Attachment 4 - JUBJ 25-1847 Repair Gunter-Annex Traffic Lights - 3052.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
JUBJ 25-1847 Repair Gunter-Annex Traffic Lights Solicitation (Amendment 0001)
Solicitation number
FA330025R0036
Issued by

About this file

This is a construction cost estimate breakdown template for traffic light repair work at Maxwell Air Force Base. The document serves as a blank pricing template for contractors to complete their cost estimates for solicitation FA330025R0036, specifically for project JUBJ 25-1847 to repair traffic signals at Gunter Annex, Building 2036.

The template contains zero-dollar placeholders across 27 line items organized into construction divisions including general requirements, site work, concrete, and electrical systems. Specific work items include removal of existing signals and detection loops, installation of traffic controller units, 3-section and 5-section yellow LED traffic signal lights, pedestrian LED signals and push buttons, LED luminaires, 8-phase controllers, and intersection detectors. The cost structure includes material costs with 10% tax, labor costs with 10% insurance and tax, overhead at 10%, profit at 10%, and bonds at 2.5%. The federal contract opportunity indicates this construction project has an estimated value between $25,000 and $100,000 and is being managed by the Department of the Air Force Air Education and Training Command.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Gunter CONSTRUCTION COST ESTIMATE BREAKDOWN OMB No. 0704-0193

CONTRACTORDATEADDRESS400 Cannon Street
28-May-25Maxwell Air Force Base Alabama
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
REPAIR TRAFFIC SIGNALS, GUNTER$0.00
PURCHASE REQUEST NUMBERPROJECT NUMBER/WORK ORDERWORK LOCATION
JUBJ 25-1847BLDG 2036 MAXWELL AFB
UNITMATERIAL/EQUIP. COSTSLABOR RATESOTHER
LINEITEMOFQUANTITYdManhoursAVERAGEDIRECTLINE
NO.MEASUREUNITTOTALRATETOTALCOSTSTOTAL
Division 1 (General Requirements)$0.00$0.00$0.00
1.0AdministrativeUnit$0.00$0.00$0.00
2.0Outages and PermitsUnit$0.00$0.00$0.00
Division 2 (Site Work)$0.00$0.00$0.00
3.0Removal Of Exisiting SignalsUnit$0.00$0.00$0.00
Division 3 (Concrete)$0.00$0.00$0.00
4.0Removal Of Detection Loops and RepairUnit$0.00$0.00$0.00
Division 16 (ELECTRICAL/FIRE SYSTEM/COMMUNICATIONS)$0.00$0.00$0.00
5.0Traffic Controller Unit InstallationUnit$0.00$0.00$0.00
6.03-Section Yellow LED Traffic Signal LightUnit$0.00$0.00$0.00
7.05-Section Yellow LED Traffic Signal LightUnit$0.00$0.00$0.00
8.0Pedestrian LED Traffic Light SignalUnit$0.00$0.00$0.00
9.0Pedestrian Push ButtonsUnit$0.00$0.00$0.00
10.0LED Luminares Traffic Light SignalUnit$0.00$0.00$0.00
11.08-Phase ControllerUnit$0.00$0.00$0.00
12.0Install Inersection DetectorsUnit$0.00$0.00$0.00
13.0TOTAL$0.00$0.00$0.00$0.00
$0.00$0.00$0.00
14.0Material Costs$0.00$0.00
15.0Tax on Materials10%$0.00$0.00
16.0TOTAL MATERIAL COST$0.00$0.00
$0.00$0.00$0.00
17.0Labor Cost$0.00$0.00
18.0Insurance & Tax on Labor10%$0.00$0.00
19.0TOTAL LABOR COST$0.00$0.00
$0.00$0.00$0.00
20.0Total Other Direct Costs$0.00$0.00$0.00
21.0Total Material, Labor, Tax & Insurance$0.00$0.00
22.0TOTAL DIRECT COSTS$0.00$0.00$0.00
$0.00$0.00$0.00
23.0Overhead10%$0.00$0.00$0.00
24.0Subtotal$0.00$0.00$0.00$0.00
25.0Profit10%$0.00$0.00$0.00
26.0Bonds2.5%$0.00$0.00$0.00
27.0TOTAL$0.00$0.00$0.00

Signature: ______________________________________