AFForm66Attachment8.xls

XLS spreadsheet 46 KB Posted

Attached to
Pavement IDIQ Federal contract opportunity
Solicitation number
FA303008R0004
Issued by
Department of the Air Force Air Education and Training Command

About this file

AF. FM. 66

View the file

Other files for this federal contract opportunity

Other files attached to Pavement IDIQ, newest first.
File Type Posted
Amendment02.doc DOC document
Amendment01.doc DOC document
INSURANCECERTIFICATEAttachment4.doc DOC document
TX080028Attachment2.doc DOC document
PPQuestionnaireAttachment6.doc DOC document
DrawingsAttachment7.pdf PDF
TaskOrderAttachment5.doc DOC document
SFLLLAttachment3.pdf PDF
FullSpecsAttachment1.DOC DOC document
Pavementsol.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER: JCGU 08-1700PROJECT TITLE: Base Pavements IDIQSOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY THE PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL (Ref spec & para no.)CERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYOPERATING INSTRUCTIONSSEE PARAOTHERS AS SPECIFIEDREQUIRED SUBMISSION DATEDATE RECEIVED IN CON-TRACTINGDATE TO CIVIL ENGINEER-INGRETURN SUSPENSE DATEFOLLOW UPDATE CONTRACTOR NOTIFIEDCONTRACT-TOR RE-SUBMITTALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
1Section 01010, 2.1.1.5 & 5.1, Traffic Control Schedule4bGA
2Section 01010, 2.1.1.6, Utilty Outage Plan4bGA
3Section 01010, 2.2, Progress Schedule4bGA
4Section 01010, 4.2, Accident Prevention Plan4aFIO
5Section 01010, 4.4, Radiation Permit4aGA
6Confined Space Plan, 4.54bFIO
7Section 01010, 7, Storage Area4bGA
8Section 01010, 12.1, As-Builts4dGA
9Section 01010, 12.1.2, DD Form 13544dGA
10Section 01010, 15, Warranties4dFIO
1101020, Para 2.1, Work Clearance Request, AF Form 1034bGA
1201020, Para 3.3, Customer Service Inspection Checklist4dGA
13Section 01020, 4, Fire Hydrant Use Request4eFIO
14Section 01400, 2.4, SWPPP4bGA
15Section 01400, 3.3 & 6.1, Hazardous Wastes MSDS4bGA
16Section 01400, 2.3, NOI/NOT4bFIO
17Section 01400, 2.6, Air Quality Report4bGA
18Section 01400, 3.4, Disposal of Waste4bGA
19Section 01400, 5, Reports4bFIO
20Section 01400, 6.1, Hazmat List4bGA
21Section 01400, 6.2.1.1, EPCRA Information4bFIO
22Section 01400, 6.2.1.2, Use of HazMat4bFIO
23Section 01400, 10.3, Well Work Report4bFIO
24Section 01505, 1.3.1, & 1.4, Demolition Waste Management Plan4bFIO
25Section 01540, 1.3.1, Affirmative Procurement Reporting Form4aGA
26Section 01540, 1.3.2, Manufacturer Data, Certificates, & Samples4aFIO
27Section 02050, 1.3.1, Demolition Work Plan4bGA
28Section 02050, 1.3.2, Procedures for Removal of Asbestos4bGA
29Section 02110, 1.5, Crack Sealant Material Data4bGA
30Section 02125, 1.4, Mix Design4bFIO
31Section 02222, 1.3, Test Reports & Certificates4eGA
32Section 02222, 1.3, Location of Stockpile Area4bFIO
33Section 02240, 1.6, Test Reports4eGA
34Section 02241, 1.4, 1.7, Test Reports, Results and Records4eGA
35Section 02242, Para 1.2, Sampling and Testing4eGA
36Section 02310, Para 1.2, Sampling and Testing4eGA
37Section 02510, Para 1.4.1, Work Plan4dGA
37aSection 02510, Para 1.4.2, Reports4eGA
38Section 02511, Para 1.3, Test Reports4dGA
39Section 02511, Para 1.3, Records4dGA
40Section 02511, Para 1.3, Material Data/Certificates of Compliance4bFIO
41Section 02511, Para 1.3, Concrete Mix Design4bFIO
42Section 02550, 1.2, Test Reports and Records4eGA
43Section 02551, 1.3 & 1.8, Records, Sampling/Testing4eGA
44Section 02555, 1.2, Records4eGA
45Section 02555, 3.2, Manufacturer's Test Reports4dGA
46Section 02558, 1.2, Test Results and Records4eGA
47Section 02559, 1.2, Test Reports and Records4eGA
48Section 02577, 1.2.1, Paint4bGA
49Section 02577, 1.2.2, Pavement Markers4bGA
50Section 02720, 1.2, Product Material4bGA
51Section 02940, 1.2, Site Plan and Product Data4bGA
52Section 03200, 1.2.1, Detail Drawings4bGA
53Section 03300, 1.2, Concrete Mix, Test Results, Certificate of Compliance & Dye Selection4b,dGA
54Section 03320, 1.2, Test Reports & Records4eGA
55Section 03330, Para 1.2, Sampling and Testing4dGA
56Section 03450, Para 1.4, Calculations/Mix Design/ Detailed Drawings4bGA
57Section 03450, Para 1.4, Test Reports4dGA
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP for Basic Contract
(b) No Later Than 7 Calendar Days after Task Order NTP
(c) Prior to Final Inspection of Task Order
(d) Final Inspection of Task Order
(e) As Required per Specifications

&LAttachment 8

FA3030-08-R-0004&CPAGE &P OF &N

&CFORM66.xls

Sheet2

&A Page &P

File details come from the government source that posted it. Updated .