Questions_and_Answers_(2).docx

DOCX document 12 KB Posted

Attached to
Customized Christini Tactical Motorcycles Federal contract opportunity
Solicitation number
FA4417-16-T-0044
Issued by
Department of the Air Force Special Operations Command

About this file

See attached.

View the file

Other files for this federal contract opportunity

Other files attached to Customized Christini Tactical Motorcycles, newest first.
File Type Posted
Amendment_0001.pdf PDF
Questions_and_Answers_-_Round_1.docx DOCX document
Redacted_J A.pdf PDF
FA4417-16-T-0044.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1) For delivery, it specifies delivery by October 31st. Is this a requirement for all 54 bikes? Or can the first 8 bikes for training in NC be delivered by October 31st and the balance shipped over the next two months with them all delivered by December 31st. We are a very small company and these bikes literally have to be built from ground up. Engines assembled, Frames welded, and parts fabricated from billet. So please check on this for us.

Answer: We want at least 16 motorcycles to be ready at the training facility by 31 October.

2) For color, we are clear on the frames being powder coated Tan. Our stock plastic is Black. We have two options for the customer if they want a tan MOLLE cover or a Tan graphic on the plastic. I have attached photos showing a Tan graphics package (it would be without logos) or the Tan MOLLE cover with saddle bag (This is preferred and is made by HighGround gear). The MOLLE is an up charge item and is made by hand in Philadelphia. However, this is the highest quality special ops MOLLE on the market and will give another storage option to the end user.

Answer: We want the tan powder coat without the logo.

3) There was no rear rack specified which I believe they want. It is show in the pictures attached. It would be Black Anodized (not silver as shown in pictures).

Answer: We do not want the rear rack.

File details come from the government source that posted it. Updated .