Atch_16_HVAC_ON_EQUIP_INVENTORY.pdf

PDF 42 KB Posted

Attached to
Repair (SUS) Various Building Systems; B861
Solicitation number
FA440718R0004
Issued by

About this file

Section J, Atch 16 HVAC Equipment Ivnetory

View the file

Other files

File Type Posted
Amendment_10.pdf PDF
Atch_29_-_B861_Abatement_Reports.pdf PDF
Atch_21_-_RFI_Log_B861_8_Aug_2018.pdf PDF
Atch_1_-_SOW_8_Aug__2018.pdf PDF
Atch_2_-__B861_Phasing_Plan.pdf PDF
Amendment_7.pdf PDF
M9-M10M13.zip ZIP file
FP1.zip ZIP file
P1.zip ZIP file
E5-E6.zip ZIP file
E7.zip ZIP file
M7-M8.zip ZIP file
E3-E4.zip ZIP file
Atch_21_-_RFI_Log_B861_-_27_July_18.pdf PDF
M4.zip ZIP file
M14-M18.zip ZIP file
16967E01.txt TXT text file
E7.zip ZIP file
X1.zip ZIP file
M1.zip ZIP file
M11-M12.zip ZIP file
Amendment_5.pdf PDF
Atch_26_B861_-_S-File_Room_Designation.pdf PDF
Atch_21_RFI_Log_B861_-_26_July_18.pdf PDF
Atch_24_Post_Investigation_Report.pdf PDF
Atch_1_B861_SOW_7.18.18.pdf PDF
Atch_25_Additional_Site_Visit_Sign_in_Sheet.pdf PDF
Atch_21_RFI_Log_B861_July_11.pdf PDF
FA440718R00040003.pdf PDF
Atch_1_Bldg_861_SOW_7.10.18.pdf PDF
Amendment_2.pdf PDF
Atch_19_Past_Performance_Questionnaire.pdf PDF
Atch_5_B861-100__Design_Analysis.pdf PDF
Atch_15_ELEC_ON_EQUIP_INVENTORY.pdf PDF
Atch_3_B861_-_100__Specification.pdf PDF
Atch_13_AFAA_Furniture.pdf PDF
Atch_11_TEKLAB_Sample_Results-B861.pdf PDF
Atch_8_Termite_Treatment_Report.pdf PDF
RFP_FA440718R0004.pdf PDF
Atch_2_Phasing_Plan_062118.pdf PDF
Atch_18_Past_Performance_Information.pdf PDF
Atch_7_Site_Utility_Plan.pdf PDF
Atch_12_AFCEC_D_Wing_Renovation.pdf PDF
Atch_1_B861_-_100__Specification.pdf PDF
Atch_3_B861-100__Design_Analysis.pdf PDF
Atch_6_Termite_Treatment_Report.pdf PDF
Atch_8_Schedule_of_Materials_Submittals.pdf PDF
Atch_7_B861_SOW.pdf PDF
Atch_2_B861_100__Drawings.pdf PDF
Atch_5_Site_Utility_Plan.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUIRED HVAC ON EQUIPMENT INVENTORY SHEET

Air Handlers = AHU-1 (2nd fl SE)

• Outside Air Units = OAU-1 (Mech Rm S)

• Chillers (air/watercooled) = ACC-1 or WCC-1 (E)

• Boiler= BLR-1 (Mech Rm)

• Split DX = (with/interior AHU) DX-1 (S)

• Heat Pump (water/airsource) = HP-AS-1 or HP-WS-1

• Mini Split = DX MAC-1

• Fan Coil Units = FCU-1

• Cooling Tower= CT-1

• Roof Top Unit = RTU-1

• Package Unit = PKG-AC-1

• Computer Room AC = CRAC-1

• Unit Heaters = UH-E-1 or UH-W-1 or UH-S-1

• Infrared Heaters = IR-1

• Heating and Ventilating Units = HV-1

• Pumps = CHWP-1 or HWP-1 or CWP-1

• Evaporative Cooler= ECU-1

• Large industrial ceiling fans

File details come from the government source that posted it.