5) AF 66- Schedule of Submittals.pdf

PDF 152 KB Posted

Attached to
Replace Water Mains Hydrants Valves-Ft Griffin Federal contract opportunity
Solicitation number
FA303025R0008
Issued by
Department of the Air Force Air Education and Training Command

About this file

The document is an Air Force Form 66 Schedule of Material Submittals for a water infrastructure project at Goodfellow Air Force Base. The project involves replacing water mains, hydrants, and valves on Fort Griffin Avenue, with project number JCGU 25-7004. The schedule details 25 specific material and documentation submittals required from the contractor, including management plans, traffic plans, safety plans, equipment lists, warranties, and technical material specifications for items such as earthwork materials, fire hydrants, valves, PVC piping, and construction reports.

The submittal requirements are categorized with specific submission types (e.g., certification of compliance, shop drawings, manufacturer's warranties) and have varied submission timelines. Most submittals are marked for "GA" (General Approval), with some marked "FIO" (For Information Only). Submission timing ranges from "as soon as possible" to "14 days prior" to specific project milestones, with most requiring submission before construction start, installation, or final inspection. The document includes detailed instructions for when and how each submittal should be processed by the project engineer and contract administrator.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Water Mains Hydrants Valves-Ft Griffin, newest first.
File Type Posted
6) Communications Lines Drawings.pdf PDF
Solicitation Amendment FA303025R00080001 SF 30 .pdf PDF
FA303025R0008 - Questions and Answers.pdf PDF
Base Access Letter (BAL).docx DOCX document
2) Attachment 1- General Requirements.pdf PDF
Solicitation - FA303025R0008.pdf PDF
1) Replace Water Mains Hydrants and Valves- SOW.pdf PDF
4) Wage Determination.pdf PDF
3) Attachment 2 - Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS

SOLICITATION/CONTRAC

T NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER

NO. OF COPIES REQUIRED

DATE CONTRACTOR NOTIFIED

APPROVED DISAPPROVED

Part 1, 1.6, Management Plan 1 b GA

Part 1, 1.6.1, Traffic Plan 1 b GA

Part 1, 1.7.2 Storage Area 1 b GA

Part 1, 1.10 Submittals / 1.10.4

13 4

1 e GA

Part 1, 1.10.1.a Manufacturers Catalog Data

1 e GA

Part 1, 1.10.1.b Manufacturers Warranty

1 f FIO

Part 1, 1.10.1.c Contractors Warranty 1 f FIO

Part 1, 1.10.2 Equipment List - AF Form 3136

1 f FIO

Part 1, 1.10.3 As Builts 1 a GA

Part 1, 1.12 Safety Plan 1 a FIO

11 Part 1, 1.20 BALs 1 a GA

PROJECT NUMBER: JCGU 25-7004

REMARKS

Replace Water Mains, Hydrants, & Valves on Ft.

Griffin Ave

FINAL

APPROVAL

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION DATE

DATE

RECEIVED IN

CON-

TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

SA

MP

LE

S

MA

NU

FA

CT

UR

ER

'S

RE

CO

MM

EN

DA

TI

ON

S

CO

LO

R

SE

LE

CT

IO

N

FORM66.xls

SOLICITATION/CONTRAC

T NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER

NO. OF COPIES REQUIRED

DATE CONTRACTOR NOTIFIED

APPROVED DISAPPROVED

PROJECT NUMBER: JCGU 25-7004

REMARKS

Replace Water Mains, Hydrants, & Valves on Ft.

Griffin Ave

FINAL

APPROVAL

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION DATE

DATE

RECEIVED IN

CON-

TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

SA

MP

LE

S

MA

NU

FA

CT

UR

MM

EN

DA

TI

ON

S

CO

LO

R

SE

LE

CT

IO

N

Part 2, 2.3 Earthwork Materials 1 1 c/d GA

Part 2, 2.4 Flexible Base Material 1 1 1 c/d GA

Part 2, 2.5, Bedding Material 1 1 c/d GA

Part 2, 2.6 Fire Hydrants 1 1 1 1 1 1 c/d GA

Part 2, 2.7 Post Indicator Valve 1 1 1 1 1 1 c/d GA

Part 2, 2.8 Lead Free Valves 1 1 1 1 1 1 c/d GA

Part 2, 2.9 PVC Piping & Fittings 1 c/d GA

Part 2, 3.0 Glues and Solvents 1 1 c/d GA

Part 2, 3.1 Bituminous Material 1 1 c/d GA

21 Part 3, 3.3 Bac-T T

1 1 e GA

Part 3, 3.4 Construction Waste Report

1 e FIO

23 Part 4, 4.1 WCR 103 1 1 a GA

SOLICITATION/CONTRAC

T NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER

NO. OF COPIES REQUIRED

DATE CONTRACTOR NOTIFIED

APPROVED DISAPPROVED

PROJECT NUMBER: JCGU 25-7004

REMARKS

Replace Water Mains, Hydrants, & Valves on Ft.

Griffin Ave

FINAL

APPROVAL

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION DATE

DATE

RECEIVED IN

CON-

TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

SA

MP

LE

S

MA

NU

FA

CT

UR

MM

EN

DA

TI

ON

S

CO

LO

R

SE

LE

CT

IO

N

Part 4, 4.5 Nuclear Density Gauge 1 1 1 14 Days Prior GA

Part 4, 4.7 Daily or Weekly Reports 1 as required FIO

AF Form 66

(a) As soon as possible but NLT start of construction

(b) NLT 7 Calendar Days after Task Order NTP

(c) Prior to Start of Construction (f) As soon as possible but NLT 15 days after project completion

(d) Prior to Installation

(e) Prior to Final Inspection

Sheet1

File details come from the government source that posted it. Updated .