Atch_21_RFI_Log_B861_July_11.pdf
PDF 70 KB Posted
- Attached to
- Repair (SUS) Various Building Systems; B861
- Solicitation number
- FA440718R0004
About this file
Attachment 21 RFI Log B861 - 11 July 2018
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI No. Date Received Question / Comment SME Response Publish
Action
R0001 26‐Jun‐18
The SF1442 & Proposal Checklist has conflicting due dates and RFI submission dates.
Revised Propsal checklist to match the dates of the
SF1442
13‐Jul‐18
R0002 27‐Jun‐18
There are several references to SBA 8(a) certification in the documents, though
FBO lists the project as a Total Small
Business Set‐Aside. Can you please clarify if this solicitation is intended to be an 8(a) Set‐Aside, or if it is Total Small
Business?
This is a Total Small Business
Set‐Aside 13‐Jul‐18
R0003 5‐Jul‐18
SF 1442 Section 13.A states the proposal is due at 1:00 PM July 25, 2018.
Attachment 20‐Proposal Checklist originally stated the proposal is due at
1:00 PM July 29, 2018 (this is a Sunday).
Amendment 2 revised the proposal checklist and omitted the proposal due information. Please clarify what the proposal due date is.
The proposals are due at
1:00 PM July 25, 2018.
13‐Jul‐18
R0004 9‐Jul‐18
Are CAD files available for the building? If so, could you please provide so that they can be utilized for our technical proposal?
Yes, CAD files are available 13‐Jul‐18
R0005 9‐Jul‐18
Please clarify as to whether the
Superintendent can also perform the duties of the SSHO.
Please refer to FAR 52.236‐
6 ‐‐ Superintendence by the
Contractor
13‐Jul‐18
R0006 9‐Jul‐18
Please clarify as to whether the
Superintendent can also perform the duties of the Quality Control Manager or if a QC Manager is required with no other duties.
Please refer to FAR 52.246‐
12‐‐ Inspection of
Contarction
13‐Jul‐18
R0007 9‐Jul‐18 Please clarify as to whether this project sales tax exempt?
Yes, this is sales tax exempt 13‐Jul‐18
R0008 9‐Jul‐18
Attachment 20 – Proposal Checklist states that Blocks 30A, 30B and 30C should be filled out for the proposal. Should these blocks be filled out for the proposal or by the successful offeror at award, please clarify.
These are to be filled in, signed and dated when submitting your proposal.
Also, must check block 28.
13‐Jul‐18
R0009 9‐Jul‐18 Will the past performance questionnaires be due at the site meeting or with the bid
Past Performance
Questionnaires will be due with the proposal
13‐Jul‐18
Request for Information (RFI) Subject Matter Expert
R0010 10‐Jul‐18
Paragraph 2 for the Pre‐Phase Section in the Scope of Work states the contractor needs to perform an analysis of the exterior walls to determine the extent of termite damage. There is already such a report in the bid package complied by
KDG. Is the contractor expected to do a second analysis as a part of their scope?
The report provided identifies the areas that have termite damage and an idea of the severity but the overall scope of the damage is somewhat unknown. Per the
“Proposed Solution Report” section, page 2 “Exterior
Façade Repairs” – “Remove the existing faux brick, sheathing, batt insulation, all damaged sill plates and wood stud wall framing on framing on all exterior walls.” The contractor does
NOT need to do a second analysis but should bid according to the information provided in the report.
13‐Jul‐18
R0011 10‐Jul‐18
Section Detail 4, Sheet A4‐1 calls for the contractor to assume that 25% of the exterior wall studs will be replaced due to termite damage. However the individual removal sheets designated certain areas where this applies (Keyed Note 9.2).
Which applies, the entire perimeter or just the designated sections?
Assume 25% replacement of the entire perimeter wall studs.
13‐Jul‐18
R0012 10‐Jul‐18 What code is to be used on the project
2015 or 2018 IBC?
2015 13‐Jul‐18
R0013 10‐Jul‐18
On page A3‐1 of the solicitation key note states “For bidding purposes contractor shall assume in base bid replacement of approximately 25% of all exterior 2X6 wall studs due to existing damage as required”. Shall the design and construction assume all interior finishes in affected rooms be replaced with like kind finishes?
yes 13‐Jul‐18
R0014 10‐Jul‐18
How is the contractor to address the code required threshold for full building refit for seismic if reached?
R0015 10‐Jul‐18
Per the termite damage/ structural integrity assessment it appears that windows and door openings are compromised. If an exterior window or door must be fully removed this would trigger under UFC 4‐010‐01, AT/FP compliant windows and doors with supporting structural frame work to meet the criteria. Confirm how may openings of each window and door conditions are to be anticipated in the base bid.
Per the “Proposed Solution
Report” section, page 2
“Exterior Façade Repairs” –
“Removal of the existing windows or doors will be determined by the extent of damage to the window or door opening framing.”
Without extensive demolition the exact number of windows and doors to be replaced in unknown. For bidding purposes assume 3 single doors, 5 double doors and
20 windows.
13‐Jul‐18
R0016 10‐Jul‐18 What is the Seismic Site Class for this building location?
R0017 10‐Jul‐18 What is the Seismic Risk Category for the building?
Comment: Seismic Site
Class and Seismic Risk
Category, along with location, will dictate Seismic
Design Category. This in turn will dictate per IEBC whether the project is excepted from seismic evaluation and repair.
Reference IEBC 606.2.2, exception 1.
13‐Jul‐18
File details come from the government source that posted it.