2) Attachment 1- General Requirements.pdf

PDF 299 KB Posted

Attached to
Replace Water Mains Hydrants Valves-Ft Griffin Federal contract opportunity
Solicitation number
FA303025R0008
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document is an Attachment 1 for General Requirements focused on Environmental Protection for a water service line replacement project at Goodfellow Air Force Base. The section details comprehensive environmental compliance requirements for contractors, including regulations from federal agencies like the Environmental Protection Agency (EPA) and various federal and state environmental laws. Key environmental management obligations include:

Contractors must comply with multiple environmental regulations covering hazardous materials, waste disposal, air emissions, water resources, and historical/archaeological site preservation. Specific requirements include maintaining pollution control facilities, preventing environmental contamination, properly handling and disposing of hazardous and non-hazardous waste, protecting land and water resources, and tracking material usage. The document mandates contractors complete environmental awareness training, submit detailed usage tracking forms for hazardous materials, manage construction debris, and follow strict protocols for spill prevention and reporting. Contractors are fully responsible for environmental compliance and potential penalties for violations, with requirements extending to all project activities and personnel.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Water Mains Hydrants Valves-Ft Griffin, newest first.
File Type Posted
FA303025R0008 - Questions and Answers.pdf PDF
Solicitation Amendment FA303025R00080001 SF 30 .pdf PDF
6) Communications Lines Drawings.pdf PDF
Base Access Letter (BAL).docx DOCX document
3) Attachment 2 - Drawings.pdf PDF
5) AF 66- Schedule of Submittals.pdf PDF
4) Wage Determination.pdf PDF
Solicitation - FA303025R0008.pdf PDF
1) Replace Water Mains Hydrants and Valves- SOW.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

February 17, 2023 Section 01400 – Page 1 of 14 Replace Water Service Lines

ATTACHMENT 1

DIVISION 1 - GENERAL REQUIREMENTS

SECTION 01400 - ENVIRONMENTAL PROTECTION

1. APPLICABLE ENVIRONMENTAL REGULATIONS, LAWS, AND PUBLICATIONS:

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only. All publications shall be the latest version / edition / revision of the documents listed below, in effect on the date of this solicitation, except where a date is given.

1.1. Code of Federal Regulations (CFR):

29 CFR, Part 1910 Hazardous Waste Operation and Emergency Response

40 CFR 61, Subpart M National Emissions Standard for Hazardous Air Pollutants

40 CFR, Part 82 Protection of Stratospheric Ozone

40 CFR, Part 117 Determination of Reportable Quantities for Hazardous

Substances

40 CFR, Part 122 National Pollutant Discharge Elimination System

(NPDES) Regulations

40 CFR, Parts 260 - 282 Solid Waste Regulations

40 CFR, Part 302 Designation, Reportable Quantities, and Notification

49 CFR, Parts 171-176 Hazardous Materials Regulations, Department of

Transportation, (DOT) Rules

1.2. Environmental Protection Agency Publication (EPA):

EPA Publication No. SW-846 Test Methods for Evaluating Solid Waste

1.3. Environmental Laws:

Archaeological and Historic Preservation Act (AHPA)

Archaeological Resources Protection Act (ARPA)

Clean Air Act (CAA) and all amendments

1591846821C Rectangle

February 17, 2023 Section 01400 – Page 2 of 14 Replace Water Service Lines

Clean Water Act (CWA) as amended

Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA)

Endangered Species Act (ESA)

Emergency Planning and Community Right-To-Know Act (EPCRA)

Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) as amended

Federal Water Pollution Control Act (FWPCA)

National Oil and Hazardous Substances Contingency Plan (NCP)

Occupational Health and Safety Act (OSHA)

Oil Pollution Act (OPA)

Pollution Prevention Act (PPA)

Resources Conservation and Recovery Act (RCRA)

Safe Drinking Water Act (SDWA), as amended

1.4. State Regulations (Texas Administrative Code):

25 TAC§295 Occupational Health

30 TAC§205 General Permit to Discharge Waste

30 TAC§290 Public Drinking Water

30 TAC§335 Industrial Solid Waste and Municipal Hazardous Waste

1.5. Air Force Instruction (AFI): 32-7001 Environmental Management

1.6. Air Force Manual (AFMAN): 32-7002 Environmental Compliance and Pollution

Prevention

1.7. Energy Independence and Security Act (EISA) Section 438

2. ENVIRONMENTAL ISSUES

2.1. Activities which are implemented, in whole or in part with approved funding, must comply with applicable legislation and regulations established to protect the human or physical environment. The

Contractor will remain in compliance with Federal statutes during the performance of the contract, including but not limited to the Clean Air Act (CAA), Clean Water Act (CWA), Endangered Species

Act (ESA), Resource Conservation and Recovery Act (RCRA), and other applicable laws, regulations, and requirements.

February 17, 2023 Section 01400 – Page 3 of 14 Replace Water Service Lines

2.2. In order to comply with all Environmental Laws and Regulations as set forth by Federal, State, Department of Defense, Air Force and any other mandated requirements for Federal installations, Goodfellow AFB (GAFB) must comply with and are required to identify, manage and track all chemicals (hazardous materials), air emissions, stormwater, and construction and debris (C&D) that are transported, managed, used, and disposed of from any part of this installation. This requirement is for all installation organizations, workplaces, work centers, shops, and for all Contractors doing any work on the installation. Contractors shall investigate, comprehend, and comply with all environmental rules and regulations applicable to their chosen method of accomplishment of the work under this contract.

2.3. The Contractor will be responsible for and will indemnify and hold the Government harmless for any and all spills, releases, emissions, and discharges of any toxic or hazardous substance, any pollutant, or any waste, whether sudden or gradual, caused by or arising under the performance of this contract or any substance, material, equipment, or facility utilized therefore for the purposes of any environmental statute or regulation. The Contractor will be considered the "operator" for any facility utilized in the performance of the contract, and will indemnify and hold the Government harmless for the failure to adhere to any applicable law or regulation established to protect the human or physical environment.

The Contractor will be responsible in the same manner as above regardless of whether activities leading to or causing a spill, release, emission, or discharge is performed by the contractor, its agent or designee, an offender, visitor, or any third party.

3. PROTECTION OF RESOURCES

3.1. Construction activities are NOT exempt from air emission, stormwater, hazardous waste, and other environmental compliance rules and regulations. Contractor shall investigate, comprehend, and comply with all environmental rules and regulations applicable to his/her chosen method of accomplishment of the work under this contract.

3.2. Protection of Land Resources: The Contractor shall confine his/her construction activities to areas defined by the plans and specifications and/or as approved in his/her Storage Area submittal (refer to paragraph 7). Except in areas to be cleared, the Contractor shall not remove, cut, deface, injure or destroy trees or shrubs without written permission from the Natural Resource Officer/Manager and

Contracting Officer. Do not fasten or attach ropes, cables, or guys to existing or nearby trees for anchorage unless authorized by the Natural Resource Officer/Manager and the Contracting Officer.

Where such use of ropes, cables, or guys is authorized, the Contractor shall be responsible for any resultant damage.

3.3. Protection of Historical and Archaeological Resources: All known Historical, Archaeological, and Cultural Resources, if any, within the Contractors work area will be designated on the contract drawings. The Contractor shall take precautions during the contract to preserve all Resources as they existed at the time of contract award and comply with the Archaeological and Historic Preservation Act

(AHPA) and the Archaeological Resources Protection Act (ARPA). The Contractor shall provide all protective devices such as off limit markings, fencing, barricades, or other devices as designated on the contract drawings and shall be responsible for preservation of the sites during this contract.

3.3.1. Recording and Preserving Historical and Archaeological Finds: All items having any apparent historical or archaeological interest outside of designated areas which are discovered in the course of

1591846821C Rectangle

February 17, 2023 Section 01400 – Page 4 of 14 Replace Water Service Lines any construction activities shall be carefully preserved. The Contractor shall protect the find in-place by leaving the archaeological find undisturbed and by using flags to mark a fifty-foot radius area around the find. The find shall be immediately reported to the Contracting Officer and the Cultural Resources

Manager so that the proper authorities may be notified. All work shall be stopped at once in the immediate area of the discovery until directed by the Contracting Officer to resume work. Any work required to preserve or protect these finds shall be accomplished before work resumes.

3.4. Protection of Water Resources: The Contractor shall not pollute streams, lakes, or reservoirs with fuels, oils, bitumens, calcium chloride, acids, construction wastes, siltation from stormwater runoff, or other harmful materials identified in 40 CFR Parts 117 and 302. It is the responsibility of the

Contractor to investigate, comprehend, and comply with all applicable Federal, State, County, and

Municipal regulations and ordinances concerning pollution of rivers and streams. All work under this contract shall be performed in such a manner that objectionable or nuisance conditions will not be created in lakes, reservoirs, or streams through or adjacent to the project areas. Any Task Order which adds 5,000 SF or more of new horizontal impervious surface must be Energy Independence and Security

Act (EISA) Section 438 compliant.

3.4.1. Regardless of the amount of soil disturbed, all non-storm water discharges shall conform with the base’s Storm Water Management Program regulated by TPDES General Permit TXR040000 for

Small Municipal Separate Storm Sewer Systems (MS4).

3.4.2. Post-Construction Cleanup or Obliteration: The Contractor shall obliterate all evidence of temporary construction facilities such as haul roads, work areas, structures, foundations of temporary structures, stockpiles of excess materials, or any other vestiges of construction. It is anticipated that excavation, filling, and plowing of roadways shall be required to restore the area to near natural conditions, which will permit the growth of vegetation thereon. The disturbed areas shall be graded and filled as required, and topsoil shall be spread to a depth of approximately four inches over the entire area and the entire area seeded with thirty pounds (pure live seed) of common Bermuda per 1000 square feet, and then watered as required until a lush, hardy growth is established. Restoration to original contours is required unless otherwise directed by the Contracting Officer.

3.5. Drinking Water: No water connection from any public drinking water supply system shall be allowed to any residence or establishment where an actual or potential contamination hazard exists unless the public water facilities are protected from contamination. No direct connection or cross-connections between the public drinking water supply and a potential source of contamination is permitted. Potential sources of contamination shall be isolated from the public water system by an air-gap or an appropriate backflow prevention device.

3.5.1. Contractor shall comply with and provide documentation required by 30 TAC 290.46 (j), pertaining to customer service inspections.

3.5.2. General: The Contractor shall ensure a customer service inspection (CSI) certificate is completed and approved by the CO prior to providing continuous water service to all new construction, to existing service where contaminant hazards are suspected, or in conjunction with major renovation or expansion of the drinking water distribution system.

3.5.3. Form: The Contractor shall use the most current TCEQ approved CSI certificate form (TCEQ Form 20699) A copy of the completed CSI form shall be provided to the Contracting Officer (forward to Environmental Office).

1591846821C Rectangle

February 17, 2023 Section 01400 – Page 5 of 14 Replace Water Service Lines

3.5.4. License: The inspection and certificate may only be completed by a Plumbing Inspector, a Water Supply Protection Specialists licensed by the Texas State Board of Plumbing Examiners, or a Customer Service Inspector who has completed a TCEQ-approved course, passed an examination administered by the executive director, and holds a current professional certification or endorsement as a customer service inspector.

3.5.5. No pipe or pipe fitting which contains more than 0.25% lead may be used for the installation or repair of plumbing at any connection which provides water for human use.

3.5.6. No solder or flux which contains more than 0.2% lead can be used for the installation or repair of plumbing at any connection which provides water for human use.

3.5.7. All fire hydrants on base that are to be used by the Contractor must be used in conjunction with an approved Class III Back Flow Preventer (reduced-pressure principle backflow assembly device) and screw type globe valve attached to the hydrant. At the Contractors expense the backflow prevention device must be properly installed, tested and maintained. Copies of the testing and maintenance records, if applicable, shall be provided to the Contracting Officer, and GAFB Environmental Element.

3.6. Protection of Fish and Wildlife: The Contractor shall follow all Federal, State, County, and

Municipal laws regarding the protection of fish and wildlife. The Contractor shall at all times perform all work and take such steps required to prevent any interference of disturbance to fish and wildlife. The

Contractor shall not alter water flows or otherwise disturb native habitat adjacent to the project area, which, through Contracting Officer and GAFB Natural Resources Officer/Manager, that are critical to fish or wildlife. Construction of check dams in live streams will not be permitted. Fouling or polluting of water will not be permitted. Harassment, harvesting, or taking of any wildlife is not permitted on

Federal property, nor is the taking of any resource such as antler sheds, skulls, plant life, or rocks/gems.

3.7. Protection of Air Quality: The Contractor shall investigate, comprehend, and comply with all applicable Federal, State, County and Municipal laws concerning air pollution, particularly the CAA

(and all subsequent amendments). All work under this contract shall be performed in such a manner that objectionable or nuisance conditions will not be created in the air, nor will objectionable particulates be released to the air. Material usage of welding rods, welding gases, paints, thinners, solvents, fuels, and asphalt will require reporting to the Contracting Officer (Forward to Environmental Office) monthly throughout the project (VIA form Appendix A and AF Form 3000). No open burning shall be permitted on base.

3.7.1. Dust Control: The Contractor shall maintain all excavations, embankments, stockpiles, haul roads, permanent access roads, plant sites, waste areas, borrow areas, and all other work areas within or without the project boundaries free from dust in accordance with all applicable local, state, and Federal regulations for the control of dust and particulate emissions. Temporary methods of stabilization consisting of sprinkling with water are required to control dust. Sprinkling with water shall be repeated at such intervals as to keep all parts of the disturbed area at least damp at all times. Gravel paving shall be provided for entrance and exit drives, parking areas, and unpaved roads carrying more than 25 vehicles per day on the construction site.

February 17, 2023 Section 01400 – Page 6 of 14 Replace Water Service Lines

4. HAZARDOUS MATERIALS:

4.1. Contractors using any type of chemicals (hazardous materials) on Goodfellow AFB must comply with the review and approval process and shall provide the Contracting Officer with a list of proposed materials that it plans to use on the installation during the performance of the contract.

4.2. The Contractor shall provide to the Contracting Officer an AF Form 3000, a Material and

Approval Submittal, listing all materials that will be utilized during the contract period. If any of those materials are classified as hazardous and are covered under the Emergency Planning and Community

Right-to-Know Act (EPCRA) (42 U.S.C. 11001-11050) or other applicable host Nation, Federal, State, or Local tracking or reporting requirements and also covered under the Occupational Safety and Health

Administration (OSHA) Hazard Communication (HAZCOM) Standard (29 CFR 1910.1200) then those materials must be included in the material list submittal.

4.2.1. The Installation HAZMAT Management Program (IHMP) office will determine if any of the proposed materials to be used are hazardous materials (HAZMATs) and will require approval authorizations prior to bringing on or using any of those materials on the installation.

4.3. The Contractor will submit a current Safety Data Sheet (SDS) for each hazardous material to be used under this contract. The Contractor must maintain an on-site file of all SDS during the performance of this contract.

4.4. The Contractor must obtain written authorization from the Contracting Officer and IHMP office prior to bringing or using any hazardous chemicals on the installation. The Contractor shall submit a hazardous chemicals usage report of all hazardous chemicals for Government Approval (via AF Form

3000) to the Contracting Officer on a monthly, quarterly basis, or at the end of the contract, as determined by the Contracting Officer and the IHMP.

4.4.1. The main Contractor is responsible for the hazardous chemical submittals for approval to the

Contracting Officer and then to the IHMP office.

4.5. A copy of the DOD INSTALLATIONS OR FACILITIES STANDARD OPERATING

PROCEDURE (SOP) - Contractor Tracking Requirement document will be provided to the Contractor at the pre-performance meeting describing the requirement for all Contractors to submit a Contractor

Hazardous Materials Usage Tracking Form (to be completed by the Contractor) and copies of the Safety

Data Sheets (SDS’s) for all chemicals that will be used under any contract.

4.6. If additional hazardous materials are required during the course of the contract, the Contractor shall complete an authorization worksheet and provide an SDS for each additional hazardous material via AF Form 3000 for Government approval prior to bringing or using any additional hazardous materials onto the installation. The Contractor shall submit the new authorization worksheet no later than 15 days prior to delivery of the hazardous materials onto the installation.

4.7. The Contractor shall report hazardous material usage data via AF Form 3000 to the Contracting

Officer (forward to the Environmental Office) on a monthly, quarterly, or end of project basis, as determined by the Contracting Officer. The report will show the product name and part number (stock

1591846821C Rectangle

February 17, 2023 Section 01400 – Page 7 of 14 Replace Water Service Lines number if already assigned to each material), any amount received during this period, unit of issue, amount used during this period, and any balance left to still be used by the Contractor.

4.8. Safety Data Sheets (SDS) are required as specified in the latest version of Federal Standard No.

313 (including revisions adopted during the term of the contract) for any material designated by a

Government representative as potentially hazardous and requiring safety controls. SDSs must be submitted by the Contractor upon contract award. Failure to provide SDSs or certificate when requested could result in the Contractor being considered non-responsive and result in termination of the contract.

4.8.1. While there is no single definition that encompasses every type of hazardous chemical, these items generally have a Safety Data Sheet (SDS) prepared by the manufacturer. It is important to note that not every material with an SDS is automatically considered a hazardous material. When there is a question regarding whether or not a material is hazardous, additional guidance should be sought from the CO/COR where they can then forward questions about those materials to the installations

Environmental, Safety and Occupational Health (ESOH) team thru the Environmental Office.

4.8.2. Globally Harmonized System (GHS) of Classification and Labeling of Chemicals, per 29 CFR

1910.1200(g) requires that the chemical manufacturer, distributor, or importer provide Safety Data

Sheets (SDSs) for each hazardous chemical to downstream users to communicate information on these hazards. It also mandates that all workplaces shall not have any SDSs older than five (5) years old and meet the new GHS requirements.

4.9. The Contractor shall not use products that are, or contain any Toxic 17 chemicals, Extremely

Hazardous Substances (EHS), Ozone Depleting Substances (ODS), CFC’s, or Persistent Bio-accumulative and Toxic (PBT) chemicals. Any Hazardous Material (HM) containing any of these banned substances will not be allowed on the installation.

4.10. If the hazardous material request is for a Class I ODS, CE will ensure there is an applicable and current Air Force Senior Acquisition Official (SAO) approval for contract Class I ODS requirements before approving the hazardous material authorization and make this information available to the

Contractor.

4.11. For each Contractor-identified chemical that the IHMP determines does not meet the definition of a hazardous material, then the IHMP requirements do not apply. The IHMP will notify the

Contracting Officer that the Contractor has authorization to bring and use that material on the installation without reporting usage unless required under the Green Procurement Program or specifications require data submittals.

5. DISPOSAL OF NON-HAZARDOUS AND SPECIAL WASTES:

5.1. Non-Hazardous Wastes: Non-hazardous solid waste is regulated under 42 U.S. Code Chapter 82

– Solid Waste Disposal - Resource Conservation and Recovery Act (RCRA) Subtitle D, 40 CFR Part

239-259 and under State of Texas 30 TAC §330 - Municipal Solid Waste Rules. Regulations established under Subtitle D ban open dumping of waste and set minimum federal criteria for the operation of municipal waste and industrial waste landfills. The Contractor shall transport and dispose of all non-

1591846821C Rectangle

February 17, 2023 Section 01400 – Page 8 of 14 Replace Water Service Lines hazardous wastes to and in a State of Texas permitted facility or other disposal facility permitted by the state in which the disposal facility is located.

5.2. Special Wastes: Special Wastes are any wastes that are non-hazardous, yet have to be stored, transported, and/or disposed of in a special manner; for example, asbestos containing wastes or petroleum contaminated soil. The Contractor shall store, transport and dispose of all Special Wastes in accordance with all Federal, State, and Local laws, rules and regulations as applicable. The disposal facility must also be approved by the Installations Environmental Office prior to transportation. The

Contractor shall make all necessary arrangements with the disposal facility for disposal of Special

Wastes.

5.3. The Contractor shall submit all transportation and disposal documentation to the Contracting

Officer (forward to the Environmental Office), including but not limited to, waste profiles, bills of lading, manifests, etc. at no additional cost to the Government.

6. HAZARDOUS WASTE:

6.1. The Contractor shall accumulate, transport, and dispose of all hazardous waste in accordance with Federal hazardous waste regulations 40 CFR 260-279 and the Texas hazardous waste regulations described in 30 TAC Chapter 335, and Federal transportation regulations 49 CFR 171-176. The

Contractor shall prepare and maintain all records, shipping documents, training certificates, plans, and other documents required by regulation. The Contractor shall submit copies of records, shipping documents, training certificates, plans, manifests, land disposal restrictions and other documents pertaining to this contract and required by 30 TAC, Chapter 335 to the Contracting Officer (forward to

Environmental Office). All manifests and land disposal restrictions must be signed by the Installations

Environmental Office.

6.2. The Contractor shall remove all hazardous waste pertaining to this contract from Goodfellow

AFB on a daily basis unless the accumulation and storage is specifically approved in writing by the

Contracting Officer and the Installations Environmental Office. Such approval must be given prior to the generation of any hazardous waste. Approval for accumulation or storage of hazardous wastes in excess of 55 gallons or greater than 1 quart of acutely hazardous waste, for greater than three (3) calendar days will require a minimum lead time of forty-five (45) calendar days from the date of the receipt of the request. The Contractor shall transport hazardous wastes from Goodfellow AFB to a

Treatment, Storage, or Disposal Facility (TSDF) permitted by the State of Texas, the EPA, and approved by the Base Environmental Coordinator. Under no circumstances shall disposal or treatment of hazardous wastes be allowed on Goodfellow AFB by the Contractor.

6.3. Reasonable and appropriate measures shall be taken by the Contractor to prevent chemicals, fuels, oils, greases, bituminous materials, waste washings, herbicides and insecticides, and construction materials or debris from polluting the construction site and surrounding area.

6.3.1. The Contractor will be responsible for any and all spills, releases, emissions, and discharges of any toxic or hazardous substance, any pollutant, or any waste, whether sudden or gradual, caused by or arising under the performance of the contract or any substance, material, equipment, or facility utilized

1591846821C Rectangle

February 17, 2023 Section 01400 – Page 9 of 14 Replace Water Service Lines therefore for the purposes of any environmental statute or regulation to protect the human or physical environment.

6.3.2. The Contractor will be responsible in the same manner as above, regardless of whether activities leading to or causing a spill, release, emission or discharge is performed by the contractor, its agent or designee, an offender, visitor, or any third party. If the contractor spills or releases any substance into the environment, the Contractor will immediately report the incident to the Contracting Officer, the

Installation Environmental Office and the Installation Fire Department.

6.3.3. The liability for the spill or release of such substances rests solely with the contractor and its agent and at no time will the contractor dispose of hazardous, toxic or caustic substances by unsafe methods. Unsafe methods include spreading or pouring it onto the ground, dumping in a lake, river or stream, and flushing into sewers.

6.3.4. Any materials to be disposed including wastes, effluents, trash, garbage, oil, grease, chemicals, and similar hazardous substances shall be transported to a suitable disposal site by the Contractor subject to the approval of the Contracting Officer and the Environmental Office.

6.3.5. Aerosol Cans: Aerosol cans, after use, must be punctured and drained of product and propellant via approved equipment manufactured for that purpose. The empty cans may then be recycled as scrap metal. Disposal of the internal aerosol can contents shall be accomplished according to its waste classification.

6.3.6. Other Containers: Refer to 30 TAC§335.41(f) for criteria regarding management and disposal of other containers.

6.3.7. The Contractor shall submit all transportation and disposal documentation to the Contracting

Officer (forward to the Environmental Office), including but not limited to, waste profiles, bills of lading, manifests, etc. at no additional cost to the Government prior to the Final Inspection.

6.3.8. The Government will, as is deemed necessary, inspect the Contractor’s operations and records for compliance with Air Force, State and Federal regulations. The Contractor shall cooperate fully with the TCEQ, US EPA and/or Government representatives during these inspections, if any. The Contractor shall be fully and completely responsible for payment of all fines and/or penalties imposed by the TCEQ or US EPA for violation of regulations governing Environmental Management during performance of this contract.

6.3.9. NOTICE: No hazardous materials, lubricants, oils, liquids, general refuse or related materials shall be deposited in the refuse containers on base. The contractor will adhere to all other Federal, State, and Local guidelines regarding environmental practices.

6.3.10. ONSITE DUMPING/CLEANING: Dumping/cleaning out of concrete trucks on Goodfellow

AFB is prohibited. Concrete truck chutes only may be rinsed at the construction site. Wastewater and concrete from this rinse shall be collected in a high-density polyethylene plastic-lined box or pit provided by the Contractor at an approved located at the jobsite. At the end of pouring operations, 1591846821C Rectangle

February 17, 2023 Section 01400 – Page 10 of 14 Replace Water Service Lines the Contractor shall excavate all the waste and liner and properly dispose of the same. The pit shall be completely backfilled, and the site restored to original conditions.

7. MAINTENANCE OF POLLUTION CONTROL FACILITIES DURING CONSTRUCTION

7.1. During the life of this contract the Contractor shall maintain all facilities constructed for pollution control under this contract for as long as the operations creating the particular pollutant are being carried out or until the material concerned has become stabilized to the extent that pollution is no longer being created. During the construction period, the Contractor shall conduct frequent training courses for his/her maintenance personnel. The curricula shall include methods of detection of pollution, familiarity with pollution standards, and installation and care of vegetation covers, plants, and other facilities to prevent and correct environmental pollution.

8. SPILLS

8.1. Goodfellow AFB maintains, follows, and enforces the following spill plans for regulated substances.

a) Hazardous Materials Emergency Response Plan

b) Spill Prevention Control and Counter Measures Plan

8.2. These plans are maintained by the Installation Management Flight of Civil Engineering at 460 E.

Kearney Blvd, Goodfellow AFB. The Contractor shall take preventive measures (secondary containment for fuel storage, avoid overfilling of trucks, etc.) to avoid spills. If a spill does occur, the

Contractor shall immediately notify the Goodfellow AFB Fire Department at phone number 325-654-

3532 or 325-654-7000. The Installation Fire Department is the first responder who will take charge to secure/neutralize the event, if required and will coordinate cleanup/remedial actions. Notification shall be made even if the spill is within the cleanup capabilities of the Contractor.

8.3. If the Contractor spills or releases any substance into the environment, the contractor shall immediately report the incident to the Installation Environmental Office at 325-654-5946. The

Contractor shall be liable for containment and environmental clean-up of the spill or release.

8.4. The Contractor may be held liable for all expenses incurred by the Government during the spill response and any cleanup operations including, but not limited to a hazardous materials/waste cleanup

Contractor, supplies and equipment rental, waste transportation, laboratory analysis, and disposal costs.

9. LEAD:

9.1. Under no circumstances, under the provisions of this contract, shall the Contractor be allowed to provide Lead Based Paint (LBP), paint products or lead building materials. The definition of Lead

Based Paint is paint or other surface coating that contains lead to or in excess of 1.0 milligrams per square centimeter or more than .5% by weight (5000ppm).

9.2. No pipe or pipe fitting which contains more than 0.25% lead may be used for the installation or repair of plumbing at any connection which provides water for human use.

February 17, 2023 Section 01400 – Page 11 of 14 Replace Water Service Lines

9.3. No solder or flux which contains more than 0.2% lead can be used for the installation or repair of plumbing at any connection which provides water for human use.

10. RELEASE OF FLUIDS TO THE SANITARY SEWER SYSTEM:

10.1. Goodfellow AFB’s sanitary sewer system discharges into the Publicly Owned Treatment Works

(POTW) operated by the City of San Angelo, Texas. This POTW has established testing requirements for certain constituents as well as discharge limits of those same constituents. Accordingly, any

Contractor performing work at Goodfellow AFB and contemplating a release of non-hazardous water into the sanitary sewer system shall comply with the testing/release requirements established by the City of San Angelo. The Contractor is also responsible for any and all testing, monitoring, measuring, documenting, etc. to prove compliance with same.

11. GREEN PROCUREMENT PROGRAM (GPP)

11.1. Green Procurement is defined as "The purchase of environmentally preferable products and services in accordance with Federally mandated “green" procurement preference programs.

11.2. Priority should be given to products that emphasize the source reduction aspect of the Air Force's

Pollution Prevention hierarchy and those that incorporate one, or all, of the following mandatory GPP elements: Recovered Materials, Energy and Water Efficient, Alternate Fuels and Fuel Efficiency, Bio-based, Ozone Depleting Substances, Priority Chemicals, and Environmentally Preferable Products

(EPP).

12. AIR EMISSION SOURCE REPORTING

12.1. The Contractor shall comprehend and comply with all applicable Federal, State, County and

Municipal laws concerning air pollution, particularly the Clean Air Act (CAA) and all subsequent amendments. All work under this contract shall be performed in such a manner that objectionable or nuisance conditions will not be created in the air, nor will objectionable particulates be released into the air.

13. CONSTRUCTION & DEBRIS

13.1. Construction and Demolition (C&D) debris consists of the waste generated during construction, renovation, and demolition projects. Covering a wide array of materials, this waste often contains bulky, heavy materials, including concrete, wood, asphalt (from roads and roofing shingles), gypsum (the main component of drywall), metals, bricks, plastics, and plant materials from site clearing. C&D debris also includes salvaged building components such as doors, windows, and plumbing fixtures.

13.2. When a project involves any type of construction, remodeling, or demolition, the Contractor shall use all means available to divert to the greatest extent practicable and economically feasible, construction and demolition waste from landfills. At the end of the project, and prior to final acceptance, the Contractor shall submit a solid waste diversion report (the form is included in this document

Appendix B) identifying the materials and weights either recycled or diverted from solid waste disposal

1591846821C Rectangle

February 17, 2023 Section 01400 – Page 12 of 14 Replace Water Service Lines to other re-use as well as weights of waste disposed in a landfill. The report shall be submitted via AF

Form 3000 to the Contracting Officer (forward to Environmental Office).

14. TRAINING

14.1. The Contractor shall ensure all employees complete the required Hazardous Communication

(HAZCOM), Hazardous Materials and Hazardous Waste training required for this project. If hazardous materials are used and/or hazardous wastes are generated as part of this contract, then the Contractor shall appoint a primary and alternate HAZMAT and Hazardous Waste monitor. The Contractor is responsible for training all Contractor personnel regarding environmental aspects associated with the project.

15. ENVIRONMENTAL MANAGEMENT SYSTEM (EMS):

15.1. The Contractor’s on-site supervisory personnel shall complete the EMS Awareness Training

(EMS100AFIT00004) program prior to commencement of any activities. The Installation

Environmental Office should be contacted at (325) 654-5946 for information about this 7-minute awareness training within 60 days of contract award or a new contract employee supervisor begins work.

The training will be accomplished utilizing web-based The Environmental Awareness Course Hub

(TEACH) available through any internet access at https://usaf.learningbuilder.com/

15.2. The training above will be tracked by the Environmental System Administrator.

https://usaf.learningbuilder.com/

Rectangle

Air Emission Source Reporting

1. From:

2. TO: 17 CES/CEV

460 E. Kearney Blvd Bldg. 3511, Rm 107 Goodfellow AFB, Texas 76908

3. Month/Year Ending

(mmm/yyyy)

4. ITEM SOURCE 5. Starting Hours 6. Ending Hours 7. Run Total

Engine run times - (Generator)

Engine run times - (Pumps)

Engine run times - (Welders)

9. REPORTED BY (Name, Orgn, Phone)

9a. DATE

10. ENTERED BY (Name, Orgn)

10a. DATE

Form Instructions:

1. Organization and address of organization and/or Contractor providing the report

2. Organization and address of office receiving report

3. Ending month and year for data being reported

4. Name of item being reported, for example: Engine run times - (Pumps), etc.

5. Starting hours for the units being reported for this reporting period

6. Ending hours for the units being reported for this reporting period

7. Run Total of each item - Note: This is the difference between the starting hours and ending hours for each unit

8. Name, organization and phone number of person providing report

9a. Date of report

9. Name of person performing data entry

10a. Date of data entry

Project: __________________________________________ Date: _____________________

Contractor: _______________________________________

Construction Waste Management Form

Material Type Recycled (pounds)

Recycling Company

Landfill (pounds) Landfill Used

Costs / Proceeds

Asphalt

Bricks

Concrete

Dirt/Soil

Dumpster Debris

Freons/Refrigerants

Light Bulbs

Lumber/Wood

Metals

Oil/Petroleum

Plastics

Roofing

Steel

Wastewater

San Angelo Area Recycling Haulers and Markets

Ric Abbott Co., 6577 S. US Hwy 277, San Angelo (325) 656-4087

Acme Iron & Metal Co., 720 N. Buchanan, San Angelo (325) 653-1407

Butts Recycling Inc., 615 W 11th St, San Angelo (325) 653-8957

SAFE Citizen’s Recycling Center, 702 Warehouse Rd., San Angelo (325) 659-0722

San Angelo Area Landfill

Trashaway Services Inc., 3002 Old Ballinger Hwy, San Angelo (325) 655-6869

Contractor Hazardous Materials Usage Tracking Form Return this form to Contracting/Project Manager with manufacturers original SDS

The following information is required for tracking of all hazardous materials on the installation. For contracts exceeding six months, this form is required to be filled out Monthly and returned to the Government Representative, who will return it to the HAZMAT Environmental office for processing. This information is required in order to comply with Environmental Laws and Regulations. For purchase orders and/or contracts less than six months, this form is required at the start and at the completion of the work.

Shop Code: Base: Goodfellow AFB, TX Contractor Name:

Date of Report: Reporting Period:

Contract Officer/Project Manager:

Contractor POC for obtaining Hazardous Materials information Name:

Phone: Email:

Contract#: Project #:

Location of Work & Description:

Project/Contract Start Date: End Date:

Safety Data Sheet (SDS)

Product Identifier

Part #

Manufacturer

Type of

Container

Size of

Estimate

Quantity to be

Used

Total

Quantity

Used

EESOH MSN (to be added by

IMMP)

Example: PROMAR 400 Interior Latex

Semi-Gloss Enamel, Extra White

Process (How is material used): Used to paint H-62 office interior walls.

B31W4451

SHERWIN WILLIAMS

**EXAMPLE**

CO

1 GL

8010PHM00002556

Estimate

Quantity to be

Used

Total

Quantity

Used

Estimate

Quantity to be

Used

Total

Quantity

Used