B.15 Attach 3 - Wage Rates

29 KB Posted

Attached to
RECOVERY- FTEV051076 - Construct Warehouse, 1 Special Operations Combat Sqd Federal contract opportunity
Solicitation number
FA4417-09-R-0014
Issued by
Department of the Air Force Special Operations Command

About this file

Wage Rates

Text of this file

FA4417-09-R-0014

GENERAL DECISION: FL20080092 07/25/2008 FL92

Date: July 25, 2008

General Decision Number: FL20080092 07/25/2008

Superseded General Decision Number: FL20070095

State: Florida

Construction Type: Building

County: Okaloosa County in Florida.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories).

Modification Number Publication Date

0 02/08/2008

1 07/25/2008

* SUFL1996-007 06/28/1996

Rates Fringes

Bricklayer/Blocklayer............$ 13.11

CARPENTER (Including Drywall

Hanging, Batt Insulation, and

Acoustical Ceiling

Installation)....................$ 9.94

Cement Mason/Concrete Finisher...$ 10.19

ELECTRICIAN......................$ 9.97 .86

GLAZIER..........................$ 11.50

INSULATOR - HEAT & FROST.........$ 10.46

Laborers:

MASON TENDERS...............$ 7.00 .35

UNSKILLED...................$ 6.84

PAINTER (Brush) (Including

Drywall Finishing)...............$ 10.23

PLUMBER..........................$ 9.82

Power equipment operators:

BACKHOE.....................$ 7.88

GRADER......................$ 9.38

ROLLER......................$ 6.75

Sheet metal worker (Including

HVAC Duct Work)..................$ 8.70

TRUCK DRIVER.....................$ 6.55

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Other files for this federal contract opportunity

Other files attached to RECOVERY- FTEV051076 - Construct Warehouse, 1 Special Operations Combat Sqd, newest first.
File Type Posted
FA4417-09-R-0014 Submission of Proposal —
FA4417-09-R-0014 Amendment 3.PDF PDF
Attachment 6 FA4417-09-R-0014 ADDENDUM #1.pdf PDF
Attachment 7 FA4417-09-R-0014 16721 Fire Alarm MNS Alarm Spec 0509.pdf PDF
FA4417-09-R-0014 Amendment 2.PDF PDF
FA4417-09-R-0014 Attachment 6.PDF PDF
Responses to Warehouse questions 19 May 09.pdf PDF
080095C-C01-DEMO.PDF PDF
B.15 FA4417-09-R-0014 Amend #1.pdf PDF
080095C-C02-SITE.PDF PDF
E-2-Model.pdf PDF
E-1-Model.pdf PDF
E-4-Model.pdf PDF
080095C-C04-UTILITY.PDF PDF
ARCH-100.pdf PDF
080095C-C05-DTLS.PDF PDF
E-5-Model.pdf PDF
080095C-C03-GRADE.PDF PDF
E-3-Model.pdf PDF
8214-S3.pdf PDF
T1-WAREHOUSE.pdf PDF
8214-S2.pdf PDF
08157FP01.pdf PDF
8214-S1.pdf PDF
8214-S4.pdf PDF
08157M01.pdf PDF
08157P01.pdf PDF
B.15 Attach 1 - Specifications —
B.15 Attach 4 - PAST PERFORMANCE SURVEY —
B.15 FA4417-09-R-0014.doc DOC document
B.15 Attach 5 - Financial Reference Sheet —
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .