Building 140 Mathis Gymnasium
Questions and Answers
Solicitation #FA303022R0006
No. Question Answer
1 Are there any photos of the project?
Photos will be taken and attached.
Photos were placed in and along with the provided drawings.
2 Can we schedule another site visit?
No, we will not be scheduling another site visit at this time, photos of the site will be posted
Will there be drawings with dimensions for calculating the amount of polyurethane to be installed?
Photos of the site will have crack dimensions added.
Drawings show location and length of failure.
Will the Government eliminate the statement and reporting requirement or, if required specify the penetration testing for before and after injections?
The Contractor shall perform DCP testing and provide reports back to the
Government.
SOW paragraph 1.2 states “The testing shall be performed by a third party entity that performs this type of testing.” Will the
Government eliminate this requirement
The Government will waive testing from a third party entity, provided the
Contractor can ensure that soil stabilization has been achieved and a written warranty is provided to the
Government for work performed.
SOW Paragraph 1.5For HDPF installation, will the Government eliminate any mention of craftsman guild certifications?
The Government will waive certifications provided the Contractor can provide on-site supervisory personnel to oversee labor type personnel as work is being performed.
SOW Paragraph 3.3D. Will the government provide GPR testing results to affirm there are no utilities or damageable systems under the work area? If the government deems there are no issues, will the government hold the contractor harmless should an unknown item be damaged and will the time to repair the item be credited to the project competition suspense timeframe?
Per the SoW Part 4.0, 4.1. The
Contractor shall initiate, submit, and process an AF Form 103 for approval prior to commencement of work for this project. Upon request As-built drawings can be provided to the Contractor as well as coordinating with the civil engineering operations department to assist in locating utility lines (water, sewer, etc.)
No GPR testing reports are available, nor will GPR testing be performed by the
Government.
SOW Paragraph 1.2. Geotech company stated soil will not be affected by foam work and the type of testing will have the same results. Is this testing required?
The Contractor shall perform DCP testing and provide reports back to the
Government. The Contractor shall ensure that soil stabilization has been achieved and a written warranty is provided to the
Government for work performed.