EMERGENCY RENTAL OF CHILLER BLDG B3420
Solicitation number
FA303022Q0014
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOW

Bldg‐3420 Emergency Temporary Rental Chiller

Provide, install and setup and start a comparably sized (15 Ton) temporary chiller. Chiller will be piped from the temporary chiller to the temporary connections installed by facilities.

Provide and install all piping connections, lines and supports needed to hook up all water lines to the existing water connections installed by facilities where the existing chiller was connected.

Provider shall place rental chiller within 100 feet of existing chiller.

Provide and install any and all electrical materials needed to connect the rental equipment to the existing electrical on site.

Provide any and all maintenance requirements for the rental equipment for the duration of the rental contract term.