BLANK_3052_JUBJ 25-1847 Repair Gunter-Annex Traffic Lights.pdf

PDF 105 KB Posted

Attached to
JUBJ 25-1847 Repair Gunter-Annex Traffic Lights Solicitation (Amendment 0001)
Solicitation number
FA330025R0036
Issued by

About this file

This document is a Construction Cost Estimate Breakdown for a traffic signal repair project at Maxwell Air Force Base in Alabama. The project, identified by purchase request JUBJ 25-1847, involves work in three primary divisions: General Requirements, Site Work, and Electrical/Fire System/communications. Specific tasks include administrative work, obtaining permits, removing existing signals, and installing various traffic signal components such as LED traffic lights, pedestrian signals, push buttons, luminaires, controllers, and intersection detectives. The estimate includes standard cost calculation categories like material costs, labor costs, taxes, insurance, overhead, profit, and bonding at predetermined percentage rates (10% for overhead and profit, 2.5% for bonds). The contractor's address is listed as 400 Cannon Street, with a contract date of 28-May-25, and the work location is Building 2036 at Maxwell Air Force Base.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNIT MATERIAL/EQUIP. COSTS LABOR RATES OTHER

LINE ITEM OF QUANTITY d Manhours AVERAGE DIRECT LINE

NO. MEASURE UNIT TOTAL RATE TOTAL COSTS TOTAL

Division 1 (General Requirements) 1 Administrative EA 2 Outages and Permits EA

Division 2 (Site Work) 3 Removal Of Exisiting Signals EA

Division 16 (ELECTRICAL/FIRE SYSTEM/COMMUNICATIONS) 4 Traffic Controller Unit Installation EA 5 3-Section Yellow LED Traffic Signal Light EA 6 5-Section Yellow LED Traffic Signal Light EA 7 Pedestrian LED Traffic Light Signal EA 8 Pedestrian Push Buttons EA 9 LED Luminares Traffic Light Signal EA 10 8-Phase Controller EA 11 Install Inersection Detectors EA

12 TOTAL

13 Material Costs 14 Tax on Materials 10%

15 TOTAL MATERIAL COST

16 Labor Cost 17 Insurance & Tax on Labor 10%

18 TOTAL LABOR COST

19 Total Other Direct Costs 20 Total Material, Labor, Tax & Insurance

21 TOTAL DIRECT COSTS

22 Overhead 10% 23 Subtotal 24 Profit 10% 25 Bonds 2.5%

26 TOTAL

Signature: ______________________________________

JUBJ 25-1847 BLDG 2036 MAXWELL AFB

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

REPAIR TRAFFIC SIGNALS, GUNTER

PURCHASE REQUEST NUMBER PROJECT NUMBER/WORK ORDER WORK LOCATION

CONSTRUCTION COST ESTIMATE BREAKDOWN

OMB No. 0704-0193

CONTRACTOR DATE

ADDRESS

400 Cannon Street 28-May-25 Maxwell Air Force Base Alabama