Amendment 0002 21 Mar 09.doc

DOC document 45 KB Posted

Attached to
Paving IDIQ to Repair Base and Airfield Pavements
Solicitation number
FA3099-09-R-0002
Issued by

About this file

Amendment is being issued to extend proposal due date to 27 Mar 09 and incorporate solicitation revisions.

View the file

Other files

File Type Posted
JA_Paving_Mod_Revised11May15.pdf PDF
J_n_A_Signature_Page_(approved).pdf PDF
FA3099-09-R-0002 Pavements IDIQ 20 Mar.doc DOC document
Amend 0001.pdf PDF
Atch 4 Performance QUESTIONNAIRE 7 Feb 09.doc DOC document
Atch 3 - NAF Gen Provisions.pdf PDF
RFP.doc DOC document
Atch 1 - General Requirements Revised 10 Feb 09.doc DOC document
Atch 2 - Wage Determination.pdf PDF
Atch 1 - General Requirements Revised 10 Feb 09.doc DOC document
Atch 2 - Wage Determination.pdf PDF
Atch 4 Performance QUESTIONNAIRE 7 Feb 09.doc DOC document
Solicitation Pavements IDIQ.doc DOC document
Atch 3 - NAF Gen Provisions.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The purpose of this amendment is to incorporate the following solicitation revisions:

1. SF1442, Solicitation, Offer, and Award, Block 13A, revise proposal response date from 25 Mar 2009 to 27 Mar 2009.

2. Incorporate the following revisions to Amendment 0001, dated 16 Mar 2009:

a. Pre-Proposal Conference Minutes, page 3 of 8, Para 2a, revise the period of performance, as follows: base year plus 4 option periods of 12 months each.

b. Pre-Proposal Conference Questions and Responses, Page 5 of 8, Para 1, response to paragraph b (reference RFP, Pg 7 of 71, Offers). “The offeror’s price percentage factor (coefficient) must be sufficient to cover all costs as well as profit, including but not limited to overhead, profit, minimum design costs (typically 35%), G&A expenses, bond premiums, computer expense, and gross receipt taxes.” Add the following language, same paragraph: Minimal design requires documentation that substantiates the proposed approach. Documents may include a Statement of Work (SOW), cost estimates, justification for non-pre-priced items (NPI), verified as-built drawings, manufacturer’s or technical drawings/schematics for fabrication and assembly of structural elements, form, fit and attachment details for installation of materials/equipment, and design calculations to substantiate proposed layout and sizing of utilities and structural elements (i.e. HVAC loads, lighting, platform supports, etc).

c. Para e of Amendment 0001. Replace Bid Schedule, Solicitation, Page 3 of 71, with the following:

Section B - Supplies or Services and Prices, REVISION

ITEM NO
SUPPLIES/SERVICES

Services, Non-Personal, Construction, Paving Indefinite Delivery Indefinite Quantity (IDIQ).

Firm Fixed Price - Provide all labor, material, equipment, tools, transportation, and supervision necessary for base and airfield pavements on Laughlin AFB, Spofford Auxiliary Airfield, and the South Winds Marina at Lake Amistad, and perform all work in strict accordance with the terms and conditions set forth in the contract, specifications, and drawings. The performance period for the base year is 12 months from date of award. The period of performance for each project will be stated in respective delivery order. The negotiated base year coefficients will be used for the life of the contract. Labor and material cost adjustments will be reflected in the latest edition of the RS Means. The new edition to the RS Means will be effective upon publication. The contractor shall provide the Government with the RS Means Book immediately upon publication.

NSN Z222-PA-VNG-IDIQ

SIGNAL CODE A

COEFFICIENT WITH OR WITHOUT BONDS UP TO AN AGGREGATE AWARD AMOUNT OF:

Up to 1.5M ___________

$1.5M – $2M __________

$2M – $4M __________

$4M - $6M __________

$6M - $8M __________

$8M - $10M ___________

LABOR BURDEN RATE (applicable only to direct labor) : _____________

FOB: Destination

3. All other terms and conditions remain unchanged.

(End of Summary of Changes)