Attach 2) Drawings.pdf
PDF 3 MB Posted
- Attached to
- B140 Foundation Repair
- Solicitation number
- FA303022R0006
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Installation Layout
GOODFELLOW AIR FORCE BASE
Map Path: F:\Geo Base Data\Maps\0 Tem plates\BaseMapTem plate (current).m xd
Th is m ap is fo r reference o nly. Alth o ugh every effo rt h as been m ade to ensure the accuracy o f info rm atio n, erro rs and co nditio ns o riginating fro m physical so urces used to develo p the database m ay be reflected o n th is m ap. IGI&S “Geo Base” sh all no t be liable fo r any erro rs, o m issio ns, o r dam ages that result fro m inappro priate use o f th is do cum ent.
S
S
VBC
BBC
VBC VBC TC TC TCVB
C
VB
CBBC TC
PT Pad
BBC
BB
C
BBC
VBC
VBC
TC
Little League Ballfield
Ballfield #2
Running Track
Fo o tball Field
Ballfield #1
Multi Purpo se Field
Ch ina B ea ch
Sw im m i ng P o o l
Mc Ga rr
Sw im mi ng
Po ol
RETENTION
POND
RETENTION
POND
RETENTION
POND
RETENTION
POND
SC
HE
RZ
B
LV
D.
MARAUDER STREET
VALIANT STREET
COMANCHE TRAIL
CANBERRA STREET E
W. CANBERRA STREET
FARROW STREET
FT
.L
A N
CA
ST
E R
AV
EN
U E
VANCE STREET
FT
. G
RI
FF
IN
AV
EN
UE
KE
AR
NE
Y B
LV
D.
FT. RICHARDSON CO
UR
T
PERIMETER ROAD SW
POWELL STREET
KI
OW
A
TR
AI
L
HORNET STREET
KAYDET STREET
VANCE STREET
KICKAPOO TRAIL
FL
IG
HT
LIN
E A
VE
NU
E
AP
AC
HE
TR
AI
L
CH
AL
LE
NG
ER
AV
EN
UE
FT
. R
IC
HA
RD
SO
N A
VE
FT
. S
TO
CK
TO
N A
VE
NU
E
FL
IG
HT
LIN
E A
VE
NU
E
PERIMETER ROAD S
FT
. P
HA
NT
OM
H
ILL
AV
EN
UE
POLLARD STREET
CL
IN
IC
D
RI
VE
MARAUDER WALK
MATHIS STREET
PERIMETER ROAD SE
CARSWELL STREET
MARAUDER TROOPWALK
NUCHOLS STREET
PERIMETER ROAD N
GRIFFIN STREET
GOODFELLOW DRIVE
TEXAN STREET
MITCHELL STREET
VALIANT STREET E.
CARSWELL ALLEY
MATHIS ALLEY
FT
. L
AN
CA
ST
ER
AV
EN
UE
VANCE CIRCLE
FT
. G
RI
FF
IN
AV
EN
UE
LODGE ACCESS
FT CONCHO DRIVE
PE
RI
ME
TE
R
RO
AD
W
E NORTH PATROL ROAD
PE
RI
ME
TE
R
RO
AD
E
PB3530DPB3530E
512504
525 3420
3424 3405
1030 10281026
10271029
1034 1032
258 243
240 238
135 116
241 242
607 608606
603 602
709 701
705 707
612 610
625624623
259742
San Angelo
£¤277
£¤87
£¤67
Ballfield
SF
BBC
BBC
BBC
BBC
TC
WINCHESTER DRIVE
BR
ON
CO
WA
Y
MAVERICK ROAD
DERRINGER DRIVE
LONGHORN DRIVE
C OW
BOY WAY
AR
AP
AH
OE
TR
AI
L
35123717
3401 3407
35113716 3713 3514
34123402
37113710
36023601 3646 36063617
3642 3605
3634 3618
32013109
3104 3106
34483450
3404 3506
31133111
3104 3115
31073103
3102 3108 3112
Rec Cam p
Sw im m ing
Po o l
VBC
TC
BBC
Lake Nasworthy
57005
57024 57011
57006
57007
57008
RECREATION CAMP AREA
Legend S To wer_ P
Offbase Ro ads ! ! ! ! ! Fence
Buildings Carpo rts + Pavilio ns Pavem ent Branch Playgro und Ath letic Co urt Ath letic Field Sw im m ing Po o l Interm ittent Water
RIO CONCHO HOUSING AREA
Lo cal Area
Goodfellow
AFB
Goodfellow Rec Camp
17 CES/CENME, GeoBase Building 3511, Room 124
654-1192/1282
Map Date: August 2020
0 200 400100 Meters
0 500 1,000 1,500250 Feet
Parking Area
RV Sites
1591846821C Oval
1591846821C Callout Building 140
1591846821C Text Box
TE - 1
LAUNDRY
MECH. ROOM
BOILER
LOBBY
STORAGE
JANITOR
MEN WOMEN
L O
C K
E R
S
SAUNA
MEN'S LOCKER ROOM
TOILET
OFFICE
ISSUE
CONFERENCE/
RACQUETBALL
AEROBICS ROOM
GYMNASIUM
STRETCHING ROOM
L O
C K
E R
S
S H
O W
E R
S
ELECT. RM
OFFICE
3 2
SPINNING ROOM
FMO
STORAGE
CONFERENCE
TRICARE MECH.
RECYCLE
LOBBY
HOUSING
STORAGE
STORAGE
RECEP.
ADL'S
TOILET
SECURE
SERVER/COPIER
AREA
COMPUTER LAB/
LIBRARY
EXCER.
RACQUETBALL
COURT COURT
DAY CARE
ROOM
C O
R R
I D
O R
C O
R R
I D
O R
COMM.
MAINTENANCE
OFFICE
OFFICE
STORE.
OFFICE
CORRIDOR
ELEC.
MECH.
WOMEN'S TOILET ROOM
WOMEN'S LOCKER ROOM
SAUNA
WOMEN'S SHOWERS
MEN'S LOCKER ROOM
MULTI-PURPOSE ROOM
CORRIDOR
113 114
OFFICE
CORRIDOR
REFERRAL
REFERRAL
STORAGE
ELEMENT CHIEF
DORM CHIEF
PRIVATIZED
KEYS/
HOUSING
PRIVATIZED
KITCHEN
BUILDING 140
1st Floor Plan
17 Civil Engineer Squadron
Goodfellow AFB
AutoCAD SHX Text Drawn By
AutoCAD SHX Text Date
AutoCAD SHX Text Scale
AutoCAD SHX Text Revision/Issue
AutoCAD SHX Text No.
AutoCAD SHX Text Date
AutoCAD SHX Text General Notes/Symbols/Legend
AutoCAD SHX Text Geobase: 654-1192/654-1282
AutoCAD SHX Text North Arrow
AutoCAD SHX Text 01/17/2018
AutoCAD SHX Text 1/64" = 1' - 0"
AutoCAD SHX Text SSgt Letson, Kara Sohn
1591846821C Callout Interior Condition:
Slab shows signs of settling. (Approx. 1" - 2" x Approx 170'+/- lf)
1591846821C Polygon
1591846821C Typewritten Text A
1591846821C Typewritten Text B
1591846821C Typewritten Text C
1591846821C Typewritten Text E & F
1591846821C Line
1591846821C Line
1591846821C Line
1591846821C Line
1591846821C Text Box A. Dbl. Doors in rm. 113
1591846821C Text Box B. Column in rm. 113
1591846821C Text Box C. Doorway between rms. 113 & 114
1591846821C Text Box E,F. Along North wall in rm. 114
1591846821C Typewritten Text D
1591846821C Line
1591846821C Text Box D. Dbl. Doors in rm. 114
1591846821C
TE - 2
ENLARGED As Built B140 - A1.1 Floor Plan
1591846821C Polygon
1591846821C
TE - 3
Highlight
1591846821C Highlight
1591846821C Highlight
1591846821C Highlight
1591846821C Highlight
1591846821C Highlight
1591846821C Highlight
1591846821C Text Box ENLARGED As Builts B140 - A5 - Arch. Details_Wall Sections
1591846821C
TE - 4
1591846821C Highlight
1591846821C Highlight
1591846821C Highlight
1591846821C Highlight
1591846821C Text Box ENLARGED As Built B140 - S1 - Foundation Plan
1591846821C
TE - 5
1591846821C Highlight
1591846821C Polygon
1591846821C Text Box ENLARGED As Built B140 - S2 - Foundation Details
1591846821C Callout Slabs not doweled into grade beam
1591846821C Text Box
TE - 6
1591846821C Callout Approx. 30" dp. GB
Elev = 0
-0.4''
-0.8''
-0.6''
-0.6''
-0.5''
-0.1''
-0.1''
-0.2''
-0.13''
-0.13''
-0.12''
-0.45''
-0.86''
-0.97''
-0.96''
-0.73''
-0.53''
-0.54''
-0.48''
-0.45''
-0.33''-0.35''
-0.22''
-0.34''
-0.46''
-0.67''
-0.67''
-0.58''
-0.67''
-0.92''
-0.24''
-0.17''
-0.12''
-0.18''
-0.47''
-0.72''
-0.61''
-0.51''
-0.35''
-0.25''
-0.17''
-0.34''
-0.14''
-0.19''
-0.13''
-0.23''
-0.15''
-0.12''
-0.24''
-0.26''
-0.54''
-0.59''
-0.39''
-0.25''
-0.25''-0.22''
-0.29''
-0.36''
-0.47''
-0.46''
-0.28''-0.13''
-0.27''
-0.25''
-0.23''
-0.12''
-0.21''
-0.17''
-0.29''
-0.51''
BLDG 140 - RM 113
FLOOR ELEVATION SURVEY
¯*FLOOR PLAN SHOWN FOR APPROXIMATE REPRESENTATION PURPOSES ONLY
Elevation Change -0.50" or more
-0.25" - -0.49"
-0.10" - -0.24"
-0.10" or less
1591846821C
TE - 7
Elev = 0 -0.4''
-0.4''
-0.5''
-0.17''
-0.26''
-0.16''
-0.12'' -0.14''
-0.12''
-0.12''
-0.11''
-0.15''
-0.35''
-0.44''
-0.41''
-0.44''
-0.62''
-0.53''-0.25''-0.18''
-0.14'' -0.19'' -0.53'' -0.61''
-0.66''
-0.55''
-0.51''
-0.49''
-0.45''
-0.36''
-0.39''
-0.53''
-0.39''
-0.47''-0.41''
-0.34''
-0.48''
-0.25''
-0.27''
-0.14''
BLDG 140 - RM 114
FLOOR ELEVATION SURVEY
¯*FLOOR PLAN SHOWN FOR APPROXIMATE REPRESENTATION PURPOSES ONLY
Elevation Change -0.50" or more
-0.25" - -0.49"
-0.10" - -0.24"
-0.10" or less
1591846821C
TE - 8
August 2021 21-E-0298
SKG ENGINEERING, LLC
Geotechnical Report
Goodfellow Air Force Base
Building #140
Goodfellow Air Force Base, Texas
PREPARED FOR:
Mr. Zachary T. Stone Goodfellow Air Force Base 210 Scherz Boulevard Good Fellow Air Force Base, Texas 76908
8/10/2021 SKG Engineering, LLC
F-7608
1591846821C
TE-9
August 10, 2021 21-E-0298
Mr. Zachary T. Stone Goodfellow Air Force Base 210 Scherz Boulevard Goodfellow Air Force Base, Texas
Subject: Geotechnical Report, Goodfellow Air Force Base, Building #140, Goodfellow Air Force Base, Texas
Mr. Stone, In accordance with your authorization, SKG Engineering has completed its geotechnical investigation at the referenced site. The work was done in accordance with the proposal dated February 26, 2021. The data and results are included in the attached report.
If you have any questions or comments, or if we can be of any more service to you, please do not hesitate to contact us at (325) 655-1288.
Sincerely, SKG Engineering, LLC
Caleb Miller, E.I.T. Jason Clinton, P.E.
SKG Engineering, LLC
F-7608
Attachments - Geotechnical Report
CC: File
N:\Engineering\2021\21E0298 GAFB_Bldng 140\Geotech\Geotechnical Report.doc
Table of Contents
1.0 Introduction
1.1 Overview
2.0 Exploration
2.1 Soil Borings
2.2 Laboratory Tests
3.0 Subsurface Investigation
3.1 Site Geology
3.2 Subsurface Materials and Conditions
3.3 Subsurface Water
4.0 Site and Design Considerations
4.1 Basic Considerations
4.2 Subsurface Moisture
4.3 Shrink/Swell Considerations
4.4 Foundation System
4.4.1 Allowable Bearing Capacities
4.4.2 Potential Causes of Differential Settlement
4.4.3 Potential Foundation Repair Options
5.0 Material Specifications and Testing
5.1 Engineered Fill
5.2 Flexible Base Material
5.3 Testing
6.0 Limitations
Attachments
A – Field Conditions B – Sample Location Map C – Logs of Boreholes D – Laboratory Results E – Building Foundation Plans/Details (Provided to SKG)
Line
Building #140 August 2021 Goodfellow Air Force Base, Texas 21-E-0298
SKG Engineering, LLC 1 Geotechnical Report
1.0 Introduction
1.1 Overview
Reportedly, the referenced building has experienced noticeable shifting of the foundation since construction. Final elevations of the foundation system after completed construction are unknown.
Differential leveling in the areas of concern (provided to SKG Engineering by Goodfellow personnel) indicate the problem areas have settled up to approximately 1” below the floor level of the surrounding area. Structural plans and foundation details provided to SKG indicate the building is supported on a structural foundation system utilizing piers, with a floating slab which is not anchored to the exterior grade beam. A specific thickness for the slab was not shown on the plans provided. However, approximate scaling of the details shown indicate the plans called for an estimated slab thickness of 5.5” – 6.0”. The plans call for a vapor barrier beneath the concrete slab, followed by a 6” capillary water barrier and a minimum 24” of non-expansive fill. A copy of the plans/details given to SKG and which provide the stated information is included in Attachment E.
The purpose of this exploration was to determine subsurface materials and conditions and to establish the characteristics of these materials in order to define the existing parameters and discuss potential foundation repair options. Additionally, the existing foundation was also investigated at the site by means of foundation cores and samples of the construction base material. Refer to the foundation coring report, SKG project number 21-E-0298, dated August 10, 2021 for a further evaluation of the existing foundation system. A summary of field conditions is included in Attachment A.
2.0 Exploration
2.1 Soil Borings
The subsurface explorations were conducted on this site in July 2021. The boreholes were drilled to a maximum depth of 20', and the logs of these boreholes are included in this report. The drilling was performed with a truck mounted air rotary drill rig. The drilling activities were performed in accordance with accepted methods and procedures. The boreholes were conducted as near to the perimeter of the building as access would permit. A location map showing the approximate borehole locations is included in Attachment B.
Material samples were recovered at various depths for testing. The primary means of extracting subsurface soil samples was by the use of a 3" Shelby-tube and/or a 2" O.D. split barrel sampler. Split spoon sampling procedures were performed in accordance with ASTM D 1586 and Shelby tube samples were obtained in accordance with ASTM D 1587. The samples were extruded or removed in the field and placed in moisture tight bags and labeled. The samples were then transported to the laboratory for testing and visual evaluation by geotechnical personnel. The Unified Soil Classification System was utilized in accordance with ASTM D 2487 to verify field classifications. Refer to the logs of borings located in Attachment C for lithology, sample locations and quantities.
2.2 Laboratory Tests
Tests were performed to determine engineering characteristics of the subsurface materials encountered including, but not limited to, soil moisture content (ASTM D 2216), Atterberg Limits (ASTM D 4318) and sieve analysis. The test results can be found in Attachment D. Samples not tested in the laboratory will be retained for a maximum of 60 days and then discarded unless otherwise notified in writing prior to disposal of the samples.
SKG Engineering, LLC 2 Geotechnical Report
3.0 Subsurface Investigation
3.1 Site Geology
Based on the location of the site on geological maps, it is our opinion that the predominate soil is the Angelo-Urban Land Complex, (AuB). These particular soils are indicative of nearly level to gently sloping topography on smooth outwashed plains. These soils are well drained and have medium surface runoff. Shrink-swell potential and soil corrosivity to uncoated steel are moderate. Based on the location of the site and soil conditions we do not foresee any adverse issues related to elevated sulfate concentrations.
3.2 Subsurface Materials and Conditions
The specific subsurface stratum encountered in each borehole is described in the logs of boreholes included in Attachment C. The strata encountered at the boreholes conducted at the site can be divided into two major strata. The first stratum is a layer of lean clay that extends from a depth of 0' to 11'. The second soil stratum consists of fat clay extending from a depth of 11' to the depth of the boreholes.
The subsurface stratum varies from those stated above as follows:
B2 – Gravelly lean clay encountered from a depth of 2 feet to a depth of 5 feet;
For comparison to the specifications shown on the plans given to SKG, a detailed listing of the existing materials and conditions found beneath the slab is provided in the foundation coring report, SKG project number 21-E-0298, dated August 10, 2021.
3.3 Subsurface Water
There was no groundwater noted in any of the boreholes at the time of the investigation. The absence of groundwater noted does not express or imply a groundwater study was performed, which is beyond the scope of this report. It should be noted that groundwater levels are subject to change based on seasonal and climatic conditions.
4.0 Site and Design Considerations
4.1 Basic Considerations
The site is currently developed with the existing structure, subsurface utilities, flatwork, and landscaping.
Any foundation repairs performed in the area should take note of the existing developments during the design phase of the project in order to minimize damages.
Our understanding is the building is currently supported on a structural foundation system utilizing piers and that (at least in the areas of concern) the slab is floating and un-anchored to the perimeter grade beam. A complete foundation design and details concerning the bearing depth of the piers utilized was not provided.
Clay soils with moderate to high plasticity index (PI) values were encountered at the site at depths ranging from 0’ – 3’, and from 11’ to the depth of the borehole. These soils are a major contribution to the potential for vertical movement (PVR) at the site. PVR is further discussed in section 4.3 of this report. Movement generated by higher plasticity soils encountered at moderate to large depths are more difficult to accommodate with structures already present.
4.2 Subsurface Moisture
Water, in the form of a liquid, can rise upward through subsurface soils by capillary action, absorption or gravitational pull well above the water table. Water changes from a liquid to a vapor as it evaporates.
SKG Engineering, LLC 3 Geotechnical Report
Water vapor will move from areas of high vapor pressure to a lower vapor pressure through diffusion.
Diffusion is how water vapor distributes itself above the water table and occurs in both soils and concrete.
It is generally recognized that the relative humidity in the soils below a foundation will be close to 100%.
Such a high relative humidity is reached even when the moisture content in the material below the foundation is found to be low. Without a capillary break or vapor barrier below the foundation, a high relative humidity or water source below a foundation can contribute moisture to the concrete. This can cause soluble alkalis in the concrete to enter into solution thus raising the pH. Moisture induced pH levels in concrete can be on the range of 10 to 12 while normal cured levels can be on the range of 7 to 9.
The impact of subsurface moisture can be reduced by the use of a vapor barrier or capillary break. A vapor barrier below the foundation is recommended when floor coverings or adhesives are sensitive to moisture or alkaline conditions. A vapor barrier can be in the form of poly vinyl sheets and a capillary break can be a sand or granular base. Verification of the vapor emission limitations from the foundation is vital to the selection of the proper vapor barrier system.
4.3 Shrink/Swell Considerations
Shrink/swell movements of the in-situ soils with changes in the soil moisture content are anticipated to be medium at the site. The Potential Vertical Rise (PVR) was calculated to be on the order of 1-1/2" using the McDowell PVR Method. The PVR was approximated using the McDowell’s initial dry soil condition and a potential active zone to fifteen feet below grade. No information was provided as to whether soil modification was performed at this site during the original construction process. The intent of this section is to provide for a soil removal and replacement for the depths noted below which SKG Engineering would provide for new construction based on the encountered soil conditions.
The PVR can be reduced to be on the order of 1" by providing a 3' layer of engineered fill below the foundation. The PVR can be reduced to be on the order of ¾” by providing a 7' layer of engineered fill below the foundation. The PVR can be reduced to be on the order of ½" by providing a 12' layer of engineered fill below the foundation. When engineered fill is utilized to reduce the PVR, the continuous footings must bear at the same depth as the depth of the engineered fill or engineered fill should be placed below the grade beam to accomplish the required depth. Refer to the Engineered Fill section for placement and specifications.
The PVR and moreover foundation movement is effected by many factors that influence its magnitude and rate of change. Factors include: seasonal variations in the moisture content between the interior and perimeter of the foundation, topographic relief, vegetative cover, confining pressures, fluctuating and shallow water tables, and the composition of underlying soils. In-situ clays can expand with the introduction of moisture and shrink with decreases in moisture.
4.4 Foundation System
This section provides bearing capacities of the site soils and discusses potential causes of the differential settlement, and possible options for repair of the existing foundation. The bearing capacities provided are based on SKG’s evaluation of the soils encountered, and may vary from the values utilized when the foundation was designed. The bearing capacities are given for use in providing a general understanding of the site soil stiffness, for consideration of repair options.
4.4.1 Allowable Bearing Capacities
The allowable bearing pressure exerted by grade beams or spread footings on the in-situ soils from a depth of 1' to 2' is 2,000 psf and from a depth of 2' to 4' is 2,900 psf. The value of 125 pci for subgrade modulus may be used for design purposes. The value of 28 degrees may be utilized for the internal friction angle of the clayey soils for design purposes. The value of 0.35 for the ultimate lateral sliding
SKG Engineering, LLC 4 Geotechnical Report resistance coefficient may be utilized for design in regard to the foundation on an engineered fill. The allowable bearing pressure exerted by grade beams bearing into an engineered fill, placed in accordance with the specifications in the Site Preparation section of this report, is 3,500 psf.
Belled piers can be used for foundation support where column loads are less than 85 kips. The piers should bear a minimum of 16' up to 18’ below existing grade, bearing into the firm clay. The piers should be located below the active zone and founded on a firm, stable stratum. We recommend foregoing utilizing side shear resistance for the allowable bearing capacity of the piers between 0 and 10 feet of depth. The piers can be designed with an allowable side shear resistance of 450 psf for the portion of shaft extending from a depth of 10’ to the depth of the borehole, in addition to the allowable end bearing pressure stated below. An allowable side shear resistance of 350 psf for the portion of shaft extending from a depth of 10’ to the depth of the borehole may be utilized for uplift resistance. The allowable lateral bearing of the piers on the clayey soils may be taken as 150 psf/f. Field adjustments to some shaft depths may be required due to the variation in the site elevations and varied soils encountered. The allowable end bearing pressure exerted by the piers on the soils 16' to 18' below existing grade is 7,300 psf.
4.4.2 Potential Causes of Differential Settlement
The exact cause for the differential settlement of the slab could not be ascertained. Based on observation of the settlement and damage noted, it appears only the floating slab has settled, and that the piers have remained in place, creating a differential settlement of approximately 1”. Some potential contributors to the settlement may include the following:
Shrinkage of in-situ clay soils beneath the foundation due to changes in moisture content, or any of the other reasons discussed in Section 4.3.
Consolidation of the granular fill (specified as a 6” capillary water barrier and minimum 24” nonexpansive fill) placed beneath the vapor barrier.
It is noted in the coring report performed for the site that the capillary water barrier encountered appeared to be approximately 12” in depth, and comprised primarily of larger sized aggregate. It is possible that the gradation of material resulted in a capillary barrier layer which, though compacted, still retained substantial voids within the soil matrix. If this scenario occurred, it is also possible the capillary barrier has experienced consolidation over time, contributing to the differential settlement. Note that even if this is a contributing factor, SKG does not believe it likely for the entirety of the settlement noted to have occurred across such a small layer.
It is also noted in the coring report that the fill material used to bring the floor to the desired grade (specified as a minimum 24” layer) had moderate plasticity index (PI) values (on the range of 15 – 29).
SKG’s typical specifications for engineered fill material call for a PI value between 6 and 14. If a full 24” or greater depth of fill material was utilized with higher PI values, it is possible that over time the changes in moisture content within the fill layer could contribute to consolidation leading to differential settlement. Again, not knowing the full depth of the fill layer placed during construction makes it difficult to determine the amount of settlement which could be caused by this scenario. However, it is unlikely to be a sole contributor.
4.4.3 Potential Foundation Repair Options
Standard methods for repairing foundations include the following:
Steel Pressed Pilings Concrete Piers Helical Piers
SKG Engineering, LLC 5 Geotechnical Report
Slabjacking High-Density Polyurethane Foam Injection
Since it appears the structural piers have remained in place, with the differential settlement occurring only across the floating slab, we believe the existing condition of the slab/foundation may be improved by use of a high-density polyurethane foam injection. This is typically performed by drilling holes through the existing slab and injecting a high-density foam which fills in voids beneath the slab and raises the slab. It should be noted that if a portion of the settlement observed has been caused by a decrease in moisture conditions of either the in-situ or engineered fill soils, then it is possible that an increase in those moisture conditions could have a reverse effect, causing the slab to raise above the improved elevation.
Careful attention should be paid to the routing of stormwater drainage and runoff within the area to ensure water is not permitted to pond on the site.
5.0 Material Specifications and Testing
The material specifications and testing requirements in this section are provided as a comparative reference, and to demonstrate SKG’s typical specifications in these areas.
5.1 Engineered Fill
An approved select fill shall be used to bring the foundation system to grade. It shall be a non-granular, cohesive soil, free of deleterious material, have a liquid limit of less than 40, and a plasticity index between 6 and 14. The select fill shall meet the following percent retained on sieve requirements: 2-1/2":
0-5%, No. 4: 40-80%, and No. 40: 50-85% or obtain approval from the geotechnical engineer. The fill should be installed in maximum eight-inch loose lifts and compacted to at least 95% of the Standard Proctor Density within 3% points of the optimum moisture content. Base consisting of TxDOT Type A, Grade 2 limestone will be accepted as engineered fill. Blended materials utilized for engineered fill will have to meet the specifications herein and be approved by the geotechnical engineer. If a blended material is approved, the contractor shall blend the material and have one stockpile for the entire project.
Continuous blending of material throughout the duration of the project is not acceptable.
5.2 Flexible Base Material
Provide compacted base consisting of Type A, Grade 2, limestone material below the foundation.
Compact to 96% of the Standard Proctor Density within 2% points of the optimum moisture content.
Material shall be placed in lifts not to exceed 8". Alternative flexible base materials provided by a local supplier which do not meet theses specifications shall be approved by the Engineer of record.
5.3 Testing
Test results of the engineered fill shall be submitted to the engineer of record for approval prior to incorporating into the work. Arrange for a testing agency to verify flexible base, engineered fill, and subgrade compaction and moisture content. To confirm the compaction of the subgrade, engineered fill, and base we recommend the more stringent of three density tests for each lift placed or one density test for every 2,000 square feet of foundation area for each lift placed. The Standard Proctor Density shall be determined in accordance with ASTM D698.
6.0 Limitations
The recommendations presented in this report are based upon the information obtained from the borings performed at the site and from other information discussed in this report. This report is based upon the findings from the borings made and may not identify all subsurface variations which exist across the site.
The nature and extent of such variations may not become evident until construction. If significant variations appear, contact SKG Engineering to further access the design criteria and the recommendations contained within this report.
SKG Engineering, LLC 6 Geotechnical Report
The scope of services for this project does not include either specifically or by implication any environmental assessment of the site or identification of contaminated or hazardous materials or conditions. If the owner is concerned about the potential for such conditions, the appropriate investigations should be performed.
No warranties, either expressed or implied, are intended or made. In the event that changes in the nature, design, or location of the project as outlined in this report are made, the recommendations contained in this report shall not be considered valid unless SKG Engineering reviews the changes and either verifies or modifies the conclusions of this report in writing.
Attachment A
Field Conditions
Summary of Field Conditions
The following field conditions were observed during the field exploration activities.
1. The site is developed with the existing structure, subsurface utilities, flatwork, and landscaping.
The accessibility of some types of equipment should be verified in some of the areas of the site where heavy development is present, and due diligence should be performed to avoid disturbing subsurface utilities.
2. The surface soil conditions on the site are generally clay that is considered a soft soil material. The soil conditions will probably prove to hinder mobilization of some types of construction equipment during rain events that saturate the soils.
3. Groundwater was not present at the time of drilling activities in any of the boreholes.
4. No rock was encountered in any of the boreholes conducted at the site.
Attachment B
Borehole Location Map
Attachment C
Logs of Boreholes
SAMPLER TYPE
UNIFIED SOIL CLASSIFICATION SYSTEM u u\GRAPHIC
SYMBOL
LETTER
SYMBOLMAJOR DIVISION TYPICAL DESCRIPTIONS
°o «°9 0 O
CLEAN
GRAVELS
WELL GRADED GRAVELS, GRAVEL-SAND MIXTURES,
LITTLE OR NO FINES.GWGRAVEL AND
GRAVELLY
SOILS
TXDOT
SAMPLE CONE
NO SHELBY
TUBE RECOVERY
NO ROCK
CORE
SPLIT
SPOON
WATER TABLE AT
TIME OF DRILLING
BAG
SAMPLE
(LITTLE OR NO
FINES)
POORLY GRADED GRAVELS OR GRAVEL-SAND
MIXTURES, LITTLE OR NO FINES. W WATER LEVEL AT
= END OF DRILLING
GP VCOURSE
GRAINED
SOILS
GRAVELS
WITH FINES
(APPRECIABLE
AMOUNT OF
FINES)
MORE THAN 50%
OF COARSE
FRACTION
RETAINED ON
NO. 4 SIEVE
DESCRIPTIONSILTY GRAVELS, GRAVEL-SAND-SILT MIXTURES. SOIL TERMSGM
CONTAINS CRACKS OR FAILURE PLANES RESULTING IN ROUGH
CUBES OF MATERIAL.BLOCKY
GC CLAYEY GRAVELS, GRAVEL-SAND-SILT MIXTURES.
CONTAINS APPRECIABLE QUANTITIES OF CALCIUM CARBONATE.CALCAREOUS
CONTAINS SHRINKAGE CRACKS, WHICH ARE FREQUENTLY FILLED
WITH FINE SAND OR SILT. THE FISSURES ARE USUALLY NEAR
VERTICAL IN ORIENTATION.
WELL GRADED SANDS, GRAVELLY SANDS, LITTLE OR
NO FINES.SILTS sw FISSUREDCLEAN SAND
AND
tig(LITTLE OR NO
FINES)
POORLY GRADED SANDS OR GRAVELLY SANDS, LITTLE
OR NO FINES.CLAYS INTERBEDDED COMPOSED OF ALTERNATING LAYERS OF DIFFERENT SOIL TYPES.SPMORE THAN 50%
OF MATERIAL IS
LARGER THAN NO.
200 SIEVE SIZE.
COMPOSED OF THIN LAYERS OF VARYING COLOR AND TEXTURE.LAMINATEDSANDS WITH
FINES
(APPRECIABLE
AMOUNT OF
FINES)
MORE THAN 50%
OF COARSE
FRACTION
PASSING
NO. 4 SIEVE
^ SECONDARY INCLUSIONS THAT APPEAR AS SMALL LUMPS ABOUT
0.1 TO 0.3 INCH IN DIAMETER.
r SM SILTY SANDS, SAND-SILT MIXTURES.m NODULES mfa INCLUSION OF DIFFERENT MATERIAL LESS THAN % INCH THICK
EXTENDING THROUGH THE SAMPLE.PARTINGSSC CLAYEY SANDS, SAND-CLAY MIXTURES.
yy INCLUSION OF DIFFERENT MATERIAL THAT IS SMALLER THAN THE
DIAMETER OF THE SAMPLE.POCKETSINORGANIC SILTS AND VERY FINE SANDS, FINE
SANDS, ROCK FLOUR, SILTY OR CLAYEY FINE SANDS
OR CLAYEY SILTS AND WITH SLIGHT PLASTICITY.ML
INCLUSION OF DIFFERENT MATERIAL BETWEEN ^ AND 3 INCHES
THICK, AND EXTENDS THROUGH THE SAMPLE.SEAMSSILTS INORGANIC CLAYS OF LOW TO MEDIUM PLASTICITY, GRAVELLY CLAYS, SANDY CLAYS, SILTY CLAYS, LEAN CLAYS.
LIQUID LIMIT
LESS THAN 50.
FINE
GRAINED
SOILS
CL HAS INCLINED PLANES OF WEAKNESS THAT ARE SLICK AND
GLOSSY IN APPEARANCE. SLICKENSIDES ARE COMMONLY
THOUGHT TO BE RANDOMLY ORIENTED.
AND
SLICKENSIDEDXCLAYS ORGANIC SILTS AND ORGANIC SILTY CLAYS OF LOW
PLASTICITY.OL STREAKS OR
STAINS
STAINS OF LIMITED EXTENT THAT APPEAR AS SHORT STRIPES,
SPOTS OR BLOTCHES.
INORGANIC SILTS, MICACEOUS OR DIATOMACEOUS
FINE SAND OR SILTY SOILS.MH ROCK TERMSSILTS LIQUID LIMIT
GREATER THAN 50.
MORE THAN 50%
OF MATERIAL IS
SMALLER THAN NO
200 SIEVE SIZE.
A SURFACE PARALLEL TO THE SURFACE OF DEPOSITION,
GENERALLY MARKED BY CHANGES IN COLOR OR GRAIN SIZE.AND INORGANIC CLAYS OF HIGH PLASTICITY, FAT CLAYS.CH BEDDING PLANE2CLAYS
A NATURAL BREAK IN ROCK ALONG WHICH NO DISPLACEMENT
HAS OCCURED.ORGANIC CLAYS OF MEDIUM TO HIGH PLASTICITY,
ORGANIC SILTS. FRACTUREOH
A NATURAL BREAK ALONG WHICH NO DISPLACEMENT HAS
OCCURED, WHICH GENERALLY INTERSECTS PRIMARY SURFACES.JOINT
PEAT, HUMUS, SWAMP SOILS WITH HIGH ORGANIC
CONTENTS.HIGHLY ORGANIC SOILS PT THE RATIO OF TOTAL LENGTH OF RECOVERY TO THE TOTAL
LENGTH OF CORE RUN, EXPRESSED AS A PERCENTAGE.% RECOVERY
ROD - ROCK
QUALITY
DESIGNATION
CONSISTENCY OF COHESIVE SOILSMOISTURE CONTENT THE RATIO OF TOTAL RECOVERED LENGTH OF FRAGMENTS
LONGER THAN 4 INCHES TO THE TOTAL RUN LENGTH,
EXPRESSED AS A PERCENTAGE.POCKET PENETROMETER
READING IN TONS/FT2
N-VALUE
(BLOWS/FOOT)
ABSENCE OF MOISTURE, DUSTY,
DRY TO THE TOUCH. CONSISTENCYDRY
THE PROCESS BY WHICH ROCK IS BROKEN DOWN AND
DECOMPOSED.
WEATHERINGVERY SOFT 0 TO 0.25 <2SOME PERCEPTIBLE MOISTURE;
BELOW OPTIMUM.DAMP SOFT 0.25 TO 0.5 2 TO 4
FIRM 0.5 TO 1.0 4 TO 8NO VISIBLE WATER; NEAR OPTIMUM
MOISTURE CONTENT.MOIST KEY
TO SYMBOLS AND TERMS
STIFF 1.0 TO 2.0 8 TO 15
VERY STIFF 2.0 TO 4.0 15 TO 30VISIBLE FREE WATER, USUALLY
SOIL IS BELOW WATER TABLE.WET >4.0 OR 4.5+ >30HARD
RELATIVE DENSITY-GRANULAR SOILSSAND GRAVELCLAY N-VALUE (BLOWS/FOOT)SILT CONSISTENCYCOBBLES BOULDERS
FINE MEDIUM COARSE FINE COARSE VERY LOOSE 0 TO 4
0.005mm No.200 No.40 No.10 No.4 %” 3”
U.S. STANDARD SIEVE SIZE
REFERENCE: THE UNIFIED SOIL CLASSIFICATION SYSTEM, CORPS OF ENGINEERS, U.S. ARMY
TECHNICAL MEMORANDUM NO. 3-357, VOL. 1 MARCH, 1953 (REVISED APRIL, 1960)
12” LOOSE 5 TO 10
MEDIUM DENSE 11 TO 30
DENSE 31 TO 50 ENGINEERING
VERY DENSE >50 OR 50+
COARSE
lean CLAY (CL); brown, with sand sandy lean CLAY (CL); brown fat CLAY (CH); tan
Boring completed at a depth of 20'. Groundwater was not present at the time of drilling activities.
4/6/11 9.4 24
10/9/9
6/9/12 9.8 16
GRAB
11/13/16
11/33/31 11.1 29
17/40/42
G W
T n o t e n c o u n te re d
SKG Engineering, LLC
S u p e rL o g
C iv il T e c h
S o ft w a re
U
S A w w
.c iv il te c h
.c o m
F il e
N
E n g in e e ri n g
\2 \2
E
G
A F
B B ld n g
\G e o te c h
\F in a l
B o re h o le l o g s .l g
D a te
/9
/2
Goodfellow Air Force Base - Bldg. #140 San Angelo, Texas
21-E-0298
B-1
Boring Location: Refer to the borehole location map
Date Started: July 9, 2021
Drilling Method: Air rotary
Hammer Weight: 140 lbs
Sampler: Shelby tube/2" split barrel sampler
Date Finished: July 9, 2021
Drop: 30 inches
Surface Elevation:
Depth (feet)
Lith-ology Material Description
Samples
N u m b e r
T y p e
SPT
Laboratory
W% PI
Project:
Plate A-
Pent.
(tsf) lean CLAY (CL); brown gravelly lean CLAY (CL); brown lean CLAY (CL); light brown fat CLAY (CH); tan
Boring completed at a depth of 20'. Groundwater was not present at the time of drilling activities.
2.5
9.3 23 3.0
4.5+
GRAB
5/7/7 11.7 16
16/27/38
18/37/44 10.2 35
G W
T n o t e n c o u n te re d
SKG Engineering, LLC
S u p e rL o g
C iv il T e c h
S o ft w a re
U w
.c iv il te c h
.c e
N
E n g in e e ri n g
\2 \2
E
G
A F
B B ld n g
\G e o te c h
\F in a l
B o re h o le l o g s .l te
/9
/2
Goodfellow Air Force Base - Bldg. #140 San Angelo, Texas
21-E-0298
B-2
Boring Location: Refer to the borehole location map
Date Started: July 9, 2021
Drilling Method: Air rotary
Hammer Weight: 140 lbs
Sampler: Shelby tube/2" split barrel sampler
Date Finished: July 9, 2021
Drop: 30 inches
Surface Elevation:
Depth (feet)
Lith-ology Material Description
Samples
N u m b e r
T y p e
SPT
Laboratory
W% PI
Project:
Plate A-
Pent.
(tsf) lean CLAY (CL); brown fat CLAY (CH); gray
Boring completed at a depth of 20'. Groundwater was not present at the time of drilling activities.
3/5/8 15.4 29
7/8/11
8/11/14
GRAB 9.0 18
7/6/8
13/27/30 15.9 57
50-3"
G W
T n o t e n c o u n te re d
SKG Engineering, LLC
S u p e rL o g
C iv il T e c h
S o ft w a re
U w
.c iv il te c h
.c e
N
E n g in e e ri n g
\2 \2
E
G
A F
B B ld n g
\G e o te c h
\F in a l
B o re h o le l o g s .l te
/9
/2
Goodfellow Air Force Base - Bldg. #140 San Angelo, Texas
21-E-0298
B-3
Boring Location: Refer to the borehole location map
Date Started: July 9, 2021
Drilling Method: Air rotary
Hammer Weight: 140 lbs
Sampler: Shelby tube/2" split barrel sampler
Date Finished: July 9, 2021
Drop: 30 inches
Surface Elevation:
Depth (feet)
Lith-ology Material Description
Samples
N u m b e r
T y p e
SPT
Laboratory
W% PI
Project:
Plate A-
Pent.
(tsf)
Attachment D
Laboratory Results
CLIENT:
PROJECT:
PROJECT #:
DATE:
0572 B1(2) 0' 1.5' 19 43 24 9.4 95.9 88.6 77.9 0573 B1(2) 3.5' 5' 14 30 16 9.8 93.9 73.0 62.1 0574 B1(2) 13.5' 15' 18 46 29 11.1 99.7 95.7 88.5 0575 B2 1.5' 3' 19 42 23 9.3 75.7 74.0 67.4 0576 B2 8.5' 10' 19 36 16 11.7 99.5 97.0 91.0 0577 B2 18.5' 20' 18 54 35 10.2 99.6 98.4 86.3 0578 B3 0' 1.5' 19 48 29 15.4 99.5 96.8 89.4 0579 B3 6' 7.5' 14 32 18 9.0 99.8 97.8 93.5 0580 B3 13.5' 15' 21 79 57 15.9 97.0 84.5 80.5
81.8
Stephanie Cheatheam Lab/CMT Manager
Pass # 200
Sieve (%)*
Average PL Average LL Average PI
Moisture
Pass # 4
Sieve (%)*
ANALYSIS RESULTS
Lab No. Description Plastic
Limit (%) *
Liquid
Limit (%)*
Plasticity
Index *
Building 140, GAFB 21-E-0298 7/15/2021
Zachary T. Stone, GS-09, DAF
Average % Clay
Pass # 40
Sieve (%)*
August 10, 2021 21-E-0298
Mr. Zachary T. Stone Goodfellow Air Force Base 210 Scherz Boulevard Goodfellow Air Force Base, Texas 76908
Subject: Foundation Coring Building 140 Goodfellow Air Force Base, Texas
Mr. Stone, Upon your request, SKG Engineering has performed coring of the foundation and sampling of the subsurface soils at the aforementioned location.
Purpose The purpose of the coring was to determine the thickness of the slab that is present and break the concrete cores to determine the compressive strength of the concrete. The purpose for sampling the subsurface soils was to perform testing for gradation and Atterberg limits to better define some of the engineering properties of the materials used for construction. This report is intended to provide these parameters and to be used in conjunction with the geotechnical report performed by SKG Engineering for this location. In an effort to make these determinations, the following was performed: two 6” diameter cores and two 4” diameter cores of the concrete slab were recovered with an electric, water-cooled core drill; the slab thickness, base thickness, if any were determined by visual observation and field measurements. Samples of the subsurface base material were collected using a hand auger to a depth of refusal for laboratory analyses. The slab survey provided to SKG by Goodfellow personnel was used to evaluate relative elevation differences.
Slab Properties A vapor barrier was present beneath the slab at all of the cored locations. The concrete core labeled C1 was 3.625 inches in diameter, with a length of approximately 6.25 inches and a tested compressive strength of 4,689 psi. The concrete core labeled C2 is 5.75 inches in diameter, with a length of approximately 6.5 inches and a tested compressive strength of 4,878 psi. The concrete core labeled C3 is 5.75 inches in diameter, with a length of approximately 6.5 inches and a tested compressive strength of 6,058 psi. The concrete core labeled C4 is 3.625 inches in diameter, with a length of approximately 6.5 inches and a tested compressive strength of 5,813 psi. Refer to Attachment A for core locations and Attachment B for compressive strength results.
Foundation Coring GAFB, Building #140
Soil Properties In general, a gravel capillary water barrier was encountered immediately beneath the vapor barrier, and appeared to be on the range of 10” – 12” thick. Soil samples were recovered with the hand auger to the refusal depths noted herein. Augering the base and soils beneath the slab was attempted with hand augers due to the restricting ceiling height for machinery inside the building. At C1 location, we augered to 18” below the slab until refusal and encountered tan gravel with clay fines. At C2 location, we augered to to 18” below the slab until refusal and encountered silty clayey gravel with sand. At C3 location, we augered to 18” below the slab until refusal and encountered silty clayey gravel with sand. At C4 location we augered to 22” below the slab until refusal, and encountered clayey sand with gravel. Refer to Attachment C for laboratory results of the soil samples Atterberg limits.
Gradation testing was performed on the soil and base samples collected from beneath the slab. It should be noted that samples of the base material were collected by hand through the core boring, and may not be fully representative across the gradation scale of the material used during construction. Refer to Attachment D for laboratory results of the soil samples gradation.
Conclusions Concrete Slab:
The slab parameters are provided herein for the project engineer’s use. We recommend to evaluate the slab as a 6.25” thick slab with a compressive strength of 4,500 psi. It could not be ascertained what reinforcement was present in the slab. Additional, invasive inspection would have to be done by the contractor to determine the reinforcement size and spacing.
Base Material & Subsurface Soils:
The samples collected were evaluated against the standard industry (within Texas) specifications for flexible base material, which can be found in TXDOT Item 247. A copy of the flexible base specifications is included in Attachment E. Laboratory testing of the samples recovered indicates the base material utilized does not meet TXDOT item specifications in either the gradation or plasticity index requirements.
This report serves to provide information regarding the existing conditions and associated measurements of the site elements. No design or recommendations are given or implied herein.
Also, we performed a geotechnical investigation of the site soils adjacent to this building. Refer to the geotechnical report, SKG project number 21-E-0298, dated August 10, 2021 for a further evaluation of site soil conditions.
Foundation Coring GAFB, Building #140
If you have any questions or comments, or if we can be of any further service to you, please do not hesitate to contact us at (325) 655-1288.
Sincerely, SKG Engineering
Jason Clinton, P.E.
SKG Engineering Firm #F-7608
CC: File
Attachments: Attachment A, Core Hole Location Map (1 page), Attachment B, Concrete Compressive Strength Results (1 page) Attachment C, Soil Results – Atterberg Limits (1 page) Attachment D, Soil Results – Gradation Testing (4 pages) Attachment E, TXDOT Item 247, Specifications for Flexible Base (2 pages)
N:\Engineering\2021\21E0298 GAFB_Bldng 140\Coring\Coring Report.doc
Client: 21E0298
Address:
Project: 7/6/2021
C1 3.625 x 5.4 0.96 50410 10.32 4689
C2 5.75 x 6.3 0.87 145500 25.95 4878
C3 5.75 x 6.5 0.87 180700 25.95 6058
C4 3.625 x 5.3 0.96 62490 10.32 5813
Report Date:
Note: This report is for the exclusive use of the client addressed.
This report may not be reproduced except in its entirety, without the written consent of SKG. Results apply only to above tests.
Sample Data
Core
Building 140, GAFB
CONCRETE CORE COMPRESSION TEST REPORT
GAFB - Zachary T. Stone
Correction Factor
Area
(sq. in.)
Strength (psi)
Project No.:
210 Scherz Blvd.
GAFB, Texas 769089
Max. Load (lbs.)
Size (in.)
CLIENT:
PROJECT:
PROJECT #:
DATE:
0540 C1 12'' 18'' 15 44 29 3.8 16.9 12.8 10.5 0541 C2 10'' 18'' 19 34 15 5.4 29.4 22.2 17.5 0542 C3 12'' 18'' 16 40 24 10.6 41.0 31.2 25.2
0543 C4 12'' 22'' 15 35 20 20.8 55.9 41.4 31.7
21.2
Stephanie Cheatheam Lab/CMT Manager
Pass # 200
Sieve (%)*
Moisture
Pass # 4
Sieve (%)*
Average % Clay
Pass # 40
Sieve (%)* Lab No. Description
Plastic
Limit (%) *
ANALYSIS RESULTS
Average PL Average LL Average PI
Zachary T. Stone, GS-09, DAF Building 140, GAFB
21-E-0298 7/2/2021
Liquid
Limit (%)*
Plasticity
Index *
Client / Project #: Lab #:
Sample Description: Tech:
Sample Mass (g):
Sieve Size Mass Retained
(g) % Retained
% Cumulative
(Previous Cumulative %
+ Current % Retained)
2 1/2" 0.0 0.0 0.0
2" 0.0 0.0 0.0
1 3/4" 0.0 0.0 0.0
1 1/2" 0.0 0.0 0.0
7/8" 116.0 11.4 11.4
3/4" 202.0 19.8 31.1
5/8" # 231.0 8 22.6 53.7
1/2" # 246.0 # 24.1 77.8
3/8" # 146.0 # 14.3 92.1
1/4" # 73.0 # 7.1 99.3
#4 # 1.1 # 0.1 99.4
#16 # 1.0 # 0.1 99.5
Remaining Soils # 5.0 # 0.5 100.0
21-0544
B. Cazares
1021.6
GAFB / 21E0298
Building 140
C1 0" - 12"
Sample Mass (g):
Sieve Size Mass Retained
(g) % Retained
% Cumulative
(Previous Cumulative %
+ Current % Retained)
2 1/2" 0.0 0.0 0.0
2" 0.0 0.0 0.0
1 3/4" 0.0 0.0 0.0
1 1/2" 0.0 0.0 0.0
7/8" 231.6 23.8 23.8
3/4" 196.4 20.2 44.0
5/8" # 163.7 6 16.8 60.8
1/2" # 176.2 # 18.1 78.9
3/8" # 129.6 # 13.3 92.2
1/4" # 70.6 # 7.2 99.4
#4 # 1.1 # 0.1 99.5
#16 # 1.4 # 0.1 99.7
Remaining Soils # 3.2 # 0.3 100.0
21-0545
B. Cazares
973.8
GAFB / 21E0298
C2 0" - 12"
Sample Mass (g):
Sieve Size Mass Retained
(g) % Retained
% Cumulative
(Previous Cumulative %
+ Current % Retained)
2 1/2" 0.0 0.0 0.0
2" 0.0 0.0 0.0
1 3/4" 0.0 0.0 0.0
1 1/2" 0.0 0.0 0.0
7/8" 140.9 21.1 21.1
3/4" 43.8 6.6 27.6
5/8" # 101.0 5 15.1 42.7
1/2" # 130.9 # 19.6 62.3
3/8" # 125.4 # 18.8 81.1
1/4" # 119.9 # 17.9 99.0
#4 # 2.7 # 0.4 99.4
#16 # 3.4 # 0.5 99.9
Remaining Soils # 0.8 # 0.1 100.0
21-0546
B. Cazares
668.5
GAFB / 21E0298
C3 0" - 12"
Sample Mass (g):
Sieve Size Mass Retained
(g) % Retained
% Cumulative
(Previous Cumulative %
+ Current % Retained)
2 1/2" 0.0 0.0 0.0
2" 0.0 0.0 0.0
1 3/4" 0.0 0.0 0.0
1 1/2" 0.0 0.0 0.0
7/8" 308.7 38.3 38.3
3/4" 107.2 13.3 51.5
5/8" # 152.5 4 18.9 70.5
1/2" # 89.8 # 11.1 81.6
3/8" # 110.1 # 13.6 95.2
1/4" # 36.8 # 4.6 99.8
#4 # 0.4 # 0.0 99.8
#16 # 0.1 # 0.0 99.9
Remaining Soils # 1.2 1 0.1 100.0
21-0547
B. Cazares
806.8
GAFB / 21E0298
C4 0" - 12"
Item 247
Flexible Base
1. DESCRIPTION
Construct a foundation course composed of flexible base.
2. MATERIALS
Furnish uncontaminated materials of uniform quality that meet the requirements of the plans and specifications. Notify the Engineer of the proposed material sources and of changes to material sources. The Engineer may sample and test project materials at any time before compaction throughout the duration of the project to assure specification compliance. Use Tex-100-E material definitions.
2.1. Aggregate. Furnish aggregate of the type and grade shown on the plans and meeting the requirements of Table 1. Each source must meet Table 1 requirements for liquid limit, plasticity index, and wet ball mill for the grade specified. Do not use additives, such as but not limited to lime, cement, or fly ash to modify aggregates to meet the requirements of Table 1 unless shown on the plans.
Table 1 Material Requirements
2.1.1. Material Tolerances. The Engineer may accept material if no more than 1 of the 5 most recent gradation tests has an individual sieve outside the specified limits of the gradation.
Property Test Method Grade 1–2 Grade 3 Grade 42 Grade 5
Sampling Tex-400-A
Master gradation sieve size (cumulative % retained)
Tex-110-E
2-1/2" 0 0
As shown on the plans
1-3/4" 0–10 0–10 0–5
7/8" 10–35 – 10–35
3/8" 30–65 – 35–65
#4 45–75 45–75 45–75
#40 65–90 50–85 70–90
Liquid Limit, % Max Tex-104-E 40 40 As shown on the plans
Plasticity Index, Max1 Tex-106-E
10 12 As shown on the plans
Plasticity index, Min1 As shown on the plans As shown on the plans As shown on the plans As shown on the plans
Wet ball mill, % Max
Tex-116-E
40 – As shown on the plans
Wet ball mill, % Max increase passing the #40 sieve
20 – As shown on the plans
Min compressive strength, psi
Tex-117-E
As shown on the plans lateral pressure 0 psi 35 – – lateral pressure 3 psi – – 90 lateral pressure 15 psi 175 – 175
1. Determine plastic index in accordance with Tex-107-E (linear shrinkage) when liquid limit is unattainable as defined in Tex-104-E.
2. Grade 4 may be further designated as Grade 4A, Grade 4B, etc.
When target grading is required by the plans, no single failing test may exceed the master grading by more than 5 percentage points on sieves No. 4 and larger or 3 percentage points on sieves smaller than No. 4.
The Engineer may accept material if no more than 1 of the 5 most recent plasticity index tests is outside the specified limit. No single failing test may exceed the allowable limit by more than 2 points.
2.1.2. Material Types. Do not use fillers or binders unless approved. Furnish the type specified on the plans in accordance with the following:
2.1.2.1. Type A. Crushed stone produced and graded from oversize quarried aggregate that originates from a single, naturally occurring source. Do not use gravel or multiple sources.
2.1.2.2. Type B. Crushed or uncrushed gravel. Blending of 2 or more sources is allowed.
2.1.2.3. Type C. Crushed gravel with a minimum of 60% of the particles retained on a No. 4 sieve with 2 or more crushed faces as determined by Tex-460-A, Part I. Blending of 2 or more sources is allowed.
2.1.2.4. Type D. Type A material or crushed concrete. Crushed concrete containing gravel will be considered Type D material. Crushed concrete must meet the requirements in Section 247.2.1.3.2., “Recycled Material (Including Crushed Concrete) Requirements,” and be managed in a way to provide for uniform quality. The Engineer may require separate dedicated stockpiles in order to verify compliance.
2.1.2.5. Type E. Caliche, iron ore or as otherwise shown on the plans.
2.1.3. Recycled Material. Reclaimed asphalt pavement (RAP) and other recycled materials may be used when shown on the plans. Request approval to blend 2 or more sources of recycled materials.
2.1.3.1. Limits on Percentage. Do not exceed 20% RAP by weight, when RAP is allowed, unless otherwise shown on the plans. The percentage limitations for other recycled materials will be as shown on the plans.
2.1.3.2. Recycled Material (Including Crushed Concrete) Requirements.
2.1.3.2.1. Contractor-Furnished Recycled Materials. Provide recycled materials, other than RAP, that have a maximum sulfate content of 3,000 ppm when tested in accordance with Tex-145-E. When the Contractor furnishes the recycled materials, including crushed concrete, the final product will be subject to the requirements of Table 1 for the grade specified. Certify compliance with DMS-11000, “Evaluating and Using Nonhazardous Recyclable Materials Guidelines,” for Contractor furnished recycled materials. In addition, recycled materials must be free from reinforcing steel and other objectionable material and have at most 1.5% deleterious material when tested in accordance with Tex-413-A. For RAP, do not exceed a maximum percent loss from decantation of 5.0% when tested in accordance with Tex-406-A. Test RAP without removing the asphalt.
2.1.3.2.2. Department-Furnished Required Recycled Materials. When the Department furnishes and requires the use of recycled materials, unless otherwise shown on the plans:
Department-required recycled material will not be subject to the requirements in Table 1, Contractor-furnished materials are subject to the requirements in Table 1 and this Item, the final product, blended, will be subject to the requirements in Table 1, and for final product, unblended (100% Department-furnished required recycled material), the liquid limit, plasticity index, wet ball mill, and compressive strength is waived.
Crush Department-furnished RAP so that 100% passes the 2 in. sieve. The Contractor is responsible for uniformly blending to meet the percentage required.
| B140 - Work Task _ 4825377 3C - 140 - WT - STRUCTURE SHOP - AEROBIC RO.pdf |
| B140 - Site Dwg.pdf |
| Sheets and Views |
| ANSI A |
File details come from the government source that posted it. Updated .