About this file
The document is an Air Force Form 66 Schedule of Material Submittals for a water infrastructure project at Goodfellow Air Force Base. The project involves replacing water mains, hydrants, and valves on Fort Griffin Avenue, with project number JCGU 25-7004. The schedule details 25 specific material and documentation submittals required from the contractor, including management plans, traffic plans, safety plans, equipment lists, warranties, and technical material specifications for items such as earthwork materials, fire hydrants, valves, PVC piping, and construction reports.
The submittal requirements are categorized with specific submission types (e.g., certification of compliance, shop drawings, manufacturer's warranties) and have varied submission timelines. Most submittals are marked for "GA" (General Approval), with some marked "FIO" (For Information Only). Submission timing ranges from "as soon as possible" to "14 days prior" to specific project milestones, with most requiring submission before construction start, installation, or final inspection. The document includes detailed instructions for when and how each submittal should be processed by the project engineer and contract administrator.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 6) Communications Lines Drawings.pdf | ||
| Solicitation Amendment FA303025R00080001 SF 30 .pdf | ||
| FA303025R0008 - Questions and Answers.pdf | ||
| Base Access Letter (BAL).docx | DOCX document | |
| 2) Attachment 1- General Requirements.pdf | ||
| Solicitation - FA303025R0008.pdf | ||
| 1) Replace Water Mains Hydrants and Valves- SOW.pdf | ||
| 4) Wage Determination.pdf | ||
| 3) Attachment 2 - Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF MATERIAL SUBMITTALS
SOLICITATION/CONTRAC
T NO.:
TO BE COMPLETED BY THE PROJECT ENGINEER
NO. OF COPIES REQUIRED
DATE CONTRACTOR NOTIFIED
APPROVED DISAPPROVED
Part 1, 1.6, Management Plan 1 b GA
Part 1, 1.6.1, Traffic Plan 1 b GA
Part 1, 1.7.2 Storage Area 1 b GA
Part 1, 1.10 Submittals / 1.10.4
13 4
1 e GA
Part 1, 1.10.1.a Manufacturers Catalog Data
1 e GA
Part 1, 1.10.1.b Manufacturers Warranty
1 f FIO
Part 1, 1.10.1.c Contractors Warranty 1 f FIO
Part 1, 1.10.2 Equipment List - AF Form 3136
1 f FIO
Part 1, 1.10.3 As Builts 1 a GA
Part 1, 1.12 Safety Plan 1 a FIO
11 Part 1, 1.20 BALs 1 a GA
PROJECT NUMBER: JCGU 25-7004
REMARKS
Replace Water Mains, Hydrants, & Valves on Ft.
Griffin Ave
FINAL
APPROVAL
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SE
E
P
AR
A
ON
C
OP
IE
S
OT
HE
RS
A
S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION DATE
DATE
RECEIVED IN
CON-
TRACTING
DATE TO CIVIL
ENGINEER-ING
RETURN
SUSPENSE
DATE
FOLLOW UP CONTRACT-TOR
RE-SUBMITTAL
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SH
OP
D
RA
W
IN
GS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
SA
MP
LE
S
MA
NU
FA
CT
UR
ER
'S
RE
CO
MM
EN
DA
TI
ON
S
CO
LO
R
SE
LE
CT
IO
N
FORM66.xls
SOLICITATION/CONTRAC
T NO.:
TO BE COMPLETED BY THE PROJECT ENGINEER
NO. OF COPIES REQUIRED
DATE CONTRACTOR NOTIFIED
APPROVED DISAPPROVED
PROJECT NUMBER: JCGU 25-7004
REMARKS
Replace Water Mains, Hydrants, & Valves on Ft.
Griffin Ave
FINAL
APPROVAL
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SE
E
P
AR
A
ON
C
OP
IE
S
OT
HE
RS
A
S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION DATE
DATE
RECEIVED IN
CON-
TRACTING
DATE TO CIVIL
ENGINEER-ING
RETURN
SUSPENSE
DATE
FOLLOW UP CONTRACT-TOR
RE-SUBMITTAL
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SH
OP
D
RA
W
IN
GS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
SA
MP
LE
S
MA
NU
FA
CT
UR
MM
EN
DA
TI
ON
S
CO
LO
R
SE
LE
CT
IO
N
Part 2, 2.3 Earthwork Materials 1 1 c/d GA
Part 2, 2.4 Flexible Base Material 1 1 1 c/d GA
Part 2, 2.5, Bedding Material 1 1 c/d GA
Part 2, 2.6 Fire Hydrants 1 1 1 1 1 1 c/d GA
Part 2, 2.7 Post Indicator Valve 1 1 1 1 1 1 c/d GA
Part 2, 2.8 Lead Free Valves 1 1 1 1 1 1 c/d GA
Part 2, 2.9 PVC Piping & Fittings 1 c/d GA
Part 2, 3.0 Glues and Solvents 1 1 c/d GA
Part 2, 3.1 Bituminous Material 1 1 c/d GA
21 Part 3, 3.3 Bac-T T
1 1 e GA
Part 3, 3.4 Construction Waste Report
1 e FIO
23 Part 4, 4.1 WCR 103 1 1 a GA
SOLICITATION/CONTRAC
T NO.:
TO BE COMPLETED BY THE PROJECT ENGINEER
NO. OF COPIES REQUIRED
DATE CONTRACTOR NOTIFIED
APPROVED DISAPPROVED
PROJECT NUMBER: JCGU 25-7004
REMARKS
Replace Water Mains, Hydrants, & Valves on Ft.
Griffin Ave
FINAL
APPROVAL
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SE
E
P
AR
A
ON
C
OP
IE
S
OT
HE
RS
A
S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION DATE
DATE
RECEIVED IN
CON-
TRACTING
DATE TO CIVIL
ENGINEER-ING
RETURN
SUSPENSE
DATE
FOLLOW UP CONTRACT-TOR
RE-SUBMITTAL
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SH
OP
D
RA
W
IN
GS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
SA
MP
LE
S
MA
NU
FA
CT
UR
MM
EN
DA
TI
ON
S
CO
LO
R
SE
LE
CT
IO
N
Part 4, 4.5 Nuclear Density Gauge 1 1 1 14 Days Prior GA
Part 4, 4.7 Daily or Weekly Reports 1 as required FIO
AF Form 66
(a) As soon as possible but NLT start of construction
(b) NLT 7 Calendar Days after Task Order NTP
(c) Prior to Start of Construction (f) As soon as possible but NLT 15 days after project completion
(d) Prior to Installation
(e) Prior to Final Inspection
Sheet1
File details come from the government source that posted it. Updated .