RFI 002 - B708 Chiller.pdf

PDF 60 KB Posted

Attached to
Replace 80 Ton, Air-Cooled Scroll Chiller - Service Federal contract opportunity
Solicitation number
FA302224Q0323
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document is a Request for Information (RFI) related to the replacement of an 80-ton Daikin air-cooled scroll chiller located at Columbus Air Force Base, Mississippi. The key details are:

The government is seeking information on the replacement of the existing chiller, including responsibility for offloading the chiller, electrical specifications, chiller design requirements (entering/leaving water temperatures, GPM, glycol usage), and communication protocol needs (BACnet IP, BACnet MSTP, or LON). The current chiller uses R22 refrigerant and is installed behind the facility in a partially fenced area. The government may be able to provide the specifications for the current chiller. The replacement chiller is to be sole sourced from Daikin and delivered to the base, with the government responsible for installation and startup in accordance with warranty requirements.

View the file

Other files for this federal contract opportunity

Other files attached to Replace 80 Ton, Air-Cooled Scroll Chiller - Service, newest first.
File Type Posted
RFI - Completed B708 Chiller.pdf PDF
ATT 2 - Provisions and Clauses.pdf PDF
Combined Synopsis-Solicitation.pdf PDF
ATT 1 - Statement of Need.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI 002 – B708 Chiller Replacement

1 - Did Daikin Come on Site to Confirm what is Needed for the Replacement of the 80-ton Daikin Air-Cooled Scroll Chiller?

A. No, but the expected specs are pulled from a recommended replacement.

2 – Whose Responsibility is it to Off Load the Chiller?

A. It will be the responsibility of the Government to off load the chiller.

3 – What the Voltage of the chiller?

(3, 4, & 7 are collectively answered below question 7)

4 - Design of the chiller:

• What entering water temperature and leaving water temperatures desired?

• What is the GPM?

• Is there any glycol in the system?

• If so, what type and percentage?

5 - What is the chiller being used for?

• Comfort Cooling?

• Process?

• If it is process related, will the chiller run all year long?

• If it is process related, will the load fluctuate much or is it pretty constant (In other words, are there multiple process lines that shut off / turn on)

A. Comfort cooling

6 - Is there a Building Automation System?

A. The building is monitored by a centralized EMCS

7 - Do you need BACnet IP, BACnet MSTP, or LON communication?

A. There is no glycol in the system.

Air-cooled Scroll Chiller Specifications:

• 460/3/60

• 80 Nominal Tons

• R32 Refrigerant

• Across the Line Starter

• Single Layer Evaporator insulation

• Microchannel Condenser Colis

• Condenser Coil Louvers and Base Area Wire Grilles

• Low Ambient to 32⁰F

• Single Point Disconnect with Circuit Protection

• Phase and Voltage Protection

• 65 kA SCCR

• Combination Communications Interface (BACnet MS/TP, BACnet IP, Modbus)

• Evaporator Strainer Thermal Dispersion Evaporator Flow Switch

• RIS Isolators

• 1st Year Entire Unit Parts, Labor and Refrigerant Warranty

• 5 Years Compressor Parts warranty

• Factory Startup

8 - What does the system look like? Can the Government Issue any Pictures?

A. The current chiller is installed behind the facility in a partially fenced area. No pictures are currently available to provide.

9 - Are there blueprints or Specs on the Chiller that’s already there?

A. We may be able to provide the specs for the current chiller, but question why we would need to at this time. A dated R22 system is currently installed.