y on t he Li br ar y and Vel oci t y Subs por t i ons of Bui l di ng 90337, i nvol v i ng appr oxi mat el y 9, 100 squar e f eet of i nt er i or space, and appr oxi mat el y 1, 538 squar e f eet of ext er i or space at t he sout hwest cor ner t o cr eat e a new out si de pat i o t o ser ve t he new Cof f ee Caf é f aci l i t y . Thi s wi l l i nc l ude sel ect i ve demol i t i on of i nt er i or f i ni sh syst ems i ncl udi ng asbest os r emoval and mi nor r oof st r uct ur e. New wor k wi l l i nc l ude sl i ght r econf i gur at i on wi t h non l oad- bear i ng i nt er i or par t i t i ons, door s and f i ni sh syst ems.

1. 1. 2 Location

The wor k i s l ocat ed at Bui l di ng 90337, appr oxi mat el y as i ndi cat ed.

1. 2 OCCUPANCY OF PREMI SES

The ent i r e bui l di ng wi l l be vacat ed dur i ng t he ent i r e cour se of t he wor k.

Bef or e wor k i s st ar t ed, ar r ange wi t h t he Cont r act i ng Of f i cer a sequence of pr ocedur e, means of access, space f or st or age of mat er i al s and equi pment , and use of appr oaches, cor r i dor s, and st ai r ways.

1. 3 LOCATI ON OF UNDERGROUND UTI LI TI ES

Obt ai n di ggi ng per mi t s pr i or t o st ar t of excavat i on, and compl y wi t h I nst al l at i on r equi r ement s f or l ocat i ng and mar ki ng under gr ound ut i l i t i es.

Di ggi ng per mi t s must be submi t t ed at l east 2 weeks pr i or t o excavat i ng.

Cont act l ocal ut i l i t y l ocat i ng ser vi ce a mi ni mum of 72 hour s pr i or t o excavat i ng, t o mar k ut i l i t i es, and wi t hi n suf f i c i ent t i me r equi r ed i f wor k occur s on a Monday or af t er a Hol i day. Ver i f y exi st i ng ut i l i t y l ocat i ons i ndi cat ed on cont r act dr awi ngs, wi t hi n ar ea of wor k.

1. 4 SALVAGE MATERI AL AND EQUI PMENT

I t ems desi gnat ed by t he Cont r act i ng Of f i cer t o be sal vaged r emai n t he pr oper t y of t he Gover nment . Segr egat e, i t emi ze, del i ver and of f - l oad t he sal vaged pr oper t y at t he Gover nment desi gnat ed st or age ar ea l ocat ed wi t hi n t he base per i met er .

PART 2 PRODUCTS

Not used.

PART 3 EXECUTI ON

Not used.

- - End of Sect i on - -

SECTI ON 01 11 00 Page 1

SECTI ON 01 14 00

WORK RESTRI CTI ONS

PART 1 GENERAL

1. 1 SPECI AL SCHEDULI NG REQUI REMENTS

a. Have mat er i al s, equi pment , and per sonnel r equi r ed t o per f or m t he wor k at t he s i t e pr i or t o t he commencement of t he wor k. The ent i r e bui l di ng wi l l be vacat ed dur i ng t he ent i r e cour se of t he wor k.

b. Per mi ssi on t o i nt er r upt any r oads or ut i l i t y ser vi ce must be r equest ed a mi ni mum of 14 cal endar days pr i or t o t he desi r ed dat e of i nt er r upt i on. Road cut s ar e not al l owed unl ess speci f i cal l y i dent i f i ed i n t he desi gn document s.

1. 2 CONTRACTOR ACCESS AND USE OF PREMI SES

1. 2. 1 Base Regul at i ons

Ensur e t hat Cont r act or per sonnel empl oyed on t he Base become f ami l i ar wi t h and obey Base r egul at i ons i ncl udi ng saf et y, f i r e, t r af f i c and secur i t y r egul at i ons. Keep wi t hi n t he l i mi t s of t he wor k and avenues of i ngr ess and egr ess. Wear har d hat s i n desi gnat ed ar eas. Do not ent er any r est r i c t ed ar eas unl ess r equi r ed t o do so and unt i l c l ear ed f or such ent r y. Mar k Cont r act or equi pment f or i dent i f i cat i on.

1. 2. 1. 1 I dent i f i cat i on Badges and I nst al l at i on Access

Appl i cat i on f or and use of badges wi l l be as di r ect ed by t he Cont r act i ng Of f i cer . I mmedi at el y r epor t i nst ances of l ost or st ol en badges t o t he Cont r act i ng Of f i cer .

1. 2. 1. 2 No Smoki ng Pol i cy

Smoki ng i s pr ohi bi t ed wi t hi n and out s i de of al l bui l di ngs on i nst al l at i on, except i n desi gnat ed smoki ng ar eas. Thi s appl i es t o exi st i ng bui l di ngs, bui l di ngs under const r uct i on and bui l di ngs under r enovat i on. Di scar di ng t obacco mat er i al s ot her t han i nt o desi gnat ed t obacco r ecept acl es i s consi der ed l i t t er i ng and i s subj ect t o f i nes. The Cont r act i ng Of f i cer wi l l i dent i f y desi gnat ed smoki ng ar eas.

1. 2. 2 Wor ki ng Hour s

Regul ar wor ki ng hour s must consi st of a per i od bet ween 7 a. m. and 4: 00

p. m. , Monday t hr ough Fr i day, , excl udi ng Gover nment hol i days.

1. 2. 3 Wor k Out si de Regul ar Hour s

Wor k out s i de r egul ar wor ki ng hour s r equi r es Cont r act i ng Of f i cer appr oval .

Make appl i cat i on 72 hour s pr i or t o such wor k t o al l ow ar r angement s t o be made by t he Gover nment f or i nspect i ng t he wor k i n pr ogr ess, gi v i ng t he speci f i c dat es, hour s, l ocat i on, t ype of wor k t o be per f or med, cont r act number and pr oj ect t i t l e. Based on t he j ust i f i cat i on pr ovi ded, t he Cont r act i ng Of f i cer may appr ove wor k out s i de r egul ar hour s. Dur i ng per i ods

SECTI ON 01 14 00 Page 1 of dar kness, t he di f f er ent par t s of t he wor k must be l i ght ed i n a manner appr oved by t he Cont r act i ng Of f i cer . Make ut i l i t y cut over s af t er nor mal wor ki ng hour s or on Sat ur days, Sundays, and Gover nment hol i days unl ess di r ect ed ot her wi se.

1. 2. 4 Ut i l i t y Cut over s and I nt er r upt i ons

a. Make ut i l i t y cut over s and i nt er r upt i ons af t er nor mal wor ki ng hour s or on Sat ur days, Sundays, and Gover nment hol i days. Conf or m t o pr ocedur es r equi r ed par agr aph WORK OUTSI DE REGULAR HOURS.

b. Ensur e t hat new ut i l i t y l i nes ar e compl et e, except f or t he connect i on, bef or e i nt er r upt i ng exi st i ng ser v i ce.

c. I nt er r upt i on t o wat er , sani t ar y sewer , st or m sewer , t el ephone ser vi ce, el ect r i c ser vi ce, ai r condi t i oni ng, heat i ng, f i r e al ar m, compr essed ai r , and ot her maj or ut i l i t i es ar e consi der ed ut i l i t y cut over s pur suant t o t he par agr aph WORK OUTSI DE REGULAR HOURS.

1. 3 SECURI TY REQUI REMENTS

Cont r act Cl ause " FAR 52. 204- 2, Secur i t y Requi r ement s and Al t er nat e I I , " " FAC 5252. 236- 9301, Speci al Wor ki ng Condi t i ons and Ent r y t o Wor k Ar ea, " shal l appl y:

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

Not Used

SECTI ON 01 14 00 Page 2

SECTI ON 01 30 00

ADMI NI STRATI VE REQUI REMENTS

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual

1. 2 SUBMITTALS

Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL

PROCEDURES:

SD- 04 Sampl es

Col or Boar ds; G

1. 3 COLOR BOARDS FOR AI R FORCE PROJECTS

Submi t one set of col or boar ds wi t hi n 90 cal endar days af t er Cont r act Awar d. Each set of boar ds must i ncl ude sampl es of col or s and f i ni shes of i nt er i or sur f aces, such as wal l s, f l oor s, and cei l i ngs. Pr esent t he sampl es on 8 by 10- 1/ 2 i nches boar ds ( modul es) wi t h a maxi mum spr ead of 24 by 31- 1/ 2 i nches f or f ol dout s. Desi gn modul es t o f i t i n a st andar d l oose- l eaf , t hr ee- r i ng bi nder . Wher e speci al f i ni shes such as ar chi t ect ur al concr et e, car pet , or pr ef i ni shed t ext ur ed met al panel s ar e r equi r ed, submi t sampl es not l ess t han 12 i nches squar e wi t h t he boar d. I f mor e space i s needed, mor e t han one boar d per set may be submi t t ed.

Cer t i f y t hat t he col or sampl es have been r evi ewed i n det ai l , and t hat t he col or sampl es ar e i n st r i c t accor dance wi t h cont r act dr awi ngs and speci f i cat i ons, except as may be ot her wi se expl i c i t l y st at ed. Submi t t al of col or sampl es does not r el i eve t he Cont r act or of t he r esponsi bi l i t y t o submi t sampl es r equi r ed el sewher e her ei n.

1. 4 MI NI MUM I NSURANCE REQUI REMENTS

Pr ovi de t he mi ni mum i nsur ance cover age r equi r ed by FAR 28. 307- 2 LI ABI LI TY, dur i ng t he ent i r e per i od of per f or mance under t hi s cont r act . Pr ovi de ot her i nsur ance cover age as r equi r ed by l aw.

1. 5 SUPERVISION

1. 5. 1 Mi ni mum Communi cat i on Requi r ement s

Have at l east one qual i f i ed super i nt endent , or compet ent al t er nat e, capabl e of r eadi ng, wr i t i ng, and conver si ng f l uent l y i n t he Engl i sh l anguage, on t he j ob- si t e at al l t i mes dur i ng t he per f or mance of cont r act wor k.

SECTI ON 01 30 00 Page 1

1. 5. 2 Super i nt endent Qual i f i cat i ons

The pr oj ect super i nt endent must have a mi ni mum of 5 year s exper i ence i n const r uct i on wi t h at l east 2 of t hose year s as a super i nt endent on pr oj ect s s i mi l ar i n s i ze and compl exi t y. The i ndi v i dual must be f ami l i ar wi t h t he r equi r ement s of EM 385- 1- 1 and have exper i ence i n t he ar eas of hazar d i dent i f i cat i on and saf et y compl i ance, t o i ncl ude successf ul compl et i on of t he OSHA 10- hour Tr ai ni ng Cour se wi t hi n t he past 3 year s. The i ndi v i dual must be capabl e of i nt er pr et i ng a cr i t i cal pat h schedul e and const r uct i on dr awi ngs. The qual i f i cat i on r equi r ement s f or t he al t er nat e super i nt endent ar e t he same as f or t he pr oj ect super i nt endent . The Cont r act i ng Of f i cer may r equest pr oof of t he super i nt endent ' s qual i f i cat i ons at any poi nt i n t he pr oj ect i f t he per f or mance of t he super i nt endent i s i n quest i on.

1. 5. 2. 1 Duties

The pr oj ect super i nt endent i s pr i mar i l y r esponsi bl e f or managi ng and coor di nat i ng day- t o- day pr oduct i on and schedul e adher ence on t he pr oj ect .

The super i nt endent i s r equi r ed t o at t end par t ner i ng meet i ngs, and qual i t y cont r ol meet i ngs. The super i nt endent or qual i f i ed al t er nat i ve must be on- si t e at al l t i mes dur i ng t he per f or mance of t hi s cont r act unt i l t he wor k i s compl et ed and accept ed.

1. 5. 3 Non- Compl i ance Act i ons

The Pr oj ect Super i nt endent i s subj ect t o r emoval by t he Cont r act i ng Of f i cer f or non- compl i ance wi t h r equi r ement s speci f i ed i n t he cont r act and f or f ai l ur e t o manage t he pr oj ect t o i nsur e t i mel y compl et i on. Fur t her mor e, t he Cont r act i ng Of f i cer may i ssue an or der st oppi ng al l or par t of t he wor k unt i l sat i sf act or y cor r ect i ve act i on has been t aken. No par t of t he t i me l ost due t o such st op or der s i s accept abl e as t he subj ect of c l ai m f or ext ensi on of t i me, f or excess cost s or damages by t he Cont r act or .

1. 6 PRECONSTRUCTION

Af t er awar d of t he cont r act but pr i or t o commencement of any wor k at t he s i t e, meet wi t h t he Cont r act i ng Of f i cer t o di scuss and devel op a mut ual under st andi ng r el at i ve t o t he admi ni st r at i on of t he val ue engi neer i ng and saf et y pr ogr am, pr epar at i on of t he schedul e of pr i ces or ear ned val ue r epor t , shop dr awi ngs, and ot her submi t t al s, schedul i ng pr ogr ammi ng, pr osecut i on of t he wor k, and cl ear expect at i ons of t he " I nt er i m DD For m 1354" Submi t t al . Maj or subcont r act or s who wi l l engage i n t he wor k must al so at t end.

1. 7 PARTNERING

To most ef f ect i vel y accompl i sh t hi s cont r act , t he Gover nment r equi r es t he f or mat i on of a cohesi ve par t ner shi p wi t hi n t he Pr oj ect Team whose member s ar e f r om t he Gover nment , t he Cont r act or and t hei r Subcont r act or s. Key per sonnel f r om t he Suppor t ed Command, t he End User ( who wi l l occupy t he f aci l i t y) , t he Gover nment Desi gn and Const r uct i on t eam and Subj ect Mat t er Exper t s, t he I nst al l at i on, t he Cont r act or and Subcont r act or s, and t he Desi gner of Recor d wi l l be i nvi t ed t o par t i c i pat e i n t he Par t ner i ng pr ocess. The Par t ner shi p wi l l dr aw on t he st r engt h of each or gani zat i on i n an ef f or t t o achi eve a pr oj ect t hat i s wi t hout any saf et y mi shaps, conf or ms t o t he Cont r act , and st ays wi t hi n budget and on schedul e.

The Cont r act i ng Of f i cer wi l l pr ovi de I nf or mat i on on t he Par t ner i ng Pr ocess and a l i s t of key and opt i onal per sonnel who shoul d at t end t he Par t ner i ng

SECTI ON 01 30 00 Page 2 meeting.

1. 8 ELECTRONI C MAI L ( E- MAI L) ADDRESS

Est abl i sh and mai nt ai n el ect r oni c mai l ( e- mai l ) capabi l i t y al ong wi t h t he capabi l i t y t o open var i ous el ect r oni c at t achment s as t ext f i l es, pdf f i l es, and ot her s i mi l ar f or mat s. Wi t hi n 10 days af t er cont r act awar d, pr ovi de t he Cont r act i ng Of f i cer a s i ngl e ( onl y one) e- mai l addr ess f or el ect r oni c communi cat i ons f r om t he Cont r act i ng Of f i cer r el at ed t o t hi s cont r act i ncl udi ng, but not l i mi t ed t o cont r act document s, i nvoi ce i nf or mat i on, r equest f or pr oposal s, and ot her cor r espondence. The Cont r act i ng Of f i cer may al so use emai l t o not i f y t he Cont r act or of base access condi t i ons when emer gency condi t i ons war r ant , such as hur r i canes or t er r or i st t hr eat s.

Mul t i pl e emai l addr esses ar e not al l owed.

I t i s t he Cont r act or ' s r esponsi bi l i t y t o make t i mel y di st r i but i on of al l Cont r act i ng Of f i cer i ni t i at ed e- mai l wi t h i t s own or gani zat i on i ncl udi ng f i el d of f i ce( s) . Pr ompt l y not i f y t he Cont r act i ng Of f i cer , i n wr i t i ng, of any changes t o t hi s emai l addr ess.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

Not Used

SECTI ON 01 30 00 Page 3

SECTI ON 01 33 00

SUBMI TTAL PROCEDURES

PART 1 GENERAL

1. 1 DEFINITIONS

1. 1. 1 Submi t t al Descr i pt i ons ( SD)

Submi t t al s r equi r ement s ar e speci f i ed i n t he t echni cal sect i ons.

Submi t t al s ar e i dent i f i ed by Submi t t al Descr i pt i on ( SD) number s and t i t l es as f ol l ows:

SD- 01 Pr econst r uct i on Submi t t al s

Submi t t al s whi ch ar e r equi r ed pr i or t o st ar t of const r uct i on.

Cer t i f i cat es of i nsur ance

Sur et y bonds

Const r uct i on pr ogr ess schedul e

Submi t t al r egi st er

Envi r onment al pr ot ect i on pl an

SD- 02 Shop Dr awi ngs

Dr awi ngs, di agr ams and schedul es speci f i cal l y pr epar ed t o i l l ust r at e some por t i on of t he wor k.

Di agr ams and i nst r uct i ons f r om a manuf act ur er or f abr i cat or f or use i n pr oduci ng t he pr oduct and as ai ds t o t he Cont r act or f or i nt egr at i ng t he pr oduct or syst em i nt o t he pr oj ect .

Dr awi ngs pr epar ed by or f or t he Cont r act or t o show how mul t i pl e syst ems and i nt er di sci pl i nar y wor k wi l l be coor di nat ed.

SD- 03 Pr oduct Dat a

Cat al og cut s, i l l ust r at i ons, schedul es, di agr ams, per f or mance char t s, i nst r uct i ons and br ochur es i l l ust r at i ng s i ze, physi cal appear ance and ot her char act er i st i cs of mat er i al s, syst ems or equi pment f or some por t i on of t he wor k.

Sampl es of war r ant y l anguage when t he cont r act r equi r es ext ended pr oduct war r ant i es.

SD- 04 Sampl es

Fabr i cat ed or unf abr i cat ed physi cal exampl es of mat er i al s, equi pment or wor kmanshi p t hat i l l ust r at e f unct i onal and aest het i c char act er i st i cs of a mat er i al or pr oduct and est abl i sh st andar ds by whi ch t he wor k can be judged.

SECTI ON 01 33 00 Page 1

Col or sampl es f r om t he manuf act ur er ' s st andar d l i ne ( or cust om col or sampl es i f speci f i ed) t o be used i n sel ect i ng or appr ovi ng col or s f or t he pr oj ect .

Fi el d sampl es and mock- ups const r uct ed on t he pr oj ect s i t e est abl i sh st andar ds by whi ch t he ensur i ng wor k can be j udged. I ncl udes assembl i es or por t i ons of assembl i es whi ch ar e t o be i ncor por at ed i nt o t he pr oj ect and t hose whi ch wi l l be r emoved at concl usi on of t he wor k.

SD- 05 Desi gn Dat a

Desi gn cal cul at i ons, mi x desi gns, anal yses or ot her dat a per t ai ni ng t o a par t of wor k.

SD- 06 Test Repor t s

Repor t s i gned by aut hor i zed of f i c i al of t est i ng l abor at or y t hat a mat er i al , pr oduct or syst em i dent i cal t o t he mat er i al , pr oduct or syst em t o be pr ovi ded has been t est ed i n accor d wi t h speci f i ed r equi r ement s. Unl ess speci f i ed i n anot her sect i on, t est i ng must have been wi t hi n t hr ee year s of dat e of cont r act awar d f or t he pr oj ect .

Repor t whi ch i nc l udes f i ndi ngs of a t est r equi r ed t o be per f or med by t he Cont r act or on an act ual por t i on of t he wor k or pr ot ot ype pr epar ed f or t he pr oj ect bef or e shi pment t o j ob s i t e.

Repor t whi ch i nc l udes f i ndi ng of a t est made at t he j ob s i t e or on sampl e t aken f r om t he j ob s i t e, on por t i on of wor k dur i ng or af t er installation.

I nvest i gat i on r epor t s.

Dai l y l ogs and checkl i st s.

Fi nal accept ance t est and oper at i onal t est pr ocedur e.

SD- 07 Cer t i f i cat es

St at ement s pr i nt ed on t he manuf act ur er ' s l et t er head and si gned by r esponsi bl e of f i c i al s of manuf act ur er of pr oduct , syst em or mat er i al at t est i ng t hat t he pr oduct , syst em, or mat er i al meet s speci f i cat i on r equi r ement s. Must be dat ed af t er awar d of pr oj ect cont r act and cl ear l y name t he pr oj ect .

Document r equi r ed of Cont r act or , or of a manuf act ur er , suppl i er , i nst al l er or Subcont r act or t hr ough Cont r act or . The document pur pose i s t o f ur t her pr omot e t he or der l y pr ogr essi on of a por t i on of t he wor k by document i ng pr ocedur es, accept abi l i t y of met hods, or per sonnel qualifications.

Conf i ned space ent r y per mi t s.

Text of post ed oper at i ng i nst r uct i ons.

SD- 08 Manuf act ur er ' s I nst r uct i ons

Pr epr i nt ed mat er i al descr i bi ng i nst al l at i on of a pr oduct , syst em or mat er i al , i ncl udi ng speci al not i ces and ( MSDS) concer ni ng i mpedances, hazar ds and saf et y pr ecaut i ons.

SECTI ON 01 33 00 Page 2

SD- 10 Oper at i on and Mai nt enance Dat a

Dat a t hat i s f ur ni shed by t he manuf act ur er , or t he syst em pr ovi der , t o t he equi pment oper at i ng and mai nt enance per sonnel , i ncl udi ng manuf act ur er ' s hel p and pr oduct l i ne document at i on necessar y t o mai nt ai n and i nst al l equi pment . Thi s dat a i s needed by oper at i ng and mai nt enance per sonnel f or t he saf e and ef f i c i ent oper at i on, mai nt enance and r epai r of t he i t em.

Thi s dat a i s i nt ended t o be i ncor por at ed i n an oper at i ons and mai nt enance manual or cont r ol syst em.

SD- 11 Cl oseout Submi t t al s

Document at i on t o r ecor d compl i ance wi t h t echni cal or admi ni st r at i ve r equi r ement s or t o est abl i sh an admi ni st r at i ve mechani sm.

Speci al r equi r ement s necessar y t o pr oper l y c l ose out a const r uct i on cont r act . For exampl e, Recor d Dr awi ngs and as- bui l t dr awi ngs. Al so, submi t t al r equi r ement s necessar y t o pr oper l y c l ose out a maj or phase of const r uct i on on a mul t i - phase cont r act .

1. 1. 2 Appr ovi ng Aut hor i t y

Of f i ce or desi gnat ed per son aut hor i zed t o appr ove submi t t al .

1. 1. 3 Work

As used i n t hi s sect i on, on- and of f - s i t e const r uct i on r equi r ed by cont r act document s, i ncl udi ng l abor necessar y t o pr oduce submi t t al s, const r uct i on, mat er i al s, pr oduct s, equi pment , and syst ems i ncor por at ed or t o be i ncor por at ed i n such const r uct i on.

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or t he f ol l owi ng i n accor dance wi t h t hi s section.

SD- 01 Pr econst r uct i on Submi t t al s

Submi t t al Regi st er

1. 3 SUBMI TTAL CLASSI FI CATI ON

Submi t t al s ar e c l assi f i ed as f ol l ows:

1. 3. 1 Gover nment Appr oved ( G)

Gover nment appr oval i s r equi r ed f or ext ensi ons of desi gn, cr i t i cal mat er i al s, devi at i ons, equi pment whose compat i bi l i t y wi t h t he ent i r e syst em must be checked, and ot her i t ems as desi gnat ed by t he Cont r act i ng Of f i cer .

Wi t hi n t he t er ms of t he Cont r act Cl ause SPECI FI CATI ONS AND DRAWI NGS FOR CONSTRUCTI ON, t hey ar e consi der ed t o be " shop dr awi ngs. "

SECTI ON 01 33 00 Page 3

1. 4 PREPARATION

1. 4. 1 Tr ansmi t t al For m

Ut i l i ze t he el ect r oni c Adobe PDF ver si on of t he Ai r For ce For m 3000 Mat er i al Appr oval Submi t t al avai l abl e on t he Ai r For ce E- Publ i shi ng web page. Use separ at e f or ms f or di f f er ent engi neer i ng di sci pl i nes.

1. 4. 2 Sour ce Dr awi ngs f or Shop Dr awi ngs

The ent i r e set of Sour ce Dr awi ng f i l es ( DWG) wi l l be pr ovi ded t o t he Cont r act or . These dr awi ngs may onl y be pr ovi ded af t er awar d.

1. 4. 2. 1 Ter ms and Condi t i ons

Dat a cont ai ned on t hese el ect r oni c f i l es must not be used f or any pur pose ot her t han as a conveni ence i n t he pr epar at i on of const r uct i on dat a f or t he r ef er enced pr oj ect . Any ot her use or r euse shal l be at t he sol e r i sk of t he Cont r act or and wi t hout l i abi l i t y or l egal exposur e t o t he Gover nment .

The Cont r act or must make no c l ai m and wai ves t o t he f ul l est ext ent per mi t t ed by l aw, any c l ai m or cause of act i on of any nat ur e agai nst t he Gover nment , i t s agent s or sub consul t ant s t hat may ar i se out of or i n connect i on wi t h t he use of t hese el ect r oni c f i l es. The Cont r act or must , t o t he f ul l est ext ent per mi t t ed by l aw, i ndemni f y and hol d t he Gover nment har ml ess agai nst al l damages, l i abi l i t i es or cost s, i ncl udi ng r easonabl e at t or ney' s f ees and def ense cost s, ar i s i ng out of or r esul t i ng f r om t he use of t hese el ect r oni c f i l es.

These el ect r oni c Sour ce Dr awi ng f i l es ar e not const r uct i on document s.

Di f f er ences may exi st bet ween t he Sour ce Dr awi ng f i l es and t he cor r espondi ng const r uct i on document s. The Gover nment makes no r epr esent at i on r egar di ng t he accur acy or compl et eness of t he el ect r oni c Sour ce Dr awi ng f i l es, nor does i t make r epr esent at i on t o t he compat i bi l i t y of t hese f i l es wi t h t he Cont r act or har dwar e or sof t war e. I n t he event t hat a conf l i c t ar i ses bet ween t he s i gned and seal ed const r uct i on document s pr epar ed by t he Gover nment and t he f ur ni shed Sour ce Dr awi ng f i l es, t he s i gned and seal ed const r uct i on document s gover n. The Cont r act or i s r esponsi bl e f or det er mi ni ng i f any conf l i c t exi st s. Use of t hese Sour ce Dr awi ng f i l es does not r el i eve t he Cont r act or of dut y t o f ul l y compl y wi t h t he cont r act document s, i ncl udi ng and wi t hout l i mi t at i on, t he need t o check, conf i r m and coor di nat e t he wor k of al l cont r act or s f or t he pr oj ect .

I f t he Cont r act or uses, dupl i cat es or modi f i es t hese el ect r oni c Sour ce Dr awi ng f i l es f or use i n pr oduci ng const r uct i on dat a r el at ed t o t hi s cont r act , r emove al l pr evi ous i ndi c i a of owner shi p ( seal s, l ogos, s i gnat ur es, i ni t i al s and dat es) .

1. 4. 3 El ect r oni c Fi l e For mat

Pr ovi de submi t t al s i n el ect r oni c f or mat , wi t h t he except i on of mat er i al sampl es r equi r ed f or SD- 04 Sampl es i t ems. Compi l e t he submi t t al f i l e as a s i ngl e, compl et e document , t o i nc l ude t he Tr ansmi t t al For m descr i bed wi t hi n. Name t he el ect r oni c submi t t al f i l e speci f i cal l y accor di ng t o i t s cont ent s, coor di nat e t he f i l e nami ng convent i on wi t h t he Cont r act i ng Of f i cer . El ect r oni c f i l es must be of suf f i c i ent qual i t y t hat al l i nf or mat i on i s l egi bl e. Use PDF as t he el ect r oni c f or mat , unl ess ot her wi se speci f i ed or di r ect ed by t he Cont r act i ng Of f i cer . When r equi r ed, t he el ect r oni c f i l e must i ncl ude a val i d el ect r oni c s i gnat ur e, or scan of a signature.

SECTI ON 01 33 00 Page 4

Pr ovi de el ect r oni c document s t hr ough AMRDEC SAFE Web Appl i cat i on l ocat ed at t he f ol l owi ng websi t e: https://safe.amrdec.army.mil/safe/ . DO NOT

E- MAI L SUBMI TTALS.

When r equi r ed, pr ovi de har d copi es of submi t t al s when r equest ed by t he Cont r act i ng Of f i cer . Up t o 2 addi t i onal har d copi es of any submi t t al may be r equest ed at t he di scr et i on of t he Cont r act i ng Of f i cer , at no addi t i onal cost t o t he Gover nment .

1. 5 QUANTI TY OF SUBMI TTALS

1. 5. 1 Number of Sampl es SD- 04 Sampl es

a. Submi t t wo sampl es, or t wo set s of sampl es showi ng r ange of var i at i on, of each r equi r ed i t em. One appr oved sampl e or set of sampl es wi l l be r et ai ned by appr ovi ng aut hor i t y and one wi l l be r et ur ned t o Cont r act or .

b. Submi t one sampl e panel or pr ovi de one sampl e i nst al l at i on wher e di r ect ed. I ncl ude component s l i s t ed i n t echni cal sect i on or as directed.

c. Submi t one sampl e i nst al l at i on, wher e di r ect ed.

d. Submi t one sampl e of non- sol i d mat er i al s.

1. 6 I NFORMATI ON ONLY SUBMI TTALS

Nor mal l y submi t t al s f or i nf or mat i on onl y wi l l not be r et ur ned. Appr oval of t he Cont r act i ng Of f i cer i s not r equi r ed on i nf or mat i on onl y submi t t al s.

The Gover nment r eser ves t he r i ght t o r equi r e t he Cont r act or t o r esubmi t any i t em f ound not t o compl y wi t h t he cont r act . Thi s does not r el i eve t he Cont r act or f r om t he obl i gat i on t o f ur ni sh mat er i al conf or mi ng t o t he pl ans and speci f i cat i ons; wi l l not pr event t he Cont r act i ng Of f i cer f r om r equi r i ng r emoval and r epl acement of nonconf or mi ng mat er i al i ncor por at ed i n t he wor k;

and does not r el i eve t he Cont r act or of t he r equi r ement t o f ur ni sh sampl es f or t est i ng by t he Gover nment l abor at or y or f or check t est i ng by t he Gover nment i n t hose i nst ances wher e t he t echni cal speci f i cat i ons so pr escr i be.

1. 7 SUBMI TTAL REGI STER

Pr epar e and mai nt ai n submi t t al r egi st er , as t he wor k pr ogr esses. Do not change dat a whi ch i s out put i n col umns ( c) , ( d) , ( e) , and ( f ) as del i ver ed by Gover nment ; r et ai n dat a whi ch i s out put i n col umns ( a) , ( g) , ( h) , and ( i ) as appr oved. A submi t t al r egi st er showi ng i t ems of equi pment and mat er i al s f or whi ch submi t t al s ar e r equi r ed by t he speci f i cat i ons i s pr ovi ded as an at t achment . Thi s l i s t may not be al l i ncl usi ve and addi t i onal submi t t al s may be r equi r ed.

Col umn ( c) : Li s t s speci f i cat i on sect i on i n whi ch submi t t al i s required.

Col umn ( d) : Li s t s each submi t t al descr i pt i on ( SD No. and t ype,

e. g. SD- 02 Shop Dr awi ngs) r equi r ed i n each speci f i cat i on sect i on.

Col umn ( e) : Li s t s one pr i nci pal par agr aph i n speci f i cat i on sect i on wher e a mat er i al or pr oduct i s speci f i ed. Thi s l i s t i ng i s onl y t o f aci l i t at e l ocat i ng submi t t ed r equi r ement s. Do not consi der ent r i es i n col umn ( e) as l i mi t i ng pr oj ect r equi r ement s.

SECTI ON 01 33 00 Page 5

1. 8 VARIATIONS

Var i at i ons f r om cont r act r equi r ement s r equi r e Gover nment appr oval and wi l l be consi der ed wher e advant ageous t o Gover nment .

1. 8. 1 Consi der i ng Var i at i ons

Di scussi on wi t h Cont r act i ng Of f i cer pr i or t o submi ssi on wi l l hel p ensur e f unct i onal and qual i t y r equi r ement s ar e met and mi ni mi ze r ej ect i ons and r e- submi t t al s. When cont empl at i ng a var i at i on whi ch r esul t s i n l ower cost , consi der submi ssi on of t he var i at i on as a Val ue Engi neer i ng Change Pr oposal

(VECP).

Speci f i cal l y poi nt out var i at i ons f r om cont r act r equi r ement s i n t r ansmi t t al l et t er s. Fai l ur e t o poi nt out devi at i ons may r esul t i n t he Gover nment r equi r i ng r ej ect i on and r emoval of such wor k at no addi t i onal cost t o t he Government.

1. 8. 2 Pr oposi ng Var i at i ons

When pr oposi ng var i at i on, del i ver wr i t t en r equest t o t he Cont r act i ng Of f i cer , wi t h document at i on of t he nat ur e and f eat ur es of t he var i at i on and why t he var i at i on i s desi r abl e and benef i c i al t o t he Gover nment . I f l ower cost i s a benef i t , al so i ncl ude an est i mat e of t he cost savi ngs. I n addi t i on t o document at i on r equi r ed f or var i at i on, i ncl ude t he submi t t al s r equi r ed f or t he i t em. Cl ear l y mar k t he pr oposed var i at i on i n al l documentation.

1. 9 SCHEDULING

Schedul e and submi t concur r ent l y submi t t al s cover i ng component i t ems f or mi ng a syst em or i t ems t hat ar e i nt er r el at ed. I ncl ude cer t i f i cat i ons t o be submi t t ed wi t h t he per t i nent dr awi ngs at t he same t i me. No del ay damages or t i me ext ensi ons wi l l be al l owed f or t i me l ost i n l at e submi t t al s.

a. Coor di nat e schedul i ng, sequenci ng, pr epar i ng and pr ocessi ng of submi t t al s wi t h per f or mance of wor k so t hat wor k wi l l not be del ayed by submi t t al pr ocessi ng. Al l ow f or pot ent i al r esubmi t t al of r equi r ement s.

b. Submi t t al s cal l ed f or by t he cont r act document s wi l l be l i s t ed on t he r egi st er . Appr oval by t he Cont r act i ng Of f i cer does not r el i eve t he Cont r act or of suppl y i ng submi t t al s r equi r ed by t he cont r act document s but whi ch have been omi t t ed f r om t he r egi st er or mar ked " N/ A. "

c. Except as speci f i ed ot her wi se, al l ow gover nment r evi ew per i od, begi nni ng wi t h t he r ecei pt by appr ovi ng aut hor i t y, t hat i ncl udes at l east 20 wor ki ng days f or Cont r act i ng Of f i cer appr oval . For submi t t al s r equi r i ng r evi ew by f i r e pr ot ect i on engi neer , al l ow gover nment r evi ew per i od, begi nni ng wi t h t he r ecei pt by appr ovi ng aut hor i t y, t hat i ncl udes 30 wor ki ng days f or Cont r act i ng Of f i cer appr oval . .

d. Per i od of r evi ew f or each r esubmi t t al i s t he same as f or i ni t i al submi t t al . Addi t i onal cont r act per f or mance t i me wi l l not be gi ven f or di sappr oved submi t t al s.

1. 10 GOVERNMENT APPROVI NG AUTHORI TY

When appr ovi ng aut hor i t y i s Cont r act i ng Of f i cer , t he Gover nment wi l l :

SECTI ON 01 33 00 Page 6

a. Not e dat e on whi ch submi t t al was r ecei ved.

b. Revi ew submi t t al s f or appr oval wi t hi n schedul i ng per i od speci f i ed and onl y f or conf or mance wi t h pr oj ect desi gn concept s and compl i ance wi t h cont r act document s.

c. I dent i f y r et ur ned submi t t al s wi t h one of t he act i ons def i ned i n par agr aph REVI EW NOTATI ONS and wi t h mar ki ngs appr opr i at e f or act i on indicated.

Upon compl et i on of r evi ew of submi t t al s r equi r i ng Gover nment appr oval , st amp and dat e submi t t al s.

1. 10. 1 Revi ew Not at i ons

Submi t t al s wi l l be r et ur ned t o t he Cont r act or wi t h t he f ol l owi ng not at i ons:

a. Submi t t al s mar ked " appr oved" or " accept ed" aut hor i ze t he Cont r act or t o pr oceed wi t h t he wor k cover ed.

b. Submi t t al s mar ked " appr oved as not ed" or " appr oved, except as not ed, r esubmi t t al not r equi r ed, " aut hor i ze t he Cont r act or t o pr oceed wi t h t he wor k cover ed pr ovi ded he t akes no except i on t o t he cor r ect i ons.

c. Submi t t al s mar ked " not appr oved" or " di sappr oved, " or " r evi se and r esubmi t , " i ndi cat e noncompl i ance wi t h t he cont r act r equi r ement s or desi gn concept , or t hat submi t t al i s i ncompl et e. Resubmi t wi t h appr opr i at e changes. No wor k shal l pr oceed f or t hi s i t em unt i l r esubmi t t al i s appr oved.

d. Submi t t al s mar ked " not r evi ewed" wi l l i ndi cat e submi t t al has been pr evi ousl y r evi ewed and appr oved, i s not r equi r ed, does not have evi dence of bei ng r evi ewed and appr oved by Cont r act or , or i s not compl et e. A submi t t al mar ked " not r evi ewed" wi l l be r et ur ned wi t h an expl anat i on of t he r eason i t i s not r evi ewed. Resubmi t submi t t al s r et ur ned f or l ack of r evi ew by Cont r act or or f or bei ng i ncompl et e, wi t h appr opr i at e act i on, coor di nat i on, or change.

1. 11 DI SAPPROVED OR REJECTED SUBMI TTALS

Make cor r ect i ons r equi r ed by t he Cont r act i ng Of f i cer . I f t he Cont r act or consi der s any cor r ect i on or not at i on on t he r et ur ned submi t t al s t o const i t ut e a change t o t he cont r act dr awi ngs or speci f i cat i ons; not i ce i s t o be gi ven t o t he Cont r act i ng Of f i cer . Cont r act or i s r esponsi bl e f or t he di mensi ons and desi gn of connect i on det ai l s and const r uct i on of wor k.

Fai l ur e t o poi nt out devi at i ons may r esul t i n t he Gover nment r equi r i ng r ej ect i on and r emoval of such wor k at t he Cont r act or ' s expense.

I f changes ar e necessar y t o submi t t al s, make such r evi s i ons and submi ssi on of t he submi t t al s i n accor dance wi t h t he pr ocedur es above. No i t em of wor k r equi r i ng a submi t t al change i s t o be accompl i shed unt i l t he changed submi t t al s ar e appr oved.

1. 12 APPROVED/ ACCEPTED SUBMI TTALS

The Cont r act i ng Of f i cer ' s appr oval or accept ance of submi t t al s i s not t o be const r ued as a compl et e check, and i ndi cat es onl y t hat t he gener al met hod of const r uct i on, mat er i al s, det ai l i ng and ot her i nf or mat i on appear t o meet t he Sol i c i t at i on and Accept ed Pr oposal

SECTI ON 01 33 00 Page 7

Appr oval or accept ance wi l l not r el i eve t he Cont r act or of t he r esponsi bi l i t y f or any er r or whi ch may exi st , as t he Cont r act or i s r esponsi bl e f or di mensi ons, t he desi gn of adequat e connect i ons and det ai l s , and t he sat i sf act or y const r uct i on of al l wor k.

Af t er submi t t al s have been appr oved or accept ed by t he Cont r act i ng Of f i cer , no r esubmi t t al f or t he pur pose of subst i t ut i ng mat er i al s or equi pment wi l l be consi der ed unl ess accompani ed by an expl anat i on of why a subst i t ut i on i s necessary.

1. 13 APPROVED SAMPLES

Appr oval of a sampl e i s onl y f or t he char act er i st i cs or use named i n such appr oval and i s not be const r ued t o change or modi f y any cont r act r equi r ement s. Bef or e submi t t i ng sampl es, t he Cont r act or t o assur e t hat t he mat er i al s or equi pment wi l l be avai l abl e i n quant i t i es r equi r ed i n t he pr oj ect . No change or subst i t ut i on wi l l be per mi t t ed af t er a sampl e has been appr oved.

Mat ch t he appr oved sampl es f or mat er i al s and equi pment i ncor por at ed i n t he wor k. I f r equest ed, appr oved sampl es, i ncl udi ng t hose whi ch may be damaged i n t est i ng, wi l l be r et ur ned t o t he Cont r act or , at hi s expense, upon compl et i on of t he cont r act . Sampl es not appr oved wi l l al so be r et ur ned t o t he Cont r act or at i t s expense, i f so r equest ed.

Fai l ur e of any mat er i al s t o pass t he speci f i ed t est s wi l l be suf f i c i ent cause f or r ef usal t o consi der , under t hi s cont r act , any f ur t her sampl es of t he same br and or make of t hat mat er i al . Gover nment r eser ves t he r i ght t o di sappr ove any mat er i al or equi pment whi ch pr evi ousl y has pr oved unsat i sf act or y i n ser vi ce.

Sampl es of var i ous mat er i al s or equi pment del i ver ed on t he s i t e or i n pl ace may be t aken by t he Cont r act i ng Of f i cer f or t est i ng. Sampl es f ai l i ng t o meet cont r act r equi r ement s wi l l aut omat i cal l y voi d pr evi ous appr oval s.

Cont r act or t o r epl ace such mat er i al s or equi pment t o meet cont r act requirements.

Appr oval of t he Cont r act or ' s sampl es by t he Cont r act i ng Of f i cer does not r el i eve t he Cont r act or of hi s r esponsi bi l i t i es under t he cont r act .

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

Not Used

SECTI ON 01 33 00 Page 8

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Line

Acti vity

Trans-mittal #

Specification Section

SD

# Submittal Description Item Submitted Paragraph #

Classificati on: GOVT or A/E Revwr Submit

Approval Needed

By

Material Needed

By Action Code

Date Of Action

Date FWD to APPR / Auth Date RCD From

CONTR

Date FWD To

Other Revwr

Date

RCD

From Other Revwr

Action Code

Date Of Action

Mailed To

CONTR/

Date RCD From

APPR

Authority Remarks

1 01 30 00 04 Samples Color Boards 1.3 G

2 01 33 00 01 Preconstruction Submittals Submittal Register 1.7

3 01 35 26 07 Certificates Confined Space Entry Permit G

4 01 35 26 07 Certificates Hot Work Permit 1.7.1

5 01 50 00 01 Preconstruction Submittals Construction Site Plan 1.3

6 01 50 00 01 Preconstruction Submittals Traffic Control Plan 3.4.1 G

7 01 50 00 06 Test Reports Backflow Preventer Tests 1.4 G

8 01 57 19 01 Preconstruction Submittals Regulatory Notifications 1.5.1 G

9 01 57 19 01 Preconstruction Submittals Environmental Protection Plan 1.6 G

10 01 57 19 01 Preconstruction Submittals Stormwater Notice of Intent 3.2.1.2 G

11 01 57 19 01 Preconstruction Submittals Stormwater Pollution Prevention Plan

(SWPPP) 3.2.1.1 G

12 01 57 19 01 Preconstruction Submittals Dewatering Permit G

13 01 57 19 06 Test Reports Solid Waste Management Report 3.7.1.1 G

14 01 57 19 11 Closeout Submittals Stormwater Pollution Prevention Plan Compliance Notebook 3.2.1.4 G

15 01 57 19 11 Closeout Submittals Stormwater Notice of Termination 3.2.1.5 G

16 01 57 19 11 Closeout Submittals Solid Waste Management Report 3.7.1.1 G

17 01 57 19 11 Closeout Submittals Regulatory Notifications 1.5.1 G

18 01 57 19 11 Closeout Submittals Certification of No Asbestos/Lead-based Paint/PCB Letter 3.20 G

19 01 78 00 03 Product Data Warranty Management Plan 1.4.1 G

20 01 78 00 08 Manufacturer’s Instructions Instructions

21 01 78 00 10 Operation and Maintenance Data Operation and Maintenance Manuals 3.3

22 01 78 00 11 Closeout Submittals As-Built Drawings 3.1 G

23 01 78 00 11 Closeout Submittals Record Drawings 3.2 G

24 01 78 23 10 Operation and Maintenance Data O&M Database 1.4 G

25 01 78 23 10 Operation and Maintenance Data Training Content 3.1.1 G

26 02 41 00 01 Preconstruction Submittals Demolition Plan 1.2.1 G

27 02 41 00 01 Preconstruction Submittals Existing Conditions 1.9

28 02 41 00 07 Certificates Notification 1.6 G

29 02 82 16.00 20 03 Product Data Local Exhaust Equipment 3.1.4 G

30 02 82 16.00 20 03 Product Data Vacuums 3.1.5 G

31 02 82 16.00 20 03 Product Data Respirators 3.1.1.1 G

32 02 82 16.00 20 03 Product Data Pressure Differential Automatic Recording Instrument 3.1.4 G

33 02 82 16.00 20 03 Product Data Amended Water 1.2.2 G

TITLE: Renovate Community Commons B90337

SUBMITTAL REGISTER

JOB NAME:

LOCATION:

CONTRACT NO:

CONTRACTOR:

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: Renovate Community Commons B90337

SUBMITTAL REGISTER

JOB NAME:

LOCATION:

CONTRACT NO:

CONTRACTOR:

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

34 02 82 16.00 20 03 Product Data Material Safety Data Sheets (Msds) for all materials 1.3.8 G

35 02 82 16.00 20 06 Test Reports Air Sampling Results 1.5.5 G

36 02 82 16.00 20 06 Test Reports Pressure Differential Recordings For Local Exhaust System 1.5.6 G

37 02 82 16.00 20 06 Test Reports Asbestos Disposal Quantity Report 3.3.3.2 G

38 02 82 16.00 20 06 Test Reports Clearance Sampling 3.2.5.2 G

39 02 82 16.00 20 07 Certificates Asbestos Hazard Abatement Plan 1.3.9 G

40 02 82 16.00 20 07 Certificates Testing Laboratory 1.3.10 G

41 02 82 16.00 20 07 Certificates Private Qualified Person Documentation 1.5.1 G

42 02 82 16.00 20 07 Certificates Contractor's License 1.5.4 G

43 02 82 16.00 20 07 Certificates Competent Person 1.5.2 G

44 02 82 16.00 20 07 Certificates Worker's License 1.5.3 G

45 02 82 16.00 20 07 Certificates Landfill Approval 1.3.11 G

46 02 82 16.00 20 07 Certificates Employee Training 1.3.3 G

47 02 82 16.00 20 07 Certificates Medical Certification 1.3.12 G

48 02 82 16.00 20 07 Certificates Waste Shipment Records 1.3.11 G

49 02 82 16.00 20 07 Certificates Respiratory Protection Program 1.3.6 G

50 02 82 16.00 20 07 Certificates Delivery Tickets 1.3.11 G

51 02 82 16.00 20 07 Certificates Vacuums 3.1.5 G

52 02 82 16.00 20 07 Certificates Water Filtration Equipment 3.1.2.3 G

53 02 82 16.00 20 07 Certificates Ventilation Systems 3.1.5 G

54 02 82 16.00 20 07 Certificates Equipment Used To Contain Airborne Asbestos Fibers 3.1 G

55 02 82 16.00 20 07 Certificates Notifications 1.3.4

56 02 82 16.00 20 11 Closeout Submittals Notifications 1.3.4 G

57 02 82 16.00 20 11 Closeout Submittals Rental Equipment 1.6.1 G

58 02 82 16.00 20 11 Closeout Submittals Respirator Program Records 1.3.6.1 G

59 02 82 16.00 20 11 Closeout Submittals Permits and Licenses 1.3.4 G

60 03 20 00.00 10 02 Shop Drawings Reinforcement 3.1 G

61 03 20 00.00 10 07 Certificates Reinforcing Steel 2.2

62 03 30 53 02 Shop Drawings Installation Drawings 1.5 G

63 03 30 53 03 Product Data Air-Entraining Admixture 2.2.3.1

64 03 30 53 03 Product Data Water-Reducing or Retarding Admixture 2.2.3.2

65 03 30 53 03 Product Data Curing Materials 2.2.8

66 03 30 53 03 Product Data Expansion Joint Filler Strips, Premolded 2.2.6

67 03 30 53 03 Product Data Batching and Mixing Equipment 3.1.3.3

68 03 30 53 03 Product Data Conveying and Placing Concrete 3.2

69 03 30 53 03 Product Data Mix Design Data 2.3 G

70 03 30 53 03 Product Data Ready-Mix Concrete 2.3

SUBMITTAL REGISTER

JOB NAME:

LOCATION:

CONTRACT NO:

CONTRACTOR:

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

71 03 30 53 03 Product Data Curing Compound 2.4.2

72 03 30 53 03 Product Data Mechanical Reinforcing Bar Connectors 2.2.5

73 03 30 53 06 Test Reports Aggregates 2.2.2

74 03 30 53 06 Test Reports Concrete Mixture Proportions 2.1.3 G

75 03 30 53 06 Test Reports Compressive Strength Testing 3.9.3 G

76 03 30 53 06 Test Reports Slump 3.9.3 G

77 03 30 53 06 Test Reports Air Content 3.9.3

78 03 30 53 06 Test Reports Water 2.2.4

79 03 30 53 07 Certificates Cementitious Materials 2.2.1

80 03 30 53 07 Certificates Aggregates 2.2.2

81 03 30 53 07 Certificates Delivery Tickets 2.3

82 03 30 53 08 Manufacturer’s Instructions Chemical Floor Hardener 2.4.1

83 03 30 53 08 Manufacturer’s Instructions Curing Compound 2.4.2

84 04 20 00 02 Shop Drawings Cut CMU 3.3.2.1 G

85 04 20 00 02 Shop Drawings Detail Drawings 3.4.1.1 G

86 04 20 00 03 Product Data Cement 2.2.2.1.1

87 04 20 00 04 Samples Concrete Masonry Units (CMU) 2.2.2.1

88 04 20 00 04 Samples Anchors, Ties, and Bar Positioners 2.6.2

89 04 20 00 04 Samples Joint Reinforcement 2.6.3 G

90 04 20 00 05 Design Data Masonry Compressive Strength 2.1.2 G

91 04 20 00 05 Design Data Bracing Calculations 3.2.4

92 04 20 00 06 Test Reports Field Testing of Mortar 3.6.1.1

93 04 20 00 06 Test Reports Field Testing of Grout 3.6.1.2

94 04 20 00 06 Test Reports Cementitious Materials 2.4.1.1

95 04 20 00 06 Test Reports Admixtures for Masonry Mortar 2.4.1.3

96 04 20 00 06 Test Reports Admixtures for Grout 2.4.2.2

97 04 20 00 06 Test Reports Joint Reinforcement 2.6.3

98 05 50 13 02 Shop Drawings Angles and Plates 2.3 G

99 06 10 00 06 Test Reports Preservative-treated 1.4.3

100 06 10 00 06 Test Reports Preservative treatment 1.7

101 06 61 16 02 Shop Drawings Installation 3.1

102 06 61 16 03 Product Data Solid polymer material 2.1

103 06 61 16 03 Product Data Fabrications 2.3

104 06 61 16 04 Samples Material 2.1

105 06 61 16 04 Samples Counter Tops 2.3.4

106 06 61 16 07 Certificates Qualifications 1.4.1

107 06 61 16 10 Operation and Maintenance Data Clean-up 3.2

108 07 21 16 03 Product Data Blanket Insulation 2.1

SUBMITTAL REGISTER

JOB NAME:

LOCATION:

CONTRACT NO:

CONTRACTOR:

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

109 07 21 16 03 Product Data Accessories 2.3

110 07 21 16 08 Manufacturer’s Instructions Insulation 3.3.1

111 07 22 00 02 Shop Drawings Insulation Board Layout 1.3 G

112 07 22 00 03 Product Data Insulation 2.1 G

113 07 22 00 03 Product Data Protection Board 1.4 G

114 07 22 00 03 Product Data Fasteners 2.5 G

115 07 22 00 03 Product Data Sheathing Paper 2.4 G

116 07 22 00 06 Test Reports Flame Spread Rating 1.7.1 G

117 07 22 00 07 Certificates Installer Qualifications 1.6 G

118 07 22 00 08 Manufacturer’s Instructions Fasteners 2.5 G

119 07 22 00 08 Manufacturer’s Instructions Insulation 2.1 G

120 07 24 00 02 Shop Drawings Shop Drawings 3.3 G G

121 07 24 00 03 Product Data Sheathing Board 2.2

122 07 24 00 03 Product Data Thermal Insulation 2.6

123 07 24 00 03 Product Data Adhesive 2.3

124 07 24 00 03 Product Data Mechanical Fasteners 2.5

125 07 24 00 03 Product Data Accessories 2.12

126 07 24 00 03 Product Data Base Coat 2.7

127 07 24 00 03 Product Data Portland Cement 2.8

128 07 24 00 03 Product Data Reinforcing Fabric 2.9

129 07 24 00 03 Product Data Finish Coat 2.10

130 07 24 00 03 Product Data Joint Sealant 2.13

131 07 24 00 03 Product Data Sealant Primer 2.11

132 07 24 00 03 Product Data Bond Breaker 2.14

133 07 24 00 03 Product Data Backer Rod 2.15

134 07 24 00 03 Product Data Warranty 1.7

135 07 24 00 05 Design Data Wind Load 1.2.1.2

136 07 24 00 06 Test Reports Abrasion Resistance 1.2.3.1

137 07 24 00 06 Test Reports Accelerated Weathering 1.2.3.2

138 07 24 00 06 Test Reports Impact Resistance 1.2.2.3

139 07 24 00 06 Test Reports Mildew Resistance 1.2.3.3

140 07 24 00 06 Test Reports Salt Spray Resistance 1.2.3.4

141 07 24 00 06 Test Reports Absorption-Freeze-Thaw 1.2.3.6

142 07 24 00 06 Test Reports Wall Fire Test 1.2.1.3

143 07 24 00 06 Test Reports Water Penetration 1.2.1.1

144 07 24 00 06 Test Reports Water Resistance 1.2.3.5

145 07 24 00 06 Test Reports Full Scale or Intermediate Scale Fire Test 1.2.1.3

146 07 24 00 06 Test Reports Surface Burning Characteristics 1.2.2.1

147 07 24 00 06 Test Reports Radiant Heat 1.2.2.2

SUBMITTAL REGISTER

JOB NAME:

LOCATION:

CONTRACT NO:

CONTRACTOR:

APPROVING…