B-3420 Chiller Rental SOW Rev2.pdf
PDF 74 KB Posted
- Attached to
- EMERGENCY RENTAL OF CHILLER BLDG B3420
- Solicitation number
- FA303022Q0014
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW
Bldg‐3420 Emergency Temporary Rental Chiller
Provide, install and setup and start a comparably sized (15 Ton) temporary chiller. Chiller will be piped from the temporary chiller to the temporary connections installed by facilities.
Provide and install all piping connections, lines and supports needed to hook up all water lines to the existing water connections installed by facilities where the existing chiller was connected.
Provider shall place rental chiller within 100 feet of existing chiller.
Provide and install any and all electrical materials needed to connect the rental equipment to the existing electrical on site.
Provide any and all maintenance requirements for the rental equipment for the duration of the rental contract term.
The voltage for the chiller is 460 volt 3 phase, the disconnect for the unit is rated at 600 volt 60 amp, the chiller breaker is a 3 pole 50 amp breaker.
The distance from the current site to the disconnect is 6’. The distance from th temporary site to the existing disconnect is 26’.
The existing pipe size is 2” copper, there are two (2) inch brass shut off valves for temporary connections, 2” female thread. The temporary piping is located at the chiller.
Temporary pipe fitting are two (2) 2” brass shut off valve female threaded.
The distance from the temporary chiller location to the water chilled water connections is 32’.
File details come from the government source that posted it. Updated .