Amendment0002.doc
DOC document 38 KB Posted
- Solicitation number
- FA3099-07-R-0007
About this file
Amendment 0002 19 Oct 07
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment2 Pre-ProposalConferenceMinutes.pdf | ||
| Attachment1 GeneralRequirements Revised19Oct07.doc | DOC document | |
| Amendment0001 Attachment1 3Oct07.docx | DOCX document | |
| Amendment0001 3Oct07.doc | DOC document | |
| Solicitation.doc | DOC document | |
| Attachment1GeneralRequirements.docx | DOCX document | |
| Attachment2PastPerformanceQuestionnaire.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
1. The purpose of this amendment is to incorporate the following solicitation changes:
a. Section I – Contract Clauses, Clause 52.236-4, Physical Data, para (b) Weather Conditions, replace the Laughlin AFB Climatological Summary data with the following:
LAUGHIN WEATHER HISTORY
10-year average (Oct 1997- Oct 2007)
Month
Days w/precip > .1 inches
Jan
Feb
1.5
Mar
Apr
May
2.5
Jun
Jul
Aug
Sep
Oct
Nov
Dec
b. Standard Form 1442, Block 13, para A, revise receipt of offers due date from 22 Oct 2007 to read 29 Oct 2007, 4:30 PM.
c. Section L – Instructions, Conditions and Notices to Bidders, revise Instructions for Preparation of Proposals, Para L. 1(b), Specific Proposal Preparation Instructions, as follows:
The current RS Means Del Rio area cost factor based on the most recent quarterly update weighted averages for material, labor, and equipment (separately applied) for Del Rio, Texas will apply.
To read, as follows:
The current RS Means Del Rio area cost factor based on the most recent quarterly update division CCI factor for material, labor, and equipment (separately applied) for Del Rio, Texas will apply.
d. Attachment 1, General Requirements, Section 01010, Summary of Work, paragraph 1.04 Principal Features, revise the paragraph as follows:
Principal features of the work consist of but are not limited to tasks performed in accordance with (IAW) all Federal, State and Local codes and regulations, Federal Aviation Administration (FAA), and/or TX DOT Standard Specifications for Construction of Highways, Streets, and Bridges, whichever applies and as identified in respective delivery order. The most current regulation versions at time of the delivery order award will apply.
2. Incorporate Attachment 2, Pre-proposal Conference Minutes, dated 11 Oct 07.
3. All other terms and conditions remain unchanged.
Attachments:
1. General Requirements (revised)
2. Pre-Proposal Conference Minutes, 11 Oct 07
CONTRACTING OFFICER INFORMATION:
Contracting Officer: Juanita Vasquez Telephone: (830) 298-5115 Email: juanita.vasquez@laughlin.af.mil (End of Summary of Changes)
File details come from the government source that posted it. Updated .