Attachment_4-B411_Drawings.pdf

PDF 210 KB Posted

Attached to
Maintain Shop Floors
Solicitation number
FA302218R0021
Issued by

About this file

B411 Drawings

View the file

Other files

File Type Posted
Attachment_2-B304_Drawings.pdf PDF
Attachment_1-Overall_Statement_of_Work_2018.pdf PDF
Attachment_7-WD_MS180168.pdf PDF
Attachment_6_DD1354.pdf PDF
Attachment_3-B306_Drawings.pdf PDF
Attachment_5-AF_Form_66_2018.xlsx XLSX spreadsheet
FA302218R0021.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EEPZ 98-2021X: Maintain Shop and Youth Center Floors B411/304/306/348

DESIGN DRAWING: Phase 1 : 06/06/2017

DESIGN DRAWING: Painted Line Locations : 06/06/2017

DESIGN DRAWING: Phase 2 : 06/06/2017

DESIGN DRAWING: Area of Work : 06/06/2017

B411 Phase 1
B411-Painted Lines-Plan Ovrlay
B411-Phaseing 2
Bldg 411
Drawing 01-Area of Work

File details come from the government source that posted it.