Questions_and_Responses.pdf
PDF 41 KB Posted
- Attached to
- Dorm Washer and Dryers Federal contract opportunity
- Solicitation number
- FA4407-19-Q-3002
About this file
Questions with responses.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend_04_Ques_and_Resp.pdf | ||
| Combo_Sol.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Number of buildings? 3 Facilities
2. Number of Floors? Bldg. 1830 and 1820 are both 3 stories, but have community laundry rooms on 1st floor. Bldg 1950 has 3 stories. Each floor has 10 rooms, each rooms has its own stackable washer/dryer.
3. Elevators available to contractor use for installation? No elevators available. Large exterior stairwells available.
4. Interior exterior entry to actual rooms? 1 facility that has stackable washer/dryer combo in each rooms has exterior entry to rooms.
5. Outside or inside stairwells? Outside, but covered.
6. Are permanent handrails in place & approved? Permanent handrails on stairwells.
7. Access to rooms: require key or supervised entry? Escorts to rooms will be available.
8. Are units occupied? Yes
9. How many units to be installed on each floor? Bldg 1830: 16 washer and 16 dryers on the first floor. Bldg 1920: 16 washer and 16 dryers on the first floor. Bldg 1850: 10 Stackable washer/dryer combo on each floor.
10. Is this a new construction or a remodel? Replace older units.
11. Existing appliances to remove? Yes
12. If existing, is DRMO disposal area available on base? Yes, pre-coordination completed by gov. DD form 1348 completed by gov. Delivery of units required.
13. Are units to be palletized for the DRMO? Yes
14. Does the DRMO provide pallets or contractor? Contractor
15. How far away is the DRMO located? 2 miles from location
16. Is there parking lot access close to the building for unloading? Yes
17. Trash disposal available on base? No
18. If recyclable material only, what type is accepted? (Styrofoam, Corrugated, etc…) Negative
19. Is warehouse space available for staging of product during the installation process? Limited staging space available in warehouse
20. Will other contractors be on site? No
21. Base Access: Is prior approval required? Gov will coordinated base access prior to delivery.
22. Allowed time frame for the install project? Daily hours of operation: 0730-1600.
23. Is there a dock for delivery? No
24. Will there be help available to unload units from the truck? No
25. Are the Stack washer and dryer units using electric dryer or gas dryer hook up? Electric