Questions_and_Responses.pdf

PDF 41 KB Posted

Attached to
Dorm Washer and Dryers Federal contract opportunity
Solicitation number
FA4407-19-Q-3002
Issued by
Department of the Air Force Air Mobility Command

About this file

Questions with responses.

View the file

Other files for this federal contract opportunity

Other files attached to Dorm Washer and Dryers, newest first.
File Type Posted
Amend_04_Ques_and_Resp.pdf PDF
Combo_Sol.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Number of buildings? 3 Facilities

2. Number of Floors? Bldg. 1830 and 1820 are both 3 stories, but have community laundry rooms on 1st floor. Bldg 1950 has 3 stories. Each floor has 10 rooms, each rooms has its own stackable washer/dryer.

3. Elevators available to contractor use for installation? No elevators available. Large exterior stairwells available.

4. Interior exterior entry to actual rooms? 1 facility that has stackable washer/dryer combo in each rooms has exterior entry to rooms.

5. Outside or inside stairwells? Outside, but covered.

6. Are permanent handrails in place & approved? Permanent handrails on stairwells.

7. Access to rooms: require key or supervised entry? Escorts to rooms will be available.

8. Are units occupied? Yes

9. How many units to be installed on each floor? Bldg 1830: 16 washer and 16 dryers on the first floor. Bldg 1920: 16 washer and 16 dryers on the first floor. Bldg 1850: 10 Stackable washer/dryer combo on each floor.

10. Is this a new construction or a remodel? Replace older units.

11. Existing appliances to remove? Yes

12. If existing, is DRMO disposal area available on base? Yes, pre-coordination completed by gov. DD form 1348 completed by gov. Delivery of units required.

13. Are units to be palletized for the DRMO? Yes

14. Does the DRMO provide pallets or contractor? Contractor

15. How far away is the DRMO located? 2 miles from location

16. Is there parking lot access close to the building for unloading? Yes

17. Trash disposal available on base? No

18. If recyclable material only, what type is accepted? (Styrofoam, Corrugated, etc…) Negative

19. Is warehouse space available for staging of product during the installation process? Limited staging space available in warehouse

20. Will other contractors be on site? No

21. Base Access: Is prior approval required? Gov will coordinated base access prior to delivery.

22. Allowed time frame for the install project? Daily hours of operation: 0730-1600.

23. Is there a dock for delivery? No

24. Will there be help available to unload units from the truck? No

25. Are the Stack washer and dryer units using electric dryer or gas dryer hook up? Electric