Atch 1 - FY 24 Air Show Metal Fence PWS.pdf

PDF 1 MB Posted

Attached to
FY24 Air Show Metal Fence
Solicitation number
FA309924Q0009
Issued by

About this file

This performance work statement outlines requirements for a federal contract to provide fencing services for an air show. The contractor will be required to deliver, set up, and take down 2,205 linear feet of four foot barricade fencing and 300 linear feet of six foot panel fencing at Laughlin Air Force Base from March 7-10, 2024. Setup will begin at 1:00 PM on March 7th, with teardown on March 10th. Work may need to be performed at night on March 8th-9th due to aircraft operations. The location and amount of fencing is subject to change up to 200 additional feet until March 10th. Temporary markings only will be used without permanent markings on airfield surfaces.

View the file

Other files

File Type Posted
Questions and Answers.pdf PDF
Atch 2 - Metal Crowd Control Fencing Map.pdf PDF
Solicitation - FA309924Q0009.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e

PERFORMANCE WORK STATEMENT

FOR

FENCING FOR FIESTA OF FLIGHT 2024

Provide 2,205 linear feet of four foot high metal crowd control (barricade) fencing and 300 linear feet of 6 foot high temporary panel fencing. Supply Laughlin Air Force Base Air Show with crowd control fencing to keep people out of controlled areas. Contractor is to deliver and set up fence on 07 March 2024 starting at 1300. Tear down of fence shall occur on 10 March 2024. During daylight hours on 08 and 09 March 2024, there will be active aircraft operations, which will limit the different locations where the contractor can set up the fence. The order of setting up will be provided. Contractor shall work during night hours if work will not be completed during the daylight hours. Location and linear footage of fence is subject to change up to but no more than an additional 200 feet until 10 March 2024. Contractor will not make any permanent markings on the airfield/apron to mark off locations.

Temporary markings such as tape and chalk will be allowed.

FA3099-24-Q-0009