This document is a Construction Cost Estimate Breakdown for a traffic signal repair project at Maxwell Air Force Base in Alabama. The project, identified by purchase request JUBJ 25-1847, involves work in three primary divisions: General Requirements, Site Work, and Electrical/Fire System/communications. Specific tasks include administrative work, obtaining permits, removing existing signals, and installing various traffic signal components such as LED traffic lights, pedestrian signals, push buttons, luminaires, controllers, and intersection detectives. The estimate includes standard cost calculation categories like material costs, labor costs, taxes, insurance, overhead, profit, and bonding at predetermined percentage rates (10% for overhead and profit, 2.5% for bonds). The contractor's address is listed as 400 Cannon Street, with a contract date of 28-May-25, and the work location is Building 2036 at Maxwell Air Force Base.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNIT MATERIAL/EQUIP. COSTS LABOR RATES OTHER
LINE ITEM OF QUANTITY d Manhours AVERAGE DIRECT LINE
NO. MEASURE UNIT TOTAL RATE TOTAL COSTS TOTAL
Division 1 (General Requirements) 1 Administrative EA 2 Outages and Permits EA
Division 2 (Site Work) 3 Removal Of Exisiting Signals EA
Division 16 (ELECTRICAL/FIRE SYSTEM/COMMUNICATIONS) 4 Traffic Controller Unit Installation EA 5 3-Section Yellow LED Traffic Signal Light EA 6 5-Section Yellow LED Traffic Signal Light EA 7 Pedestrian LED Traffic Light Signal EA 8 Pedestrian Push Buttons EA 9 LED Luminares Traffic Light Signal EA 10 8-Phase Controller EA 11 Install Inersection Detectors EA
12 TOTAL
13 Material Costs 14 Tax on Materials 10%
15 TOTAL MATERIAL COST
16 Labor Cost 17 Insurance & Tax on Labor 10%
18 TOTAL LABOR COST
19 Total Other Direct Costs 20 Total Material, Labor, Tax & Insurance
21 TOTAL DIRECT COSTS
22 Overhead 10% 23 Subtotal 24 Profit 10% 25 Bonds 2.5%
26 TOTAL
Signature: ______________________________________
JUBJ 25-1847 BLDG 2036 MAXWELL AFB
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
REPAIR TRAFFIC SIGNALS, GUNTER
PURCHASE REQUEST NUMBER PROJECT NUMBER/WORK ORDER WORK LOCATION
CONSTRUCTION COST ESTIMATE BREAKDOWN
OMB No. 0704-0193
CONTRACTOR DATE
ADDRESS
400 Cannon Street 28-May-25 Maxwell Air Force Base Alabama