Attach 7) Questions and Answers.pdf

PDF 115 KB Posted

Attached to
B140 Foundation Repair
Solicitation number
FA303022R0006
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building 140 Mathis Gymnasium

Questions and Answers

Solicitation #FA303022R0006

No. Question Answer

1 Are there any photos of the project?

Photos will be taken and attached.

Photos were placed in and along with the provided drawings.

2 Can we schedule another site visit?

No, we will not be scheduling another site visit at this time, photos of the site will be posted

Will there be drawings with dimensions for calculating the amount of polyurethane to be installed?

Photos of the site will have crack dimensions added.

Drawings show location and length of failure.

Will the Government eliminate the statement and reporting requirement or, if required specify the penetration testing for before and after injections?

The Contractor shall perform DCP testing and provide reports back to the

Government.

SOW paragraph 1.2 states “The testing shall be performed by a third party entity that performs this type of testing.” Will the

Government eliminate this requirement

The Government will waive testing from a third party entity, provided the

Contractor can ensure that soil stabilization has been achieved and a written warranty is provided to the

Government for work performed.

SOW Paragraph 1.5For HDPF installation, will the Government eliminate any mention of craftsman guild certifications?

The Government will waive certifications provided the Contractor can provide on-site supervisory personnel to oversee labor type personnel as work is being performed.

SOW Paragraph 3.3D. Will the government provide GPR testing results to affirm there are no utilities or damageable systems under the work area? If the government deems there are no issues, will the government hold the contractor harmless should an unknown item be damaged and will the time to repair the item be credited to the project competition suspense timeframe?

Per the SoW Part 4.0, 4.1. The

Contractor shall initiate, submit, and process an AF Form 103 for approval prior to commencement of work for this project. Upon request As-built drawings can be provided to the Contractor as well as coordinating with the civil engineering operations department to assist in locating utility lines (water, sewer, etc.)

No GPR testing reports are available, nor will GPR testing be performed by the

Government.

SOW Paragraph 1.2. Geotech company stated soil will not be affected by foam work and the type of testing will have the same results. Is this testing required?

The Contractor shall perform DCP testing and provide reports back to the

Government. The Contractor shall ensure that soil stabilization has been achieved and a written warranty is provided to the

Government for work performed.

File details come from the government source that posted it. Updated .